Loading...
9-282-Order Recorded 12/2/1964VOL G£; a In the Matter ~f IN THE COUNTY COURT OF THE STATE CF OREGON Installations of Pipe FOR THE COUNTY OF DESCHUTES O R D E R Line ) A permit is granted by Deschutes County to R. A. MILLER. to install a pipe line on er across Deschutes County right-of-way. A de- tailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Jnsta.llir Pine, Line Parallel: An eight inch water lineAlI pipe lines running parallel T,rz h the road shall be in the existing ditch line, or no less than three (3) feet frr:m the edge of the existing pavement edger All pipe lines must be in- U-ailed to a depth to be no less than two (2) feet and properly backfilled to the °iginal grade line and with abstikstbfiolichotblith4irdtai4age area. Permittee shall -e res^,r,ible for any or all damages to the existing pavement, and shoulders or ut'ner or areas within the right-9f-way. In^t^.1'i. 1 Fire Line Transverse: An eight inch water lid pipe line installations lnid transv-:rscly to the road bed or right-of way shall be installed in the following manner: -,11 pavement cuts prior to excavation shall be had8:_ff1t1i ar_btbaking hammer s~-) as to -.,sure neat finish cut lines. All pipe lines shall IDe installed to a depth n^ lest; than two (2) feet below the existing roadside ditch elevation. In all cases where a water line is installed in a transverse direction the water pipe must b-~ insta.,_led within a larger pipe which size shall be no less than six (6) inches in diarrcter. "a,ckfi.lling and Paving: The permittee shall be required to properly back- the tren_--h in such a manner as to guarantee a well compacted, stabilized sub- base pri^r to paving. The pavement must be replaced tc. its original line, crown, and grade with an asphalt mixture to conform with the surrounding read bed. The area -y installation must be kept smooth for the traveling public at all times. The nermittee will be required at all times to take every precaution to protect the tr=velirg public. All signs and traffic controls shall be furnished by the permit - tes. T-) reg.sr-1 tc± ether utility installati*ns, such as gas lines, telephone lines, and electric conduits, all the general specifications shall apply if they are tr be run under grcird, with me exception: It would not be necessary to have these lines within a larger pipe when crossing the right-of-way. Dated thisZliday of ~~reryr`ioyr , 196lr~ar end d A p / l es L. P1urrmers Roadmaster DESCHUTES COUNTY App~r";gyred C:~un e t L,~,._., D(' COUT3'I''f C01,11ISSIONER i PE iIT'TEE 4 s Deschutes County will do the road repair patching and the Fermittee will be billed for the repair. VOL 9 ?-Au 2'K) "Permit to: continued '2" f^r a culvert, the proper size and length must be determined, and also put cn the aa.p, The permittee will be responsible for the construction of the access and all ',hc cysts of the materials used in the access. If at ary time this installation in any way impcd.es the progress of future main- tai_na n.cc or construction, the permittee will be r~:quired to move this installation it-.s own expense. Deschutes County will assume no res )onsibility for damage to A d installation as result of maintainance or construction. Failure of permittee ro cc,m-olv with performance of work will result in a charge for work performed.by 1;:scilut a County, Re end^d App ovf arlcs r oadmastor DESCHUTES COUNTY nreved Cou. ourt: G,)Jiii JUDG C. PE 14I {TLE 7 00 ~'IFSIID77 O / J j W f, J Yee ~r MuR~ 0!~ a Nl~ .~sQ rk r- UL Q 1n B ND T18 S.. R/2 E Whf SECTION / 7