Loading...
2006-905-Order No. 2006-137 Recorded 9/15/2006REVIEWED LEGAL COUNSEL COUNTY OFFICIAL NANCYUBLANKENSHIP, COUNTY CLERKDS CJ X006.905 COMMISSIONERS' JOURNAL 09/15/2006 02.51.06 PM 2006-90'5 For Recording Stamp Only BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON An Order Setting a Construction Speed Limit of 45 miles Per Hour on South Century Drive ORDER NO. 2006-137 from Milepost 2.15 to Milepost 3.65 WHEREAS, commencing on or about September 25, 2006, Sunriver Resort Limited Partnership will begin a road construction project on South Century Drive between Milepost 2.15 to Milepost 3.65; and WHEREAS, the statutorily designated speed for the subject section of South Century Drive is 55 miles per hour; and WHEREAS, the Deschutes County Road Department, pursuant to the provisions of ORS 810.180(8), has determined that the construction project constitutes a hazard to the public traveling over South Century Drive and a hazard to workers working on the construction project; and WHEREAS, based upon said engineering determination of danger to the public and to workers on the construction project, the County Engineer has found that a reduced temporary designated speed of 45 miles per hour for the subject section of South Century Drive during the time of the construction project is necessary to protect the safety of the public and workers; now, therefore, THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON, HEREBY ORDERS as follows: Section 1. That the designated speed for the following section of road for the duration of the subject construction project shall be as follows: Road Name: South Century Drive Project Name: Caldera Springs Designated Speed: 45 miles per hour From: Milepost 2.15 (Spring River Road/South Century Drive intersection) To: Milepost 3.65 Section 2. That the Road Department shall install appropriate signs giving notice of the temporary designated speed per ORS 810.180, Subsection 8(d). Section 3. That the signs installed pursuant to this order shall comply with the provisions of ORS 810.210 and 810.220. PAGE 1 OF 2- ORDER Section 4 That this temporary designated speed is in effect for the subject section of road for as long as travel lanes are diverted or narrowed and/or there is shoulder activity adjacent to traffic or so long as work on the construction project poses a hazard to the public and/or workers on the project, to be determined in the judgment of the County Engineer. Section 5. That this temporary designated speed shall be rescinded when traffic is restored to normal travel lane use, frequent work activity adjacent to traffic is no longer present and work on the construction project no longer poses a hazard to the public and/or workers on the project, as determined by the County Engineer. Section 6. That this Order shall be recorded with the Deschutes County Clerk, and a copy shall be filed with the Deschutes County Road Department 07 DATED this 15 day of '2006. BOARD OF COUNTY COMMISSIONERS OF DESCHUTES-COUNTY, OREGON IS) R. LUKE, CHAI ATTEST: Recording Secretary BEV CLARNO, VICE CHAIR M C AEL M. DALY, CO ISSIONER PAGE 2 OF 2- ORDER -VES c zO Q A %AA- Road Department 61150 SE 27th St. • Bend, Oregon 97702 (541) 388-6581 • FAX (541) 388-2719 MEMORANDUM TO: BOARD OF COUNTY COMMISSIONERS FROM: GEORGE KOLB, COUNTY ENGINEER SUBJECT: ORDER NO. 2006-137 SETTING A CONSTRUCTION SPEED LIMIT OF 45 MPH FOR SOUTH CENTURY DRIVE DATE: 9/13/2006 CC: MARK AMBERG, LEGAL. COUNSEL Before the Board for signature is Order No. 2006-137 setting a construction speed limit of 45 mph for South Century Drive from milepost 2.15 to 3.65 (see attached vicinity map). Discussion: Sunriver Resort Limited Partnership is in the process of developing Caldera Springs Resort just south of Sunriver on the east side of South Century Drive. This development is located just west of the existing Crosswaters Destination Resort. A condition of the land use application for Caldera Springs Resort required the resort to build a left turn lane on South Century Drive for the entrance to the resort. Both Sunriver Resort Limited Partnership and Crosswaters Resort requested that the Road Department set a temporary construction speed limit on South Century Drive during the construction of the turn lane. The Road Department worked with ODOT to determine the criteria for this speed limit and determined that this stretch of road would qualify for the reduced speed limit during construction. Once the work is completed, the Road Department will remove the signs and the original speed limit of 55 mph will apply Recommendation The Road Department recommends signature of Order No. 2006-137 Quality Services Performed with Pride South Century Drive Construction Speed Limit - ----SPRING RIVER, RD j , l- C, Location of 45 mph U) Construction Speed - Limit /1:~C' I 1 I 97 Caldera Springs LL7 j ~_1-1LW l ii j ~I L 11JJ1~ ~ j~ ii L I- I ~ ~1 ~_f111_J - fu j 0 1,500 3,000 4,500 Feet Key Printed: September 7, 2006 Construction Speed 45 The information on this map was derived from digftal databases on Deschutes County Road Department Other Roads Deschutes County's G.I.S. Care was taken in the creation of this reP map, but it is provided "as is". Deschutes County cannot ac t an a,,. Railroad ® responsibility for errors, omissions, or positional accuracy in the digital i John Anderson, GIS Specialist TaxlOts data or the underlying records. There are no warranties, express or ~L~ L tF ' Phone: (541) 322-7102 implied, including the warranty of merchantability or fitness foe LOL L I ® Ernail:johna@co.deschutes.or.us particular purpose, accompanying this product. However, notification 5 Address: 61150 SE 27th St of arty errors will be appreciated. Mr9mr- 41110, It Bend, OR 97702 PAArcGIS_Projects\Speeds\S Century)