2006-905-Order No. 2006-137 Recorded 9/15/2006REVIEWED
LEGAL COUNSEL
COUNTY OFFICIAL
NANCYUBLANKENSHIP, COUNTY CLERKDS CJ X006.905
COMMISSIONERS' JOURNAL 09/15/2006 02.51.06 PM
2006-90'5
For Recording Stamp Only
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON
An Order Setting a Construction Speed Limit
of 45 miles Per Hour on South Century Drive ORDER NO. 2006-137
from Milepost 2.15 to Milepost 3.65
WHEREAS, commencing on or about September 25, 2006, Sunriver Resort Limited
Partnership will begin a road construction project on South Century Drive between Milepost 2.15 to
Milepost 3.65; and
WHEREAS, the statutorily designated speed for the subject section of South Century Drive is
55 miles per hour; and
WHEREAS, the Deschutes County Road Department, pursuant to the provisions of ORS
810.180(8), has determined that the construction project constitutes a hazard to the public traveling
over South Century Drive and a hazard to workers working on the construction project; and
WHEREAS, based upon said engineering determination of danger to the public and to workers
on the construction project, the County Engineer has found that a reduced temporary designated
speed of 45 miles per hour for the subject section of South Century Drive during the time of the
construction project is necessary to protect the safety of the public and workers; now, therefore,
THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON,
HEREBY ORDERS as follows:
Section 1. That the designated speed for the following section of road for the duration of the
subject construction project shall be as follows:
Road Name: South Century Drive
Project Name: Caldera Springs
Designated Speed: 45 miles per hour
From: Milepost 2.15 (Spring River Road/South Century Drive intersection)
To: Milepost 3.65
Section 2. That the Road Department shall install appropriate signs giving notice of the
temporary designated speed per ORS 810.180, Subsection 8(d).
Section 3. That the signs installed pursuant to this order shall comply with the provisions of
ORS 810.210 and 810.220.
PAGE 1 OF 2- ORDER
Section 4 That this temporary designated speed is in effect for the subject section of road for
as long as travel lanes are diverted or narrowed and/or there is shoulder activity adjacent to traffic or
so long as work on the construction project poses a hazard to the public and/or workers on the
project, to be determined in the judgment of the County Engineer.
Section 5. That this temporary designated speed shall be rescinded when traffic is restored
to normal travel lane use, frequent work activity adjacent to traffic is no longer present and work on
the construction project no longer poses a hazard to the public and/or workers on the project, as
determined by the County Engineer.
Section 6. That this Order shall be recorded with the Deschutes County Clerk, and a copy
shall be filed with the Deschutes County Road Department
07
DATED this 15 day of '2006.
BOARD OF COUNTY COMMISSIONERS
OF DESCHUTES-COUNTY, OREGON
IS) R. LUKE, CHAI
ATTEST:
Recording Secretary
BEV CLARNO, VICE CHAIR
M C AEL M. DALY, CO ISSIONER
PAGE 2 OF 2- ORDER
-VES c
zO
Q A %AA- Road Department
61150 SE 27th St. • Bend, Oregon 97702
(541) 388-6581 • FAX (541) 388-2719
MEMORANDUM
TO: BOARD OF COUNTY COMMISSIONERS
FROM: GEORGE KOLB, COUNTY ENGINEER
SUBJECT: ORDER NO. 2006-137 SETTING A CONSTRUCTION SPEED LIMIT OF 45 MPH FOR SOUTH
CENTURY DRIVE
DATE: 9/13/2006
CC: MARK AMBERG, LEGAL. COUNSEL
Before the Board for signature is Order No. 2006-137 setting a construction speed limit of 45 mph
for South Century Drive from milepost 2.15 to 3.65 (see attached vicinity map).
Discussion:
Sunriver Resort Limited Partnership is in the process of developing Caldera Springs Resort just south
of Sunriver on the east side of South Century Drive. This development is located just west of the
existing Crosswaters Destination Resort. A condition of the land use application for Caldera Springs
Resort required the resort to build a left turn lane on South Century Drive for the entrance to the
resort. Both Sunriver Resort Limited Partnership and Crosswaters Resort requested that the Road
Department set a temporary construction speed limit on South Century Drive during the
construction of the turn lane. The Road Department worked with ODOT to determine the criteria
for this speed limit and determined that this stretch of road would qualify for the reduced speed limit
during construction. Once the work is completed, the Road Department will remove the signs and
the original speed limit of 55 mph will apply
Recommendation
The Road Department recommends signature of Order No. 2006-137
Quality Services Performed with Pride
South Century Drive Construction Speed Limit
- ----SPRING RIVER, RD
j ,
l- C,
Location of 45 mph U)
Construction Speed
- Limit /1:~C' I
1 I
97
Caldera Springs
LL7 j
~_1-1LW l ii
j ~I L 11JJ1~ ~ j~ ii L I- I ~ ~1
~_f111_J
- fu j
0 1,500 3,000 4,500
Feet
Key Printed: September 7, 2006
Construction Speed 45
The information on this map was derived from digftal databases on Deschutes County Road Department
Other Roads Deschutes County's G.I.S. Care was taken in the creation of this reP
map, but it is provided "as is". Deschutes County cannot ac t an a,,.
Railroad ® responsibility for errors, omissions, or positional accuracy in the digital i John Anderson, GIS Specialist
TaxlOts data or the underlying records. There are no warranties, express or ~L~ L tF ' Phone: (541) 322-7102
implied, including the warranty of merchantability or fitness foe LOL L I ® Ernail:johna@co.deschutes.or.us
particular purpose, accompanying this product. However, notification 5 Address: 61150 SE 27th St
of arty errors will be appreciated. Mr9mr- 41110, It Bend, OR 97702