Loading...
8-416-Resolution Recorded 12/19/1962IN THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHU`i'ES In the Mat -ter of the Establishment ) of ) RESOLUTION FOR ROAD The College Road, a County Road } BE IT REMEMBERED, That a regular term of the County Court of Deschutes County, Oregon, begun and held at the County Court House in Bend, in said County on Wednesday, December 19, 1962, and continued from day to day thereafter to and including the date of this resolution, the same being a regular term of said County Court sitting for the transaction of County business, and at which time said Court may legally, by resolution, propose any County road the following, among other proceedings, was had, to -wit: WHEREAS, it is hereby considered that a public necessity exists for the estab- lishment of the road hereinafter described, said Court does hereby declare its intention to establish a County road in Deschutes County, Oregon, by resolution, described as follows, to -wit: Beginning at Engineer's center line Station 9+77.86 on the north line of the NW4 of the SE� of Section 25, Township 17 S., Range 11 E.W.M., said point being 4.8.3 ft. west (when measured along the north line of the aforesaid NW4SEk) of the NW;SE�-, Section 25, Township 17 S., Range 11 E.W.M.; thence S 7046/5011 E, 1139.96 ft; thence along the arc of a 954.93 ft. radius curve left (the long chord of which bears S 34012f45" E) 881.06 ft.; thence S 60038140t1 E, 175.61 ft.; thence along the are of a 572.96 ft, radius curve right (the long chord of which bears 54601315811 E) 288.24 ft; thence S 31049115" E, 116.29 ft.; thence along the are of a 716.20 ft. radius curve left (the long chord of which bears S 45043147" E) 34.7.45 ft.; thence S 590371 E, 73.53 ft. to Engineer's center line Station 40+00 P.O.T., said point being 149.45 feet north of the SE corner of the aforesaid Section 25; thence South 590371 E, 133.42 ft.; thence along the are of a spiral curve right (the long chord of which bears S 580071 E) 300 ft.; thence along the are of a 1909.86 ft. radius curve right (the long chord of which bears S 540141 E) 58.39 ft.; thence along the arc of a spiral curve right (the long chord of which bears S 500211 E) 300 ft.; thence S 4805111 E, 315.86 ft.; thence along the are of a spiral curve right (the long chord of which bears S 4601111 E) 400 ft.; thence along the arc of a 1432.39 ft. radius curve right ( the long chord of which bears S 39042125" E) 57.15 ft.; thence along the are of a spiral curve right (the long chord of which bears S 33013150" E) 400 ft.; thence S 30033150" E, 111.87 ft.; thence along the are of a 150.78 ft. radius curve left (the long chord of which bears S 5905412511 E) 154.44 ft. to Engineer's center line Station 62+31.63 P.T. said point being on the center line of the Shevlin Park County Road. NOW THEREFORE, IT IS HEREBY ORDERED That the County Roadmaster or his duly qualified deputy, shall give notice of this Resolution by posting true copies thereof, properly certified to as such by the County Clerk, at the place of holding County Court and also at three public places in the vicinity of said proposed road thirty days pre- vious to the consideration of this Resolution by the County Court, notifying all persons concerned that said Resolution will be considered and passed upon by this Court at a regular meeting on the 6th day of February, 1963, at which time the Court will consider any objections or remonstrances which may be filed on account of said road. Dated at Bend, Deschutes County, Oregon, this 1,9thday of Decent er,, 1962. County Judge County Commissioner CountAr Com1911 sinner IN THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES STATE OF OREGON ) ss. PROOF OF POSTING County of Deschutes ) I, Charles L. Plummer, Deschutes County Roadmaster, being first duly sworn, depose and say that on December 19, 1962, I gave notice of the County Courtts intention to establish ttxe College County Road in Deschutes County, Oregon, by posting four (4) copies of the attached "Resolution" at the following places, to—wit: One notice posted on the bulletin board in the entrance to the County Court House; one on a power pole at the south end of the project, and on the north right of way line of Shevlin Park Road; one on a 20 inch double pine tree on north right of way line midway through project; and one posted on a 20 inch double pine tree 40 feet west of center line of proposed road and on north boundary line of College property. qA County Roadmaster Subscribed and sworn to before me this 21st day of December, 1962. Court y Clerk Deputy—