8-416-Resolution Recorded 12/19/1962IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHU`i'ES
In the Mat -ter of the Establishment )
of ) RESOLUTION FOR ROAD
The College Road, a County Road }
BE IT REMEMBERED, That a regular term of the County Court of Deschutes County,
Oregon, begun and held at the County Court House in Bend, in said County on Wednesday,
December 19, 1962, and continued from day to day thereafter to and including the date
of this resolution, the same being a regular term of said County Court sitting for the
transaction of County business, and at which time said Court may legally, by resolution,
propose any County road the following, among other proceedings, was had, to -wit:
WHEREAS, it is hereby considered that a public necessity exists for the estab-
lishment of the road hereinafter described, said Court does hereby declare its intention
to establish a County road in Deschutes County, Oregon, by resolution, described as
follows, to -wit:
Beginning at Engineer's center line Station 9+77.86 on the north
line of the NW4 of the SE� of Section 25, Township 17 S., Range
11 E.W.M., said point being 4.8.3 ft. west (when measured along
the north line of the aforesaid NW4SEk) of the NW;SE�-, Section 25,
Township 17 S., Range 11 E.W.M.; thence S 7046/5011 E, 1139.96 ft;
thence along the arc of a 954.93 ft. radius curve left (the long
chord of which bears S 34012f45" E) 881.06 ft.; thence S 60038140t1 E,
175.61 ft.; thence along the are of a 572.96 ft, radius curve right
(the long chord of which bears 54601315811 E) 288.24 ft; thence
S 31049115" E, 116.29 ft.; thence along the are of a 716.20 ft.
radius curve left (the long chord of which bears S 45043147" E)
34.7.45 ft.; thence S 590371 E, 73.53 ft. to Engineer's center line
Station 40+00 P.O.T., said point being 149.45 feet north of the
SE corner of the aforesaid Section 25; thence South 590371 E,
133.42 ft.; thence along the are of a spiral curve right (the long
chord of which bears S 580071 E) 300 ft.; thence along the are of
a 1909.86 ft. radius curve right (the long chord of which bears
S 540141 E) 58.39 ft.; thence along the arc of a spiral curve right
(the long chord of which bears S 500211 E) 300 ft.; thence S 4805111 E,
315.86 ft.; thence along the are of a spiral curve right (the long
chord of which bears S 4601111 E) 400 ft.; thence along the arc of a
1432.39 ft. radius curve right ( the long chord of which bears
S 39042125" E) 57.15 ft.; thence along the are of a spiral curve
right (the long chord of which bears S 33013150" E) 400 ft.; thence
S 30033150" E, 111.87 ft.; thence along the are of a 150.78 ft.
radius curve left (the long chord of which bears S 5905412511 E)
154.44 ft. to Engineer's center line Station 62+31.63 P.T. said
point being on the center line of the Shevlin Park County Road.
NOW THEREFORE, IT IS HEREBY ORDERED That the County Roadmaster or his duly
qualified deputy, shall give notice of this Resolution by posting true copies thereof,
properly certified to as such by the County Clerk, at the place of holding County Court
and also at three public places in the vicinity of said proposed road thirty days pre-
vious to the consideration of this Resolution by the County Court, notifying all persons
concerned that said Resolution will be considered and passed upon by this Court at a
regular meeting on the 6th day of February, 1963, at which time the Court will consider
any objections or remonstrances which may be filed on account of said road.
Dated at Bend, Deschutes County, Oregon, this 1,9thday of Decent er,, 1962.
County Judge
County Commissioner
CountAr Com1911 sinner
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
STATE OF OREGON )
ss. PROOF OF POSTING
County of Deschutes )
I, Charles L. Plummer, Deschutes County Roadmaster, being first
duly sworn, depose and say that on December 19, 1962, I gave notice of the
County Courtts intention to establish ttxe College County Road in Deschutes
County, Oregon, by posting four (4) copies of the attached "Resolution" at
the following places, to—wit:
One notice posted on the bulletin board in the entrance to the
County Court House; one on a power pole at the south end of the project, and
on the north right of way line of Shevlin Park Road; one on a 20 inch double
pine tree on north right of way line midway through project; and one posted
on a 20 inch double pine tree 40 feet west of center line of proposed road
and on north boundary line of College property.
qA
County Roadmaster
Subscribed and sworn to before me this 21st day of December, 1962.
Court y Clerk
Deputy—