2011-2846-Minutes for Meeting June 01,2011 Recorded 6/17/2011COUNTY OFFICIAL PI
NANCYUBLANKENSHIP, COUNTY CLERKDS yu 2011.2846
COMMISSIONERS' JOURNAL 06/17/201108:09:49 AM
11111111111)111111111111111111
20112Do not remove this page from original document.
Deschutes County Clerk
Certificate Page
Deschutes County Board of Commissioners
1300 NW Wall St., Suite 200, Bend, OR 97701-1960
(541) 388-6570 - Fax (541) 385-3202 - www.deschutes.ora
MINUTES OF WORK SESSION
DESCHUTES COUNTY BOARD OF COMMISSIONERS
WEDNESDAY, JUNE 19 2011
Present were Commissioners Alan Unger and Anthony DeBone; Commissioner
Tammy Baney had to leave the office. Also present were Dave Kanner, County
Administrator; Erik Kropp, Deputy County Administrator; and, for a portion of the
meeting, Joe Studer, County Forester; Laurie Craghead, County Counsel; Dan
Sherwin, Road Department; and Teresa Rozic, Property & Facilities.
Also present were approximately 25 other citizens, including COCC Forestry
students, instructors; representatives of the Oregon Department of Forestry, the
BLM, the Oregon Department of Fish & Wildlife and the Deschutes National
Forest; and a few individuals who live in the area near a property to be discussed.
Vice Chair DeBone opened the meeting at 1:50 p.m.
1. Capstone Presentation.
Joe Studer gave an overview of the history of the program, which has been very
beneficial to the County. The most recent project was related to County-owned
property located off Rickard Road southeast of Bend.
The various students gave an overview of the program. The objective was to
write a management plan for this property. (A PowerPoint presentation was
given, and a copy is attached for reference)
They spoke about the soils on the property. There are three types common in
the region that are susceptible to erosion and drain easily.
Minutes of Board of Commissioners' Work Session Wednesday, June 1, 2011
Page 1 of 6 Pages
Discussion occurred regarding the Oregon Watershed Enhancement Board,
which helps to classify Juniper encroachment. This has happened primarily
because of overgrazing and the suppression of natural fire. The area is subject
to some invasive species.
The students presented information on cruise methods to determine the types of
vegetation in the area. It is felt that the high density of young juniper will out-
compete other vegetation at some point.
Discussion took place about fire ecology, which is high to extreme. The lack of
fire has impacted the natural vegetation. Homeowner education is
recommended so people will know how to create defensible space and deal with
the high potential of wildfire.
Some road closures were recommended on the north, west and south sides to
protect sensitive areas.
A wildlife overview was then given. Historically, pronghorn and bats have
occupied the area, but not recently. Juniper uses the available groundwater,
which impacts other native species of vegetation, and that affects the wildlife.
There is no natural water source. Irrigation canals provide water part of the
time, and so do guzzlers that hold and distribute rainwater.
One of the students talked about the pathogens that impact Juniper forests.
An overview was provided regarding recreation on the property. Some human
activities have had a negative impact. Road closures would benefit the land and
wildlife and would improve the outdoor experience for users. Designated areas
are suggested for various activities.
Biomass opportunities were discussed, as were the pros and cons of trying to
use the vegetation for biomass. It is not likely to be viable for carbon credits
because there is just not enough of it available.
Five points were established for monitoring purposes. The recommended
treatment options are road closures; and potentially various levels of thinning
Juniper.
Minutes of Board of Commissioners' Work Session Wednesday, June 1, 2011
Page 2 of 6 Pages
Discussion occurred regarding the costs to maintain the property if uses are
restricted or roads are closed. Law enforcement would be a factor.
Commissioner Unger asked if the water problem is the permeability of the soil
due to its origin, or if it is because Junipers can use so much. The reply was
that Juniper will go a long way to get to water, so it uses what other vegetation
needs as well. Ponderosa pine does not do well there due to the lack of water,
competition for existing water and nutrients, and perhaps a change in weather
patterns. It does not appear that there has historically been a pine forest in that
area.
Dave Kanner asked if it is economically viable to use some of the Juniper for
biomass, in order to offset other costs. He was advised that economic viability
means breaking even or making a profit, and there is not enough potential for
that at this time.
Mr. Kanner asked if grasses would survive beyond the first year without help.
He was told that some native grasses could survive if they were not out-
competed by Juniper.
Discussion occurred regarding the options and the cost to reseed the area. It
was pointed out that if there is no reseeding done, the native grasses may never
come back. If biomass work is done or the land is disturbed in other ways,
reseeding is needed to preclude invasive species from taking over. A no-tilling
method is preferred.
The property is zoned for winter deer range, and there is some evidence of that
activity. However, there is a distinct absence of fine vegetation. At least 20%
of the soil is bare. If Juniper and bitterbrush was removed, some grasses might
do better. Fire could be used but the continuity of the shrubs and vegetation
would preclude its spread enough to be effective. There are some slash piles in
the area now, but they have been left for wildlife habitat. Fire may have not
played a significant role in the past. However, there is some growth on private
lands nearby and fire could spread to or from there.
It was pointed out that most of the neighbors like the wildlife environment as it
is now.
Minutes of Board of Commissioners' Work Session Wednesday, June 1, 2011
Page 3 of 6 Pages
2. Discussion of Deschutes National Forest Urban Growth Boundary
Expansion Application.
Nick Lelack said this application has to do with the Deschutes National Forest
building its new headquarters in an urban reserve area. The comprehensive
plan shows the land as an urban reserve area, and the zoning is urban area
reserve. This would need to change to public facilities. This is previously part
of the Pine Nursery property.
Work on this process has taken a couple of years. A joint management
agreement with the City of Bend was adopted in 1998 relating to urban reserve
areas outside the UGB. The County maintains land use control. Key issues
have been transportation and effluent disposal. Transportation has been fully
resolved through an agreement with the City and the National Forest. This also
addresses in part the County's transportation issues on Deschutes Market Road.
Effluent disposal is another issue. The property cannot be hooked up to the
current City system unless it is part of the City. Commissioner Unger said there
is no tax benefit to annexing it. Laurie Craghead said that the Board has no
option other than allowing annexation unless the County initiates a review
before Monday. Mr. Lelack said the U.S. Forest Service is fine with the
annexation, as their end goal is to hook into the City system as soon as possible.
There were hearings to address these issues and others, and all have been
resolved. All requests were approved. The Board can initiate review and call it
up for a hearing or, per Code, let the Hearings Officer's decision stand.
Ordinances to affirm this action would be presented to the Board. No testimony
from citizens has been offered.
The City of Bend will consider the first reading tonight of the annexation
documents. Staff requests the Board adopt the Ordinances on June 22 by
emergency. The effective date would be on July 15 through the City. The
building could get a certificate of occupancy and things would open as
scheduled. If it is not adopted by emergency, it would be several months before
this could happen.
Minutes of Board of Commissioners' Work Session Wednesday, June 1, 2011
Page 4 of 6 Pages
Commissioner Unger is supportive of this path. Commissioner DeBone asked
if anything further has been developed by the Park & Rec District on their
property. He was advised that they own the property separately and are not
involved in this particular issue. Commissioners Unger and Debone said staff
should proceed.
3. Update of Commissioners' Meetings and Schedules.
Commissioner Unger asked about attendance at the LIGI luncheon, as he has a
conflicting event. Dave Kanner said in the past the Commissioners have not
regularly attended these events.
Commissioner Unger plans to attend the Children & Families' Commission
meeting tomorrow.
Mr. Kanner said that this group is seeking County support and the
Commissioners need to be cautious about making any commitments. It is
possible the legislature may dissolve the Commission on Children & Families
as now structured at the State level, and programs and funding would be
disbursed by the Governor's new Early Learning Council.
He added that the County could continue the CFC locally, but that takes
funding. He would rather see grant-funded programs continue through Health
Services or Juvenile Community Justice instead, for as long as the programs are
viable. He feels this is a more cost-effective approach.
4. Other Items.
None were discussed.
The meeting ended at 4:20 p.m.
Minutes of Board of Commissioners' Work Session Wednesday, June 1, 2011
Page 5 of 6 Pages
DATED this Day of qt~,4-~_ 2011 for the
Deschutes County Board of Commissioner.
Tammy Baney, Chair
Anthony DeBone, Vice hair
ATTEST: A- -2
Alan Unger, Commissioner
Recording Secretary
Minutes of Board of Commissioners' Work Session Wednesday, June 1, 2011
Page 6 of 6 Pages
Deschutes County Board of Commissioners
1300 NW Wall St., Suite 200, Bend, OR 97701-1960
(541) 388-6570 - Fax (541) 385-3202 - www.deschutes.ors?
WORK SESSION AGENDA
DESCHUTES COUNTY BOARD OF COMMISSIONERS
WEDNESDAY, JUNE 19 2011
1. Capstone Presentation - Joe Studer & COCC Students
2. Discussion of Deschutes National Forest Urban Growth Boundary Expansion
Application
3. Update of Commissioners' Meetings and Schedules
4. Other Items
PLEASE NOTE: At any time during this meeting, an executive session could be called to address issues relating to ORS 192.660(2) (e), real
property negotiations; ORS 192.660(2) (h), litigation; ORS 192.660(2)(d), labor negotiations; or ORS 192.660(2) (b), personnel issues.
Meeting dates, times and discussion items are subject to change. All meetings are conducted in the Board of Commissioners' meeting rooms at
1300 NW Wall St., Bend, unless otherwise indicated. Ifyou have questions regarding a meeting, please call 388-6572.
Deschutes County meeting locations are wheelchair accessible.
Deschutes County provides reasonable accommodations for persons with disabilities.
For deaf, hearing impaired or speech disabled, dial 7-1-1 to access the state transfer relay service for TTY.
Please call (541) 388-6571 regarding alternative formats or for further information.
It JO t
~ t
4
2
rt1
~
,
n-
N
~
3121
Q)
U5
N
%A
Its-
Z
Z
-0
V
`mil
~
4+
~
4
1
~
V
V
vJ
~
Vt
r!►
-23
Q
Y
41
C
J
cy"
S
to
y
Y
Q
~
C
N
v
O
o
s
o
C
~
OJ
~
H
0
~
.
7
^
V
M
So
d
M
m
~
M
f®,
~
Q
V-i
N
H
9
^r
t~`~
f
~
~
3
0
0
V
d
c>
v
I
O
N
cn
C
L
o
a
~vT ES C
G
p 2{
Deschutes County Board of Commissioners
1300 NW Wall St., Suite 200, Bend, OR 97701-1960
(541) 388-6570 - Fax (541) 385-3202 - www.deschutes.org
AGENDA REQUEST & STAFF REPORT
For Board WORK SESSION of June 1, 2011
Please see directions for completing this document on the next page.
DATE: May 18, 2011
FROM: Joe Studer Forestry 322-7117
TITLE OF AGENDA ITEM:
Consideration of the BOCC of the Land Management Plan for the County owned lands along Rickard
Road, east of Bend.
PUBLIC HEARING ON THIS DATE? No.
BACKGROUND AND POLICY IMPLICATIONS:
Deschutes County and Central Oregon Community College have an existing Memorandum of
Understanding which provides the learning opportunity for students to untilize County owned lands to
both apply and practice forestry and natural resources skills.
In the past five years, students from the Capstone Class have development land management plans for
larger contiguous sections of land which have provided valuable alternatives and actions for future land
management decisions and management of those County owned lands.
For 2011, the students have prepared a land management plan for approximately 720 acres of County
owned lands located approximately five miles east of Bend and north of Rickard Road. The students
will present the plan, along with recommendations and alternatives to the Board and other departments
within the County.
FISCAL IMPLICATIONS:
None.
RECOMMENDATION & ACTION REOUESTED:
Consider the proposal and after questions, recommend approval of the plan.
ATTENDANCE: The 2011 Capstone Class from COCC, advisors, college officials and other
department personnel from Deschutes County.
DISTRIBUTION OF DOCUMENTS:
Copies will be distributed by the Capstone Class at the conclusion of the presentation.
CLI You are invited to Attend
The 2011 Forestry Program
Capstone Class Presentation
Rickard Road
Management Plan
Wednesday, June 1
1:00-2:00 PM
Deschutes County Administrative Offices
1300 NW Wall Street
Bend
RSVP to Theo
tgiannioses@cocc.edu
Faculty Contact: Mick Sears
mgsears@cocc.edu
Student Contact:
forestrycapstone2011Ca gmail.com
2011 Capstone Class
Rickard Road Property
Management Plan
`1, K t
M1 .
1( t yr V
t
~:yF~xyA yr a.r~ 4
At'Chad Elwess, Ryan Jenkins, Luke Lassell,
Shawn Maurer, Chris Monda, Justin Osborn,
Tom Oswald, Sean Schroeder,
- & Brandon Zgraggen
Forest Resources Technology
Central Oregon Community College
1
Table of Contents
1.
OBJECTIVE
3
II.
SITE DESCRIPTION
3
III.
SITE HISTORY AND CURRENT CONDITION
5
IV.
SOIL TYPES AND CONCERNS
5
V.
STAND INVENTORY
6
VI.
UNDERSTORY VEGETATION
7
VII.
WILDFIRE AND WILDLAND URBAN INTERFACE
7
VIII.
WILDLIFE
8
IX.
WATER RESOURCES
9
X.
RECREATION MANAGEMENT
10
X1.
NOXIOUS WEEDS
11
XII.
ENTOMOLOGY AND PATHOLOGY
11
XIII.
CARBON CREDITS
12
XIV.
BIOMASS
12
XV.
MONITORING
13
XVI.
TREATMENT OPTIONS
14
XVII.
RECOMMENDATION
18
XVIII.
CRUISE AND DATA COLLECTION. PROTOCOL
19
XIX.
APPENDIX
21
XX.
REFERENCES
31
XXI.
CONTACTS
32
2
I. Objective:
The objective for the 2011 Forest Resource Capstone class was to
develop a land use and management plan for the 715.9 acre Rickard
Road property. The property is owned by Deschutes County and is
managed as public land. After our research and data collections were
complete, the following land use plan was developed.
II. Site Description:
The Rickard Road property is located approximately four miles
East of Bend, Oregon near the corner of Highway 20 and Rickard Road.
The property is divided into four tax lots, which are zoned as EFUAL
(exclusive farm use- alfalfa subzone). The tax lot numbers, areas, and
public land survey description are as follows (Zoning information:
Deschutes County code):
Tax Lot Public Land Survey Description: Area (acres 1:
1813000004503 N. 1/2, SE.1/4, Sec. 15, T. 18e R. 13s Sec. 15 WBM 77.68
1813000004500 NE.1/4, Sec. 15 160.68
1813000004600 W.1/2, Sec. 15 316.33
1813100001100 S.1/2, SW. 1/4; NE.1/4, SW. 1/4; SW. 1/4, SE.1/4, Sec. 10 160.58
Under Chapter 11.04.020 the Rickard Road property is classified
as "Vacant county land". According to Deschutes County Code (Chapter
11.04) the following land use regulations have been put into effect for
areas classified as public land (Teresa Rozic, Des. Co. Land Spec., pers.
comm.) The intent of these regulations is to protect public property from
degradation and vandalism.
1. Public use of County owned property will be limited to day use
only.
2. No person shall damage, litter, burn, remove material, or cause
any other site damage to County owned property without obtaining
written permission.
3. Motor vehicle travel shall be limited to existing parking lots and
roads.
4. No person or group shall exclude any other member of the public
from County,owned property.
5. Any County owned property may be posted closed by the County
Property and Real Estate Manager.
6. All other uses of County owned property are permitted outright.
'
The property adjoins to private property on the North, West, and
South sides and to BLM managed land on the East side. There are a total
of 11.9 miles of primitive roads on the property as well as several access
points to enter the property, which include both foot trails and two-track
roads. The primary access points to the property are located on the south
L
end of property off Rickard Road; there is also one access point off of
Ward Road which runs through the property and joins Highway 20.
The site is characterized by rolling terrain with rocky outcroppings.
The plant community is dominated by western juniper (Juniperus
occidentalis); there was a small amount of ponderosa pine (Pinus
ponderosa) regeneration observed but we do not believe that it can
compete with the western juniper on this site. The shrub component is
'
composed mainly of big sagebrush (Artemisia tridentata) with some
integration of antelope bitterbrush (Purshia tridentata). Native grasses
such as Idaho fescue (Festuca idahoensis), squirreltail (Elymus
elymoides), crested wheatgrass (Agropyrum cristatum), and bluebunch
'
wheatgrass (Agropyrum spicatum) were also observed growing throughout
the site.
:t HS
Iy AT
Mx«i~~.n
_ RKktsx7
-r:
t`
,Ritlru~raq
a
p~
_'<et
SC4..
4
d
III. Site History & Current Condition:
Western juniper is a tree species which is native to Central Oregon.
It has grown on the site for over three hundred years; however, historical
densities do not match current densities. Historically, juniper stands in
the area have formed what are now known as juniper savanna (Gedney,
1999). Due to fire suppression and a lack of stand management, the
stand has increased in density to a juniper forest. A juniper stand on a
regular fire return interval would consist of old growth trees in a mosaic
pattern and a small amount of regeneration (Tom Andrade, ODF, pers.
comm.).
This site has historically been used by the public as a place for
recreation (Rozic, pers. comm.). Known activities on the site include
horseback riding, hiking, hunting, shooting, wildlife viewing, and a small
amount of off-road vehicle use. There has been a small amount of
I
1
i
u
garbage dumping observed throughout the site, but degradation to the
site from these types of activities is minimal and can be mitigated with a
site clean-up and the closure of roads.
The road density on the site is high- approximately 10.8 miles of
road per square mile. Circumstances such as these can have an adverse
affect on wildlife populations (Larry Pacenka, O.D.F.W., pers. comm.),
such as promotion of noxious weed growth, and can lead to excessive soil
compaction. It is recommended that the density of roads on the site be
reduced to two miles of road per square mile of area (Pacenka, pers.
comm.). This recommendation would involve closing approximately ten
miles of roads on the site. However, this will help to reduce dumping and
further site degradation. It will also promote wildlife and overall stand
health.
IV. Soil Types & Concerns:
The following information was collected from a publication survey
conducted and authorized by the United States Department of
Agriculture (USDA) and the National Research Conservation Service
(NRCS). According to the survey, the Rickard Road property is composed
of three soil types: Gosney-rock with Deskamp outcroppings on a slope of
0-5 percent, Gosney-rock with Deskamp outcroppings on a slope of 5-15
percent, and Deskamp loamy sand. (Refer to soils map on page 19.)
Approximately 78 percent or 558 acres of the property consists of
Gosney-rock soil with Deskamp outcroppings on a slope of 0-5 percent.
' This soil was formed from ash and is common in this region. The typical
soil profile is composed of two sub-surface horizons: the top 15
centimeters consists of course sand integrated with pieces of gravel,
while the distance between 15-30 centimeters is formed by pale brown
loamy sand. The pH level in this soil ranges from 6.8 to 7.3. Native plants
found in this soil type are western juniper, bitterbrush, big sage, Idaho
fescue, and bluebunch wheatgrass. This soil type is known for having a
rapid permeability, meaning it is quickly drained of water. This soil type
' is also highly susceptible to wind erosion and to compaction.
Low soil fertility and cold, dry weather limit the potential for
agricultural crops. Due to the susceptibility for compaction, it is
recommended that large livestock be kept off this soil type. If the
harvesting of timber takes place on the site, the use of skid trails is
highly recommended. It is also recommended that native grass seed be
scattered throughout the site to further prevent wind erosion to the soil.
Approximately 15 percent or 109 acres of the property is composed
of Gosney-rock with Deskamp outcroppings on slopes of 5-15 percent
slope. This soil type is located on the north side of the property and has
the same characteristics and properties as the above soil type.
'
Approximately 7 percent or 50 acres of the property consists of
Deskamp loamy sand. This soil is also formed from ash. It is brown in
color and tends to have a pH of 7.0, which is neutral. This soil has a
rapid permeability, but has a low susceptibility to compaction when used
for recreation sites such as camping areas.
V. Stand Inventory:
All trees sampled during our cruise of the property were western
juniper. According to our cruise data there is an average of 43 trees per
acre and 31 sapling or seedlings (trees less than 4 inches DBH) per acre
across the 715 acres. The basal area of these trees averages to be 58.7.
square ft. per acre with a 95% confidence interval of ± 1.6 square feet of
basal area. The volume per acre is estimated to be 483 cubic feet with a
total stand volume of 345,582 cubic ft. Under a 95% confidence interval
our volume prediction can potentially vary by ±50,793 cubic ft. over the
entire 715 acres.
' The oldest tree sampled in our cruise was 263 years old and the
average age of sampled trees was 166 years old. The average ten-year
growth increment of the stand is 0.31 inches. Currently, the Central
11
Oregon Community College (COCC) capstone class has not been able to
find any literature that discusses site class on western juniper, so site
class and index were not calculated for this site.
The COCC capstone class used characteristics such as lichen
growth, visible rot, conks, and wildlife nests to classify old growth trees
in the stand. It was found that the majority of the trees over 21 inches
DBH exhibited these features, so we used this size class to separated old
' growth trees from regeneration. (Refer to cruise calculations in
appendix.)
VI. Understory Vegetation:
' The shrub and ground cover on the site is composed of big
sagebrush, antelope bitterbrush, yellow rabbitbrush (Chrysothamnus
uiscidiflorus), and rubber rabbitbrush (Chrysothamnus nauseosus). Much
of the understory is composed of mature shrubs with at least 20 percent
of their mass comprised of dead material. These large shrub species
' occupy approximately 145 acres of the property, or 20 percent of the
total ground cover.
' Approximately 67 acres or nine percent of the property is occupied
by native grasses and forbs, including Idaho fescue, squirreltail,
bluebunch wheatgrass, and sand lily (Leucocrinum spp.). These are
' valuable forage for wildlife, as well as a desirable seed source for post-
activity reclamation of the site.
Due to the low amount of annual rainfall on the site,
approximately 20 percent of surface soil is unoccupied by vegetation.
With proper action taken to free-up available soil water, it is believed that
the percentage of desirable ground cover could be increased. (OWEB
Phase II Monitoring Report, 2007)
w
VII. Wildland Fire & Wildland Urban
Interface (W.U.I.) Recommendations:
The Rickard Road property falls under the 2006 Greater Bend
Community Wildfire Protection Plan. Due to the proximity of homes to
the site, an ODF assessment of risk was utilized to evaluate wildfire
concerns. Managing the area along Rickard Road and the areas adjoining
to private property should be a priority. (The following ratings and
7
n
11
conditions were collected from the 2006 Greater Bend Community
Wildfire Protection Plan.)
Ratings & Conditions of Interest:
• ODF Hazard Rating of 76 (extreme)
• ODF likelihood of fire occurring of 35 (high)
• The fire return interval for western juniper woodlands is every 25 -
35.
• This property is Fire Regime Group 2 with a fire frequency of 25-35
years
• This property is a condition class 2 (missed more than one fire
return interval)
• Western juniper woodland fire return interval for this site is
approximately every 31 years
Rickard Road Property Wildfire & W.U.I. Recommendations:
1 • Homeowner Education- to provide information to adjacent
landowners on the importance of defensible space (defensible space
checklist)
• Create and maintain a fire resistant buffer along Rickard Road, as
well as the North, West, and South boundaries of the property.
• Proposed thinning of western juniper
' • Materials should be piles to add cover for wildlife or hauled off the
site and used as biomass
I
VIII. Wildlife:
There have been several mammal and avian species observed on
the site which include mule deer (Odocoileus hemionus), elk (Ceruus
elaphus), deer mice (Peromyscus maniculatus) , bushy-tailed woodrats
(Neotoma cinerea), black-tailed jackrabbits (Lepus californicus), cottontail
rabbits (Syuilagus spp.), pinyon jays (Gymnorhinus cyanocepholus),
western bluebirds (Sialia mexicana), northern flickers (Colaptes auratus),
California quail (Callipepla californica), barn owls (Tyto alba), great-
horned owls (Bubo uirginianus), red-tailed hawks (Buteo jamaicensis),
ravens (Coruus corax), sage thrashers (Oreoscoptes montanus), and
migrating bald eagles (Haliaeetus leucocephalus). Historically the
pronghorn antelope (Antilocapra americana) and resident bat (Molossidae
and Vespertilionidae families) populations were found on the site (Bret
Michalski, COCC Biologist, pers.comm), but these species have not been
observed on the site.
1
l
"In most cases, juniper habitat supports greater populations of
wildlife than any other habitat type in Eastern Oregon. Approximately 83
avian species and 23 mammal species use juniper woodland habitat in
Oregon. The areas which receive the most attention from wildlife are old
decadent trees and rocky outcropping. Protection of these habitat
features is crucial to healthy wildlife populations" (Gedney, 1999).
The current state of the western juniper on the site provides
valuable aspects to many species of wildlife- but proper management can
promote improved wildlife capabilities. The increase in juniper density
has excluded the regeneration of grasses and forbs. "An old growth stand
of juniper provides the greatest value to wildlife; thinning is
recommended to decrease the density of young juniper. This will provide
space and water to encourage the growth of grasses and forbs" (Pacenka,
pers. comm. An increase in grasses and forbs would add forage for
wildlife and insects. Increase in insect populations would benefit many
small mammals, bats, and avian species on the site.
If the juniper in this stand is allowed to increase in density, the
benefits to wildlife will decrease. "A stand composed only of western
juniper has lost a tremendous amount of value to wildlife. As a stand of
juniper ages and increases in density, the juniper will successfully out-
compete native shrubs, grasses, and forbs through moisture extinction"
(Pacenka, pers. comm).
This habitat can be improved by implementing a thinning of the
younger juniper, which has been classified as a tree which is less than
21 inches in diameter. This will ultimately increase water availability and
free-up space for native grasses and forbs, which are essential as forage
for wildlife. It is recommended that a water impoundment device and
nest boxes be added to the site (Pacenka, pers. comm. Adding nest
boxes to the site will increase cover for resident and migrating avian
species. Since water is a limiting factor on the site, a water impoundment
device will increase water availability to all wildlife species.
IX. Water Resources:
The stand receives an average of 8 inches of precipitation per year
and nearly all of that moisture comes in the form of snow during the
winter months. The early to mid-successional western juniper component
takes up the majority of the surface area, as well as available surface
water on the property. Research has shown that as juniper ages, it
develops a fine root system in the upper 30 inches of the soil profile,
which can extend laterally as much as three times the height of the tree.
"Juniper trees can produce photosynthesis very early in the spring before
other plants begin to grow. On a warm April day an 18 inch juniper tree
can transpire 20 gallons of water per day; in mid-summer that same tree
can transpire up to 40 gallons of water per day. (1993, Bedell)
Currently there is no source of free water on the site. The closest
source of free water is an irrigation canal, which is located on an
adjacent property to the North and only flows for a portion of the year. It
is recommended that a water impoundment device (guzzler) be added to
the South end of the site; which would increase the water availability and
diversity of wildlife.
X. Recreation Management:
Currently, recreation use on the property consists of target
shooting, off-highway vehicle (OHV) use, horseback riding, hiking,
wildlife viewing, campfires, and woodcutting. Based on our observations,
' there are currently 2-5 persons at one time (PAOT) recreating on the
property. There are signs of illegal trash dumping, which are most
prevalent on the South end of the property, near Rickard Road.
Some of the current recreation activities that are occurring on the
property are having adverse affects on the land. Many unnecessary roads
have been created by recreational use. Disturbance along these roads
and trails allows for the encroachment of noxious weeds and high levels
of compaction. Presently, there are 11.9 miles of roads, and the
continuation of the fore-mentioned activities will exacerbate this
problem. Campsites and campfires are a concern due to the dry
conditions of the site and its close proximity to residential properties.
Campsites and dispersed camping are known to cause severe compaction
to this soil type. According to a soil survey performed and reported by the
USDA and NRCS, it is recommended that camping and picnic areas be
'
exempt from this site.
To reduce further degradation of the site it is also recommended
j
that recreation be limited to non-motorized vehicle types. Road closures
along Rickard Road will be beneficial to deter illegal dumping on the
South end of the property. A parking area on the South end of the
property could provide access for wildlife viewing and hiking use, as well
as a place to post signs to inform the public of legal uses and dangers. If
motorized use is allowed to continue on the site it is recommended that
existing roads and trails be posted with instructions to remain on roads
and trail systems only.
'
10
:
XI. Noxious Weeds
There is presence of both invasive and noxious weeds on site.
Limited populations of Russian thistle (Echinops exaltatus) and
cheatgrass (Bromus tectoruN exist along roadways throughout the
property. On the Northeast boundary, there are occasional patches of
woolly mullein (Verbascum thapsus). Total percentage of undesirable
plant species on site is less than 3 percent and not deemed to be a
1
particular threat to the populations of native grasses and forbs on site
(Dan Sherwin, Des. County, pers. comm). Where these species do exist,
individual spraying or burning is recommended, followed by a no-till
seeding of native species.
The key weed control strategy for this particular property would be
to limit introduction of seed sources to un-invaded areas. This includes
closing roads to OHV use, where mechanical treatment of western
juniper is implemented. It also requires that equipment is washed and
inspected before being transported onto the site.
XII. Entomology & Pathology:
There are several pathogens present at the Rickard Road site. The
pathogens present affect not only the volume of the stand, but also the
health and condition of the stand. Of these pathogens, juniper pocket
1
rot, brown cubical butt rot, juniper mistletoe, and juniper broom rust are
most prevalent.
Brown cubical butt rot (Phaeolus schweinitzio is a conk normally
found on the base of the tree bole or arising from the roots. The presence
of conks usually indicates severe decay in the bole and limbs. The fungus
t
extends up to 20 feet into the stem, making the heartwood yellow and
crumbly. The spores enter trees through wounds such as fire scars and
broken limbs, or by spreading between root systems. The fungus may
persist for years after a tree is dead, and continue to infect other trees
(Bega, 1978).
Juniper pocket rot (Fomes juniperinus) conks are normally found
on the bottom 4 feet of the tree's bole. It attacks heartwood and dead
sapwood creating stringy, hollow pockets, which compromise the
structural integrity of the trees, sometimes causing mortality. This
fungus also enters its hosts through wounds caused by limb breakage or
fire (Nevada Forestry Division, 2008).
11
1
1
~J
I
t
Juniper broom rust (Gymnosporangium nidus-avis) is normally
found in the branches and twigs of the trees, and is evident as rounded
clumps of foliage throughout the canopy. The fungus forms an orange-
brown telium, which causes limbs to swell, cracking the bark and killing
the cambium (Hagle, 2010).
Juniper mistletoe (Phoradendron juniperinum) is a parasitic,
flowering plant that is embedded in the limbs of infected trees. It
manifests as yellow to olive green globe-like clusters of foliage and may
have pink to whitish berries present. It robs the host of water and
nutrients, causing foliage to die off, but rarely killing the tree. The spores
are then dispersed by wind.
The fungi mentioned are best managed by avoiding injury to the
trees or by removing infected individual trees. The only treatment option
for mistletoe is to either prune the infected trees or remove them (Hagle,
2010).
XIII. Carbon Credits:
Carbon credits have been increasing in quantity among companies
with high carbon emissions. These companies are buying or leasing land
with trees and other plant materials which aid in carbon storage to offset
their emissions. One carbon credit is classified as one ton of stored
carbon. The price of carbon credits fluctuates with demand, but has
averaged $3.26 per ton in 2010 (Chicago Climate Exchange).
Although there is potential for carbon credits, the majority of the
market relates to stand types composed largely of commercial tree
species. There are also incentives in urban areas where trees create
shade to reduce the amount of energy needed to cool buildings. Neither
of these stipulations applies to the property.
1 XIV. Biomass:
r
Juniper is not a traditional biomass-producing tree; however new
technology and need for juniper eradication is pushing the industry in
this direction. "Currently Northern California is ahead of the juniper
biomass curve. According to studies there are several issues surrounding
potential juniper biomass extraction in Central Oregon (Steve Lawn, T2
12
Inc., pers.comm)." For example, juniper bark is very hairy and causes
chipped biomass to be stringy; this becomes an issue when applied to
the biomass extraction of plants because they are used to dry
dimensional chips. Currently there are no biomass facilities in operation
on the East side of the Cascades resulting in high transportation costs
(loaded biomass trucks must travel to Western Oregon). With the
completion of the planned biomass facility on the Warm Springs Indian
Reservation, the price of transportation would be reduced dramatically
and more juniper biomass operations may be feasible.
Due to habitat restoration and fire suppression goals, the potential
for biomass on this site is large. However, based on volume estimations
for the stand, the removal of biomass to generate a profit would not be
achievable. In order to make a biomass project feasible, government
incentives for enhancing wildlife, soils, water, plant community, and
wildfire protection must help pay for the biomass removal. The stand
varies widely in density across the entire 715 acres. A representative for
T2 Inc. (biomass company based out of Sweet Home Oregon), suggested
breaking the property into units where the biomass tonnage would be
greatest in yield (Steve Lawn, pers. comm). Once separated, these units
may be thinned according to prescription and trees may be chipped on
site either in single entry or multiple entries over a few years.
The total volume of woody biomass on the property is
approximately 14,124 cubic yards or 94 truckloads. Typically T2 Inc. will
accept jobs when they estimate there will be biomass yield exceeding a
minimum of 100-150 truckloads (each truckload approximately equal to
25-30 tons bone dry weight). If biomass is going to be used for a source
of income in association with wildlife enhancement and fuel reduction
thinning, highly dense portions of the property must be the focus of
treatment. Fire break areas near the neighboring communities can
potentially be heavily thinned producing large volumes of biomass in
these specific units. Other highly dense areas can be heavily thinned as
well, leaving approximately 15 square feet of basal area of old growth
trees in the stand which would remain mainly on rock outcroppings.
XV. Monitoring:
On May 10, 2011, five landscape photo points were established on
the Rickard Road property. The location of each point and lens directions
have been recorded in the cruise and data collections protocol for future
reference. Four photo points were randomly established near the corners
of the property and one was placed in the center of the property. The
13
t
main objective of the photo points is to monitor the stand after
treatment.
The photo points can be monitored by students in the COCC
forestry program on a five year basis. These photo points will be crucial
to determining the visual effectiveness of any treatments implemented on
the property. These points will also indicate if further treatments to the
stand are needed.
XVI. Treatment options:
The 2011 COCC Capstone Class recommends that one of the
following treatment options be implemented on the Rickard Road
property. The overall goals of the following options are to enhance wildlife
habitat, restore the stand health to its full potential, and increase the
recreational values of the property.
t Treatment costs are estimates from Joe Stutler, Deschutes County
Forester. The costs associated with each option are estimates; costs of
treatments depend on the current market values. The thinning options
are estimates for a contract thinning crew to implement the treatment
and do not include profits made from a biomass treatment of the
property. Treatment costs can be offset if a biomass thinning were
implemented on the property.
Option A:
A heavy thinning, seeding of native grasses, full road closure,
construction of a parking area with a sign kiosk, trail head, and the
construction of a wildlife guzzler.
This option would have a goal of reducing the juniper cover on the
site to 5 percent stocking, with the focus on the removal of younger trees
(trees less than 21 inches diameter breast height or DBH) and the
retention of old growth trees. A biomass thinning of the area is
recommended to help offset the cost of the following treatment. Those
trees that exist on rock outcrops can be left as "islands" which is
historically how juniper grew on the site. This would keep old decadent
trees on the site for wildlife habitat, as well as freeing-up water resources
for grasses and forbs. The seeding of native grasses can be implemented
to accelerate the regeneration of natural vegetation. This will help
mitigate the effects of disturbance caused by the harvesting process, and
14
s
~J
1
t
reduce the chance of invasive species from taking control. With the
exception of two gates for fire control, full road closure into the site and
maintenance access would eliminate further degradation of the site from
traffic, illegal dumping, and ATV/OHV use (Refer to map of
recommended road closures). This would also allow for the site to return
to the recommended road allowance of 1.5 miles of road per square mile
of land. Construction of a primitive parking area would provide a location
for the public to enter the site. This area would act as a trail head for
non-motorized use and a location for a sign kiosk so that the county
could post rules for use of the site. Constructing a wildlife guzzler on the
site would improve the habitat value of the land for wildlife, and provide
the public with more opportunities to encounter birds and mammals
during visits.
Implementation of this option would be the most costly option; however
there are several opportunities to offset the costs with the use of grants
from groups which have interests in the reduction of fuels for fire
concerns, the reduction of juniper encroachment, and the improvement
of wildlife habitat. This option is estimated to cost $763,000- $939,000;
the cost breakdown is:
• Thinning:
Hand piling: $330,000- 579,000 (or)
Lop and scatter: $57,000- $100,000
• Seeding of native grasses:
Seed: $71,500- $214,500
Spreading: $286,000
• Closure of road entrances:
Rock and tank traps: $4,000
• Parking area: $1, 000
Fire gates:
Gates, fence, and installation: $7,800
t
L~l
• Guzzler: $8,500
15
r
1
• Signs: $1,200
Option B:
A heavy thinning, full road closure, construction of a parking area
with a sign kiosk, trail head, and the construction of a wildlife guzzler.
This option would have the same stipulations and management
goals as option A. This option would have a goal of reducing the juniper
cover on the site to 5 percent stocking, with the focus on the removal of
younger trees (trees less than 21 inches diameter breast height or DBH)
and the retention of old growth trees. A biomass thinning of the area is
recommended to help offset the cost of the following treatment. Those
trees that exist on rock outcrops can be left as "islands" which is
historically how juniper grew on the site. This would keep old decadent
trees on the site for wildlife habitat, as well as freeing-up water resources
for grasses and forbs. There is no seeding involved in this treatment
option, which will help to lower the cost of treatment. This treatment is
estimated to cost $262,500- $500,000. The cost breakdown is identical
to the previous option minus the cost of seeding.
Option C:
Thinning in areas of high density, seeding of native grasses,
creating a fire buffer near property boundaries that adjoin with
residential properties, block access from Rickard Road, signs posted at
1 access points, reduction of roads, and the construction of a wildlife
guzzler.
t
t
1
This option would focus on the thinning of trees only in areas of
high density to produce a higher biomass yield to cover the cost of the
treatment, as well as the creation of a fire buffer. With the exception of a
fire maintenance gate, blocking all access from Rickard Road with
materials from the site (piles of large rock that have been dumped and
ripping of road entrances) would be recommended (Refer to map of
recommended road closures). Signs would be posted at access points
instructing users to stay on main roads, and the closure of
approximately 50 percent of current roads with natural barriers (rocks)
would be implemented. Introducing a wildlife guzzler to the site would
improve the carrying capacity of the land for wildlife, and provide the
public with more opportunities to encounter birds and mammals during
visits.
16
Implementation of this option would be much less costly than
option A. The majority of the expenses would be in labor for road
closures. As in option A, there are opportunities to offset costs with the
use of grants from groups that have interests in the reduction of fuels for
fire concerns, the reduction of juniper encroachment, and the
improvement of wildlife habitat, as well as the sale of wood for biomass
uses. This option is estimated to cost $405,000- $560,000; the cost
breakdown is:
• Thinning and fire break:
Hand piling: $30,000- $45,000
Lop and scatter: $17,000- $20,000
• Seeding of native grasses:
Seed: $71,500- $214,500
Spreading: $286,000
• Closure of road entrances:
Rock and tank traps: $4,000
• Signs: $1,200
• Guzzler: $8,500
Option D:
Create a fire buffer on sides that adjoin with residential properties,
issue firewood permits to select commercial firewood companies or
charitable groups, post signs, and install a wildlife guzzler.
This option would include a fire buffer to reduce fire hazard. The
sale of special firewood permits to commercial or charitable agencies that
could demonstrate a basic understanding of old growth management
goals would be recommended. Such agencies are known to practice
responsible harvest techniques at lower costs. Posting of signs at
t+' entrance points and along roads to instruct users to keep on roads would
be mandatory. The introduction of a wildlife guzzler to the site would
improve the wildlife habitat. It would also provide the public with more
opportunities to encounter birds and mammals during visits.
1
17
1
1
This treatment is estimated to cost $20,000- $35,000; the cost
breakdown is:
• Fire buffer:
Hand piling: $15,000- $26,000
Lop and scatter: $2,600- $4,600
• Signs: $1,800
• Guzzler: $8,500
Option E:
Leave it be.
1
t
LI
F-I
i I
Allow the property to sit until the economy improves or until
biomass facilities are available locally. At this time any one of the
previous options could be implemented. This would also allow the stand
to increase in density, which would yield a higher biomass volume. This
option would cost nothing at this time. Future costs are dependant on
the market at that time.
XVII. Recommendation:
The 2011 COCC Capstone Class recommends that the Rickard
Road property be treated with option A. This option will be costly but
with the help of grants and a biomass thinning the treatment could pay
for itself. This option will be the most beneficial to improving overall
stand health and wildlife habitat, which should be the ultimate goal for
this property. This option would also restore the stand to a natural fire
return interval. This property could become a model to encourage
residence in area to reduce hazardous fuels and restore their properties
to an ecologically sound state.
18
XVIII. Cruise & Data Collection Protocol:
A preliminary sample of 8 fixed, 1/5 acre plots yielded the result of
a variance of 68.5. At this point we were able to determine that we
needed to increase our sample size in order to get reliable numbers.
A 'A acre plot size was chosen with a goal of at least 60 plots to be
sampled across the 715 acre property. A map of the perimeter and roads
' was produced using data collected with a Trimble Geo XM GPS, and
Terrasync was used to convert the data. Arcmap and Pathfinder
office were then used to lay a grid of 66 plots, which were evenly spaced
across the landscape. Each plot was assigned a coordinate (1984 NADS
Oregon State Plane South) to be located by GPS during the cruise. From
the 66 plots which were 'A acre in size, a 2.2 percent cruise intensity was
calculated. From the plot centers, nested plots of 1/20 acre were
established in order to calculate the ground cover of the stand. Visual
estimates of each type of ground cover were recorded.
Cruise cards were produced prior to the cruise and consisted of lot
number, GPS coordinates, tree number, DBH, height, a tally space for
trees less than 4 inches DBH, and space for the percentage of each type
of ground cover (sagebrush, bitterbrush, rabbitbrush, grasses, forbs, and
' other). A space was also provided for extra comments and observations.
Plot center was found with Trimble GPS units. From plot center, a
radius of 58.9 feet was determined with a 100 foot cloth tape. All live
junipers in the plot were measured; snags were counted separately.
Diameter was taken at breast height (4.5 feet) with a Biltmore stick, and
rounded to the nearest two inch class. Tree heights were measured with
a relaskop then rounded to the nearest foot. Regeneration under 4 inch
DBH was tallied. Visual estimates of each type of ground cover were
observed and recorded
.
In order to determine the age, rot characteristics, and annual
growth increments of the stand, 12 western juniper trees between the
diameters of 9 inches and 28 inches were destructively sampled. Cookies
were then taken and aged.
Microsoft Excel was the primary source of data computation. The
arithmetic average, the standard deviation, the variance, and the
confidence interval were calculated using Microsoft Excel functions. The
stand volume was calculated using Microsoft Excel and a volume
equation which was taken from the U.S. Forest Service.
19
h
d
h
d
h
Five p
oto points were ran
t
roug
omly place
out the stand.
They are marked with a rebar stake and fla
gged with pink ribbon. The
GPS locations and camera directions (NAD
1984) are:
Point Point Location:
Lens Direction:
'
1. N. 44.01156 W. 121.16028
True North
2. N. 44.02792 W. 121.15775
True North
3
N
44
01750
h
.
.
.
W. 121.15645
True Nort
4. N. 44.02276 W. 121.14936
True North
5. N 44.01413 W. 121.14599
True North
(Refer to photos in appendix)
1
I I
7-1
L
20
XIX. Appendix:
The Rickard Road Property: Soil Survey of Upper Deschutes River
Area
Key:
Soil Type:
59c
58c
36a
Soil Name:
Gosney-rock w/Deskamp outcropping; 0-5% slopes
Gosney-rock w/Deskamp outcropping; 5-15% slopes
Deskamp loamy sand
Acres:
558
107
50
21
Photo Point #1
Photo Point #2:
fc~
r:
~d r
AM
w
M 1-,9 , ,1 ~4' . -,11
22
F.
Photo Point #3°
a
i
Photo Point #4°
sl:
ro 4
23
Photo Point #5°
24
Cruise Calculations:
Data Sheet
Cruise Area
Total Acreage 715
Total cruised acres 16
1/4 acre plots (58.9')
#of plots 64
Intensity % 2.24
Shrubs Average %/Acre
Sagebrush 16.4
Bitterbrush 2.1
Rabbitbrush 1.8
Grasses and Forbes 9.3
Noxious Weeds 2.6
Ground Cover/Acre 32.2
Total Acres Covered 230.2
Volume
Mean 133.3 Vol./Ac. 483 cu.ft. 18 cu.yd.
Median 121.7 Total Volume 345,582 cu.ft. 12,799 cu.yd.
Mode 103.8 95%CI/Acre ± 71 cu.ft.
Min 7.0 95%CI Whole area ± 50,793 cu.ft.
Max 339.0 BA/Acre 58.07 sq.ft.95% CI ± 1.6
Range 332.0 Total BA 41,520 sq.ft.
SEM (S) 8.88 TPA 43 95% Cl ± 6
STDEV (s) 71.04
Variance 5046.54
CV 53.28
25
Stand and Stock Table
Size Class
Volume/Acre (Cubic Feet) Total Volume (Cubic Feet)
Stems/Acre
Total Stems
4
1.97 1410
6.50
4648
6
12.10 8651
5.69
4067
8
19.42 13888
5.25
3754
10
27.94 19977
5.00
3575
12
31.45 22487
3.81
2726
14
30.98 22147
2.69
1922
16
44.67 31941
2.88
2056
18
48.93 34983
2.81
2011
20
38.47 27505
1.81
1296
22
53.33 38134
2.06
1475
24
33.62 24040
1.13
804
26
18.78 13430
0.56
402
28
18.48 13213
0.50
358
30
22.15 15837
0.56
402
32
15.52 11096
0.31
223
34
23.76 16987
0.50
358
36
12.03 8603
0.33
238
38
2.55 1825
0.06
45
40
6.71 4799
0.13
89
42
0.00 0
0.00
0
44
9.51 6799
0.13
89
46
5.48 3919
0.06
45
48
5.47 3912
0.06
45
Total
483 345582
43
30626
26
Sample of "Old Growth" Characteristics
Characteristics Present
Tree # DBH
# Characteris DF
RT L
N
C/R
1
18
3
1
1
1
2
28
3
1
1
1
3
38
4
1
1
1
1
4
40
3
1
1
1
5
52
3
1
1
1
6
42
4
1
1
1
1
7
24
4
1
1
1
1
8
20
3
1
1
1
9
40
3
1
1
1
10
38
3
1
1
1
11
28
3
1
1
1
12
34
3
1
1
1
13
28
3
1
1
1
14
38
4
1
1
1
1
15
40
4
1
1
1
1
16
30
3
1
1
1
17
28
3
1
1
1
18
24
3
1
1
1
19
26
4
1
1
1
1
20
42
3
1
1
1
21
30
4
1
1
1
1
22
36
4
1
1
1
1
23
40
4
1
1
1
1
24
28
3
1
1
1
25
40
3
1
1
1
32
30
3
1
1
1
1
1
33
22
3
1
1
1
1
34
42
5
1
1
1
1
35
21
4
1
1
1
1
36
26
5
1
1
1
37
29
3
1
1
1
1
1
38
32
3
1
1
1
39
31
3
1
1
1
40
32
3
1
1
1
1
1
41
28
4
1
1
1
1
42
23
3
1
1
1
1
1
43
25
3
1
1
1
44
25
4
1
1
1
45
16
4
1
1
1
46
16
3
1
1
1
47
38
5
1
1
1
1
48
25
5
1
1
1
49
25
4
1
1
1
50
15
4
1
1
1
1
DF: Deeply Furrowed B
ark;
19
Mean DBH
26.4
RT: Rounded Top:
16
Median DBH
25
L: Lichen:
16
Most Occurring DBH
25
N: Wildlife Nest:
16
Max DBH
42
C/R: Conk/Pocket Rot:
15
Min DBH
15
27
Destructive Sampling Data
Sampled Tree DBH/Age Data
Tree #
Coordinates:
DBH:
1: Al
N44.02671 W121.16130
6.2
6: E2
N44.01347 W 121.14402
7
2: A2
N44.02671 W121.16130
12.2
7: E3
N44.01321 W121.14415
13
3: A3
N44.02665 W121.16123
18.5
11: E7
N44.02665 W121.16124
18.5
8: E4
N44.02572 W 121.16155
22
10: E6
N44.02545 W.121.15478
26
9: E5
N44.01532 W121.14632
28
4: A5
N44.02376 W 121.16212
28.5
5: El
N44.01232 W121.14622
29
Average:
18.9909091
`All Age
Measurements taken at DBH or 4.5' above ground.
Height:
Age: Volume Lost to Rot
Growth over last 10 years
23
64 N/A
19.5
31
56 N/A
17.3
30
82 N/A
23.5
26
82 15
18
31
168 20
12
30
217 25
12
26
223 35
13
19
171 15
14.2
20
252 5
13
41
247 40
14
31
263 2
14
28
165.909091 19.625
15.5
28
I Map of Current Site & i Road Conditions:
29
I Ma of Recommend •
Map ed Road Closures.
r.
30
'I
u
XX. References:
ences.
Carbon Credit Values:
Chicago Climate Exchange, 4/15/2011
'
Carbon Credit Potential:
USFS Forest Inventory and Analysis. USDA Forest Service, 2002
Cruise Calculations:
Forest Measurements, 5th Edition. Avery & Burkhart 2002
Entomology. & Pathology:
Bega, Robert. (1978). Diseases of Pacific Coast Conifers. (Agriculture
Handbook No.521). USDA Forest Service.: (pg.176)
r
Si
l
i
W
1987
D
nc
a
r,
ayne. (
iseases of Trees and Shrubs.Cornell University Prees.:
(pg. 242-244)
A FIELD GUIDE TO DISEASES & INSECT PESTS OF NORTHERN & CENTRAL ROCKY
MOUNTAIN CONIFERS. USDA Forest Service. May 4, 2011,
'
www.fs.fed.us/rl r4/spf/fhp/field guuide/93jnprmt.html (pg.93)
(2008) Juniper Pocket Rot. Nevada State Forestry Division.
http: / /forestry.nv.j~ov/forestryresources/forest-heath/juniper-pocket-rot
Hagle, Susan. (2010). Forest Insect and Disease Leaflet 177.USDA Forest
r
Service.: (pgs. l -6)
Juniper Ecology & Wildlife Associates:
1999, Gedney, D.R., Azuma, D.L., Bolsinger, C.L., McKay, N., Western Juniper
in Eastern Oregon. General Tech. Report P.N.W- G.T.R- 464. Portland, OR: U.S.
Department of Agriculture, Forest Service, P.N.W.S
Soils & Recreational Impact Information:
Soil Survey of Upper Deschutes River Area including parts of Deschutes
Jefferson, and Klamath Counties. USDA Natural Resources Conservation
Service in cooperation with the USDA Forest Service, US Department of Interior
B.L.M, and Oregon Agriculture Experimental Station. 2002
I Volume Equations:
Chittester, J.M., MacLeon, C.D., Cubic- Foot Tree Volume Equations and Tables
for Western Juniper. Research Note P.N.W.- 420, U.S. Dept. of Agriculture,
Forest Service, P.N.W.
Water Resources:
1993.Western Juniper, Its Impacts and Management in Oregon Rangelands
Oregon State University Extension Services. EC-1417.
http: / /juniper.oregonstate.edu/EC 1417.pdf
1 31
1
Wildfire/ W.U.I:
2006. Greater Bend Community Wildfire Protection Plan
Wildfire Ratings:
2006. Greater Bend Community Wildfire Protection Plan
Wildlife:
2005. Oregon Dept. of Fish and Wildlife. Oregon Conservation Strategy. Oregon
Dept. of Fish and Wildlife, Salem. Oregon.
1998. Rick Miller, Wendy Waichler, and Paul Doescher,
Old Growth Western Juniper Woodlands.
Zoning Information:
htt-p://www.lava5deschutes.org
Deschutes County Code, Chapter 11.04
http://www.co.deschutes.or.us/dccode/`index.html
1 XXI. Contacts:
Biomass: Steve Lawn, T2 Incorporated, Biomass Specialist, 5/5/2011
Cruise Calculations: Ron Boldenow, Central Oregon Community College,
Forestry
Juniper Ecology: Bret Michalski, Central Oregon Community College, Wildlife
Biologist & Forestry
Juniper Ecology: Michael Fisher, Central Oregon Community College, Forestry
& Juniper Ecologist
Noxious Weeds: Dan Sherwin, Deschutes County Roads Dept., Weeds
Specialist, 4/12/2011
Property Value & County Codes: Teresa Rozic, Descutes County Land
Specialist, 4/10/2011
Recreation: Timm McChesney, U.S. Forest Service, Combined O.H.V. Trail
Tech., 4/6/2011
Treatment Costs: Joe Stutler, Deschutes County Forester
Wildfire/ W.U.I: Tom Andrade, ODF, Wildfire Specialist, 4/20/2011
Wildlife: Bret Michalski, Central Oregon Community College, Wildlife Biologist
& Forestry
Larry Pacenka, Oregon Dept. of Fish & Wildlife, Wildlife Biologist, 5/5/2011
32
G
n
I-A Community Development Department
Planning Division Building Safety Division Environmental Soils Division
117 NW Lafayette Avenue Bend Oregon 97701-1925
(541)388-6575 FAX(541)385-1764
http://www.co.deschutes.or.us/cdd/
MEMORANDUM
To:
From
Board of County Commissioners
Nick Lelack, AICP, Planning Director
MTG. Date: June 1, 2011
Re: Work Session: Deschutes National Forest (DNF) Urban Growth Boundary (UGB)
Amendment, Comprehensive Plan Map Amendment, Zoning Map Amendment
(Ordinances 2011-019, 2011-020,2011-021; Case Files PA-11-1, ZC-10-1, MA-
11-3)
SUMMARY
The purpose of this work session is to prepare the Board for its June 27 public meeting to
consider adopting ordinances by emergency related to the Deschutes National Forest's (DNF)
26-acre portion of the former Bend Pine Nursery site. DNF is in the process of building a new
headquarters facility to accommodate all of its administrative functions at one site in the vicinity
of the City of Bend to improve efficiency and reduce costs.
On May 23, Hearings Officer Ken Helms approved the following applications: PA-11-1, ZC-10-1,
and MA-11-3. Please find the decision attached to this staff report and a map of the subject
property. No public comments have been provided or received regarding these applications in
writing or at the public hearing, conducted on Monday, May 2. Specifically, this land use
decision approves the following:
• Amends the Deschutes County Comprehensive Plan map designation for the subject
property from Urban Reserve Area (URA) to Public Facilities (PF). The Board would
approve this decision by adopting Ordinance 2011-019.
• Changes the Deschutes County zone of the subject property from Urban Area Reserve
(UAR10) to Public Facilities (PF). The Board would approve this decision by adopting
Ordinance 2011-020.
• Expands the City of Bend Urban Growth Boundary (UGB) to include the 26-acre DNF
property. The Board would approve this decision by adopting Ordinance 2011-021.
Quality Services Performed with Pride
PROCESS
Deschutes County Hearings Officer Helms discusses the approval procedure on page 3 of the
decision. In sum, land use decisions in the City UGB and UAR are governed by a joint
management agreement adopted by the City and County in 1998. The subject property is in the
City's UAR. Therefore, the County retains land use jurisdiction. The proposed Comprehensive
Plan and zoning amendments are to occur in the UAR prior to the UGB amendment. In
addition, zone changes are required to be in compliance with the Comprehensive Plan.
Therefore, the amendments must be adopted in the following order, which is consistent with the
ordinance numbers:
1. Comprehensive Plan amendment (Ord. 2011-019).
2. Zone Change (Ord. 2011-020).
3. UGB amendment (Ord. 2011-021). This amendment is proposed to be effective upon
the effective date of the City of Bend's ordinance adopting the UGB amendment.
Based on Deschutes County Code (DCC) 22.28.030, summarized below, the Board is required
to approve this decision unless it is appealed or the Board initiates review by the appeal
deadline, which is June 6. If the Board wishes to initiate a review, it must do so at the June 1
meeting since the Board does not meet on June 6. Without an appeal or Board initiated review,
the June 27 meeting will consist of the Board adopting the ordinances without testimony.
DCC 22.28.030 governs County decisions on quasi-judicial Comprehensive Plan amendments
and zone changes (emphasis added below).
22.28.030. Decision on Plan Amendments and Zone Changes.
A. Except as set forth herein, the Hearings Officer or the Planning Commission when acting as
the Hearings Body shall have authority to make decisions on all quasi judicial zone changes
and plan amendments. Prior to becoming effective, all quasi judicial plan amendments and
zone changes shall be adopted by the Board of County Commissioners.
B. In considering all quasi judicial zone changes and those quasi judicial plan amendments on
which the Hearings Officer has authority to make a decision, the Board of County
Commissioners shall, in the absence of an appeal or review initiated by the Board, adopt the
Hearings Officer's decision. No argument or further testimony will be taken by the Board.
C. Plan amendments and zone changes requiring an exception to the goals or concerning
lands designated for forest or agricultural use shall be heard de novo before the Board of
County Commissioners without the necessity of filing an appeal, regardless of the
determination of the Hearings Officer or Planning Commission. Such hearing before the
Board shall otherwise be subject to the same procedures as an appeal to the Board under
DCC Title 22.
D. Notwithstanding DCC 22.28.030(C), when a plan amendment subject to a DCC
22.28.030(C) hearing before the Board of County Commissioners has been consolidated for
a hearing before the Hearings Officer with a zone change or other permit application not
requiring a hearing before the board under DCC 22.28.030(C), any party wishing to obtain
review of the Hearings Officer's decision on any of those other applications shall file an
appeal. The plan amendment shall be heard by the Board consolidated with the appeal of
those other applications.
(Ord. 95 045 §23, 1995; Ord. 90 007 §1, 1990)
CITY OF BEND ACTIONS / TIMELINE
The City of Bend is concurrently processing an amendment to the Bend Area General Plan to
expand the UGB to include this 26-acre site. The City's Hearings Officer Tim Elliot
recommended approval on May 19. No public comments were provided or received at the
public hearing.
The Bend City Council will conduct a public hearing and First Reading of an ordinance to adopt
this UGB amendment on June 1 (the same day as this work session). The Bend City Council is
expected to conduct a Second Reading of the ordinance on June 15, with an effective date of
July 15.
Following the County's adoption of the UGB amendment, the City will immediately initiate
annexation of the subject property.
REASON FOR EMERGENCY
The reason for the emergency adoption is to allow the DNF to connect its new headquarters
facility to the City of Bend's sewer prior to opening, expected in fall 2011. The City will not allow
DNF to connect to its sewer system unless the site is in the city limits. Therefore, this is a public
health-related issue for DNF employees and visitors. If the County adopts the UGB Amendment
Ordinance 2011-021 on June 27 without the emergency clause, the ordinance will not take
effect for 90 days until approximately September 27. This delay would impact the annexation
and sewer hook-up processes, and consequently the facility's planned opening.
DISCUSSION / DECISION
Staff invites Board questions and comments on this land use decision, process, and next steps.
In addition, as stated above, if the Board wishes to initiate review of this application, it must do
so at this meeting. Initiating a review would consist of conducting a public hearing, followed by
deliberations on the proposed ordinances.
ATTACHMENTS:
1. Decision of the Deschutes County Hearings Officer on Case Files PA-11-1, ZC-10-1, and
MA-11-3.
2. UGB Expansion Map, including Comprehensive Plan and Zone Designations.
3. Site Plan (for informational purposes only).
4.
E
C/
m
m
D
z
m e.
D' m
rr-
-•~o' F~Xg~ ~ Y
W1 MAE. -H
gFn
~m
m
~
i ~
F
F
44 m f'c Z TF
~ ~a
~L^e CCCC oc
o
~
vo 4
Q
99
g _
~
8 b' m
8
p
N
m-n
z
$ o
m
0
HA
-
mm
m
N ~
3
F
4
22~l 11
° of N'
PIET
2
x
.ma
USDA FOREST SERVE
~C~ nn vy
S
A
TT
r
a
_
°
BEND PINE ADMIN. SITE -PHASE 7
TsP YkNn wMRAym
°"`""fi"
r 7
TEELE
SSOCIATES
ARCHITECTS
LLC.
SCO
DESNES
u
,
X80 `'O
OVERALL SITE PLAN
NATION p ST
^
R"I
z
9
eEw O oR w onm
8.4 oR eYinm
t
,
vac s.~aesae a
SMSo
BIU SET - FEBRUARY 12, 2010
SR 2.5
Subject Property
17-12-23-00-01800
Plan Amendment from _L L
Urban Reserve Area (URA) - - - "
to Public Facilities (PF)
g Zone Change from Urban UAR10
Area Reserve (UAR) to
Public Facilities (PF)
Urban Growth Boundary
Expansion Area
MI
~I
r
FH
Trm-~~ rrr
EFUTRB
MUA10
Legend PA-11-1 ZC-10-1 MA-11-3
L_J Bend Urban Growth Boundary
Q Subject Property 17-12-23-00-01800
County Zoning
EFUTRB - Tumalo/Redmond/Bend Subzone
MUA10 - Multiple Use Agricultural
UAR10 - Urban Area Reserve - 10 Acre Minimum
SR 2.5 - Residential 2.5 Acre Minimum
Applicant: Deschutes County
Owner: United States of America
Taxlot: 17-12-23-00-01800
Address: 63095 Deschutes Market Rd, Bend
V V
r•ma
DECISION OF THE DESCHUTES COUNTY HEARINGS OFFICER
FILE NUMBERS:
APPLICANT:
OWNER:
PA-11-1, ZC-10-1, MA-11-3
Deschutes County
117 NW Lafayette Avenue
Bend, OR 97701
Deschutes National Forest
1001 SW Emkay Drive
Bend, OR 97702
REQUEST: Proposed amendments to change the Comprehensive Plan map
designation of the subject property from Urban Reserve Area (URA)
to Public Facilities (PF), change the zone of the subject property from
Urban Area Reserve (UAR10) to Public Facilities (PF), and expand
the City of Bend Urban Growth Boundary to include the 26-acre
Deschutes National Forest property.
HEARING DATE: May 2, 2011
RECORD CLOSED: May 2, 2011
STAFF CONTACT: Nick Lelack, Planning Director
1. APPLICABLE STANDARDS & CRITERIA:
A. Oregon Administrative Rules (OAR) Chapter 660
Division 2, Interpretation of Goal 2 Exception Process
Division 12, Transportation Planning
Division 15, Statewide Planning Goals
Division 24, Urban Growth Boundaries
B. Oregon Revised Statues
Chapter 197, Comprehensive Land Use Planning Coordination
Section 298, Priority of Land to be Included Within Urban Growth
Boundary
C. Bend Urban Growth Boundary Zoning Ordinance, Title 19
Chapter 19.116, Amendments, Appeals and Procedures
Section 19.116.010, Amendments
Section 19.116.020, Standards for Zone Change
D. Deschutes County Development Procedures Ordinance, Title 22
Chapter 22.28, Land Use Action Decisions
Section 22.28.030, Decision on Plan Amendments and Zone Changes
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 1
E. Deschutes County Comprehensive Plan, Title 23
Chapter 23.48, Urbanization
Section 23.48.030, Urban Growth Boundary Policies
Section 23.68.020, Public Facilities and Services Policies
F. Bend Area General Plan
G. Joint Management Agreement between the City of Bend and Deschutes County.
II. FINDINGS OF FACT:
A. LOCATION: The subject property is located at 63095 Deschutes Market Road, Bend,
and is identified on Deschutes County Assessor map 17-12-23, as tax lot 1800.
B. LOT OF RECORD: The subject property is part of the former United States Forest
Service (USFS) Bend Pine Nursery. Consistent with prior Hearings Officers decisions
in PA-07-5, PA-08-2/ZC-08-2/MA-08-8 and LR-07-52, I find the subject site is not a lot
of record, but that it need not be in order to be re-designated and rezoned.
C. SITE DESCRIPTION: The subject property is a 26-acre portion of the former Bend
Pine Nursery site which originally consisted of 210 acres. The Deschutes National Forest
(DNF) sold 184 acres of the original Pine Nursery to the Bend Metro Park and Recreation
District (park district) for development of public parks. The park district then conveyed
15 acres to the Bend-La Pine School District for Ponderosa Elementary. The 26-acre
parcel subject to this plan amendment application, is generally level, irregular in shape,
and developed with twelve buildings that serve a variety of Forest Service programs.
Water is available to the subject property from the Avion Water Company (Avion) and
city sewer facilities are located nearby. The subject property has direct access from
Deschutes Market Road, a designated rural collector road in the County, and a major
collector in the City of Bend.
Site History
The United States of America acquired the subject property in 1943, and beginning in the
late 1940's the property housed the facilities of the Bend Pine Nursery. Subsequent to
the closure of the Bend Pine Nursery as a production nursery in 1999, the property
continued to be the location for warehouse and other support facilities for DNF and the
Bend-Fort Rock Ranger District.
D. SURROUNDING USES: The subject site is surrounded to the north and west by the
Bend Metro Park and Recreation District Pine Nursery community park. To the east are
primarily residential uses on lands zoned UAR-10. To the south are the North Unit
Irrigation Canal and residential uses on lands within the City of Bend zoned RS (Urban
Standard Residential).
E. PROCEDURAL HISTORY: The application for ZC-10-1 was submitted on March 11,
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 2
2010. The first evidentiary hearing was scheduled for April 27, 2010. Due to the nature
of the applications, notice of application along with a number of notices of public hearing
were mailed to property owners within 250 feet of the subject property. The Planning
Division also published notice of the public hearings in the Bend Bulletin. No comments
were received to any of the mailed or published notices.
The initial public hearing was continued six times to May 2, 2011.` File number PA-11-1
was submitted on January 11, 2011 with the intent that the zone change and plan
amendment be processed concurrently. County file PA-11-1 was modified via MA-11-3
on April 12, 2011 for the proposed 26-acre UGB amendment. At the first public hearing
and each of the continued hearings, the hearings officer provided opportunity for
testimony by the applicant and the public. Other than some preliminary comments made
at the first public hearing by the applicant, no other public testimony was offered at any
of the public hearings.
F. ADDITIONAL PROCEDURE: Land use actions adjacent to the City UGB in the
Urban Area Reserve are governed by a joint management agreement (JMA) adopted by
the City and Deschutes County (County) on February 24, 1998. This document calls for
cooperation between the City and County in planning for the UAR10 zone. For land use
decisions within the urban reserve and, therefore, outside of the UGB, the County retains
jurisdiction with a requirement that the City receive notice of the application. At this
time, the subject property is within the urban reserve. Therefore, the County retains
jurisdiction over the proposed plan amendment and zone change.
In addition to the proposed plan amendment and zone change, the applicant proposes to
expand the City UGB to include the 26-acre DNF site. Per the JMA, the City and County
share responsibility for processing UGB expansions. Quasi-judicial applications are
reviewed by a hearings officer at both the City and the County. Then, if approved, both
the County Commissioners and City Council will hold public hearings and adopt
implementing ordinances to enact the UGB expansion. Finally, the amendment must be
transmitted to the Oregon Department of Land Conservation and Development (DLCD)
for acknowledgement of compliance with applicable state land use laws.
As noted previously, the County only retains jurisdiction over those land use decisions
within the urban reserve and outside of the UGB. For this reason, if the proposed
amendments are approved they must be approved in the following order:
1. Plan Amendment and Zone Change
2. UGB expansion.
G. PROPOSAL: At this time, the DNF desires to locate all of its administrative functions
at one site in the vicinity of the City to improve efficiency and reduce costs. Currently,
administrative functions occupy four sites: Forest Headquarters office on Emkay Drive;
Bend-Fort Rock District office on NE 3`d Street; Scott Street Work Center on SW 2nd
Each request for continuance is included in the record.
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest
3
Street; and Bend Pine Work Center on Deschutes Market Road (subject property). John
Allen, Forest Supervisor, in a Decision Notice dated January 17, 2008, authorized the
implementation of Alternative 2 of Environmental Assessment for the Collocation of the
Bend-Fort Rock Ranger District Office, Forest Headquarters Office, and Work Center
(no date). This decision would require the construction of a new office and expanded
work center at the Bend Pine Work Center, also known as Bend Pine Administrative Site.
A total of 12 sites were considered for the new collocated office and work center. Due to
the high cost of real estate, the Regional Forester and Forest Supervisor decided to
consider only sites owned by the Forest Service, which eliminated seven sites. The
remaining five sites were then analyzed in the Environmental Assessment (see below).
The applicant is proposing amendments to change the Comprehensive Plan Map
designation of the subject property from Urban Reserve Area (URA) to Public Facilities
(PF), change the zone of the subject property from Urban Area Reserve (UAR10) to
Public Facilities (PF), and expand the City UGB to include the 26-acre DNF property.
The 26-acre expansion site would accommodate the co-location of several DNF
operations including the construction of. 43,000-square-foot office, 12,000-square-foot
fire management building, 17,000-square-foot warehouse, 10,000 square feet of road and
maintenance shops, 5,600-square-foot crew quarters for seasonal employees, and
approximately 7.5 acres of paving for parking, access, and walkways. In addition to the
above-referenced construction, three existing buildings (packing shed, office, and north
pre-cooler) would be removed.
No development is proposed as part of these applications. The application materials
and supporting documents are incorporated herein by this reference.
H. AGENCY COMMENTS: The Planning Division mailed notice to several public
agencies and received the following comments.
Environmental Soils Division. [Deschutes National Forest] could apply for a Wastewater
Pollution Control Facility (WPCF) permit from DEQ.
[STAFF COMMENT: The above comment from Environmental Soils was based on the
original DNF relocation project which planned for on-site sewage disposal. The current
relocation project would connect to City sewer. No WPCF permit would be required.]
County Senior Transportation Planner. I've reviewed the materials for PA-11-1, ZC-10-1
regarding transportation findings. I have limited my comments to facilities under the
jurisdiction of Deschutes County. I agree with the proposed mitigation of a northbound
left-turn lane on Deschutes Market Road at the site's access. I will defer to City of Bend
staff regarding comments and mitigations for affected intersections that are under the
City's jurisdiction.
County Road Department. Deschutes Market Road is a County Road (rural collector
classification) with an ADT of 4784 (2008 count) and a paved width of 30 feet. If the UGB
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 4
expansion is approved, Deschutes Market Road would be under the City of Bend's
jurisdiction along the eastern frontage of the subject property. Any road improvement to
Deschutes Market Road will have to meet City of Bend standards for an urban collector
street.
Bend Fire Department.
Fire Safety During Construction and Demolition - 2007 IFC Chapter 14
Approved fire department access roads, required water supply, fire hydrants, and safety
precautions shall be made available prior to the issuance of a building permit.
Water Supply - 2004 Oregon IFC Section 508
An approved water supply capable of supplying the required fire flow for fire protection
shall be provided to premises upon which facilities, buildings or portions of buildings are
hereafter constructed or moved into or within the jurisdiction. See the City of Bend Fire
Marshal for approval of firefighting water supply.
Obstruction & Protection of Fire Hydrant - 2007 Oregon IFC 508.5.4 through
508.5.6
A 3-foot clear space shall be maintained around the circumference of fire hydrants. When
exposed to vehicular damage, concrete curbing, sidewalks, or 4 inch concrete filled
bollards placed 3 feet from hydrants shall suitably protect fire hydrants. Hydrants shall be
coated with approved red paint color and markings.
Premises Identification - 2007 Oregon IFC 505.1
Approved numbers or addresses shall be placed on all new and existing buildings in such
a position as to be plainly visible and legible from the street or road fronting the property.
Said numbers shall contrast with their background and visible at night.
Street or Road Signs - 2007 Oregon IFC 505.2
Streets and roads shall be identified with approved signs. Signs shall be of an approved
size and weather resistive construction.
Fire Lanes - 2007 Oregon IFC 503.3
Approved signs or other approved notices shall be provided for fire apparatus access
roads to identify such roads or prohibit the obstruction thereof. Such signs or notices shall
be kept in legible condition at all times. Fire lane curbs shall be painted bright red with
white letters. The stroke shall be 1 inch with letters 6 inches high to read "No Parking
Fire Lane". Spacing for signage shall be every 50 feet.
Fire Apparatus Access Roads (General) - 2007 Oregon IFC Section 503 and
Appendix D
Fire apparatus access roads shall be placed within 150 of all exterior walls of the first
floor of all buildings. Fire apparatus access roads shall have an unobstructed width of not
less than 20 feet designed with an approved driving surface to support the imposed GVW
of 60,000 lbs. and a vertical clearance of not less than 13 feet 6 inches. Turning radius
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 5
shall not be less than 45 feet and gradient shall not exceed 12 percent unless the
authorities having jurisdiction approve a variance. Dead-end access roads in excess of
150 feet in length shall be provided with approved provisions for the turning around of
fire apparatus. A cul-de-sac, hammerhead or other means for the turning around of fire
apparatus may be approved.
Aerial Access Roads - 2007 Oregon IFC Appendix D, Section D105
Buildings or portions of buildings or facilities exceeding 30 feet in height above the
lowest level of fire department vehicle access shall be provided with approved fire
apparatus access roads capable of accommodating fire department aerial apparatus.
Overhead utility and power lines shall not be located within the aerial fire apparatus
access roadway. At least one of the required access routes meeting this condition shall be
located within a minimum of 15 feet and a maximum of 30 feet from the building, and
shall be positioned parallel to one entire side of the building.
Key Boxes - 2007 Oregon IFC Section 506
Key Box (Knox Box) for Fire Department access is required to be installed at all locked
gates and barriers. An application for the Knox Box is available by calling the Fire
Prevention office at (541) 322-6309.
Portable Fire Extinguishers - 2007 Oregon IFC Section 906
Fire extinguishers rating shall not be less than a 2A:1 OBC. Maximum unobstructed travel
distance to any approved extinguisher shall not be more than 75 feet.
Dumpsters - 2007 Oregon IFC 304.3
Dumpsters and containers with an individual capacity of 1.5 cubic yards or more shall not
be stored in buildings or placed within 5 feet of combustible walls, openings, or
combustible roof eves unless area is protected by an approved automatic fire sprinkler
system.
Gas Meters & Piping - 2007 Oregon IFC Section 312
Aboveground gas meters, regulators and piping exposed to vehicular damage due to
proximity to alleys, driveways or parking areas shall be protected in an approved manner.
The following agencies and individuals did not respond to the notice: County Assessor,
County Building Division, Central Oregon Irrigation District, Swalley Irrigation District,
Avion Water Company, City of Bend Planning Department, City of Bend Public Works
Department, Department of Environmental Quality, Department of Land Conservation
and Development, and Oregon Department of Transportation.
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 6
III. CONCLUSIONS OF LAW
A. Statewide Planning Goals
1. Goal 1: Citizen Involvement
Oregon Statewide Planning Goal 1 seeks "To develop a citizen involvement
program that insures the opportunity for citizens to be involved in all phases
of the planning process."
FINDING: During this land use process, public notice was provided by the county to
affected agencies and surrounding property owners. The County Hearings Officer held a
public hearing on May 2, 2011. The Board of County Commissioners will also hold a
public hearing. The City of Bend will also provide notice for their concurrent process.
Goal 1 is met.
2. Goal 2: Land Use Planning
Oregon Statewide Planning Goal 2 seeks "To establish a land use planning
process and policy framework as a basis for all decision and actions related
to use of land and to assure an adequate factual base for such decisions and
actions."
FINDING: In compliance with Goal 2, concurrent applications were processed with the
City and County to expand the Bend UGB. Based on the record, there is sufficient
information to demonstrate an adequate factual basis and to enable both jurisdictions to
make an informed decision regarding the proposed amendments. Goal 2 is met.
3. Goal 3: Agricultural Lands; Goal 4: Forest Lands
Oregon Statewide Planning Goal 3 seeks "To preserve and maintain
agricultural lands."
Oregon Statewide Planning Goal 4 seeks "To conserve forest lands"
FINDING: The subject property is not identified as agricultural or forest land on either
the Bend Area General Plan or Deschutes County Comprehensive Plan Maps. The
subject property is identified as Urban Area Reserve in both Plans. Under OAR 660-024-
0020(1)(b), Goals 3 and 4 do not apply to UGB amendments. The application is
consistent with Goals 3 and 4.
4. Goal 5: Open Spaces, Scenic and Historic Areas, and Natural Resources
Oregon Statewide Planning Goal 5 seeks "To protect natural resources and
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 7
conserve scenic and historic areas and open spaces."
FINDING: Goal 5 resources are listed in the county's acknowledged Comprehensive
Plan. There are no identified Goal 5 resources on the site. Utilizing the selected site as
proposed will have no significant adverse impact on the amount of open space or scenic
views available in the County. Goal 5 is met.
Impacts on related resources:
Mineral and aggregate resources: The subject property has never been zoned for mineral
or aggregate resources.
Energy sources: There are no known energy resources on the site such as natural gas, oil,
coal or geothermal heat.
Fish and wildlife habitat: The property has no fish or wetland habitat. The site is
unlikely to contain threatened or endangered species. The site is already developed and
surrounded by development that limits its potential for threatened or endangered species.
Ecologically and scientifically significant natural areas, including desert areas: Nothing
about the selected site make it ecologically or scientifically significant.
Outstanding scenic views: Nothing about the site indicates it has a significantly better
view than other sites in the vicinity.
Water areas, wetlands, watersheds, and groundwater resources: There are no wetlands or
watersheds within the subject site. Although the North Unit Canal borders the subject
property to the south, there are no anticipated impacts to the canal or its waters. No
watersheds will be affected by the amendments. The site will be served by City sewer
and will not adversely affect the groundwater due to septic discharge.
Wilderness areas: The site does not meet the definition of "wilderness areas" as
described within the Oregon State Goals and Guidelines. The property is currently
developed with the Forest Service's Bend Pine Work Center, and does not contain
pristine surroundings or old growth trees.
Historic areas, sites, structures and objects: The subject property has no structures listed
on the National Register of Historic Places. No structures or places of historical
significance have been determined to exist on or near the property selected.
Cultural areas: The site has no known cultural resources.
5. Goal 6: Air, Water and Land Resources Quality
Oregon Statewide Planning Goal 6 seeks "To maintain and improve the
quality of the air, water, and land resources of the state."
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 8
FINDING: Maintaining or improving the quality of the community's air, water and land
resources will be assured through enforcement of state and local regulations. Expansion
of the UGB and annexation of the parcel to the City of Bend will ensure connection to
City sewer services. The record shows that noise levels are unlikely to exceed DEQ
noise regulations.
6. Goal 7: Areas Subject to Natural Disasters and Hazards
Oregon Statewide Planning Goal 7 seeks "To protect people and property
from natural disasters and hazards"
FINDING: There are no areas within the site that are subject to flooding or landslide
activity. The wildfire hazard for the site is the same as other areas where junipers, pine
and native brush exist. Development of the site will reduce the potential for wildfires by
providing adequate water to meet the fire flow requirements for the proposed Forest
Service operations.
7. Goal 8: Recreational Needs; Goal 9: Economic Development; Goal 10:
Housing
Oregon Statewide Planning Goal 8 seeks "To satisfy the recreational needs of
the citizens of the state and visitors and, where appropriate, to provide for
the siting of necessary recreational facilities including destination resorts."
Oregon Statewide Planning Goal 9 seeks "To provide adequate opportunities
throughout the state for a variety of economic activities vital to the health,
welfare, and prosperity of Oregon's citizens."
Oregon Statewide Planning Goal 10 seeks "To provide for the housing needs
of citizens of the state."
FINDING: Given the small size and specific need addressed by the proposed UGB
expansion, staff found, and I agree, that Goals 8, 9, and 10 are not relevant.
8. Goal 11: Public Facilities and Services
Oregon Statewide Planning Goal 11 seeks "To plan and develop a timely,
orderly and efficient arrangement of public facilities and services to serve as
a framework for urban and rural development."
FINDING: The record shows that the existing water lines and sewer service near the site
will allow for the efficient and cost effective extension of these needed services to the
site. As discussed in more detail below, planned improvements to City roadways will
provide adequate access to the site. For these reasons, the record is sufficient to show
that public facilities and services are available to serve the needs of the proposed Forest
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 9
Service operations.
9. Goal 12: Transportation
Oregon Statewide Planning Goal 12 seeks "To provide and encourage a safe,
convenient and economic transportation system."
FINDING: OAR 660-012 implements Oregon Statewide Planning Goal 12. This rule
requires the City to prepare and adopt a Transportation System Plan (TSP) as part of its
comprehensive plan. The Bend Urban Area Transportation System Plan was adopted
October 11, 2000. The proposal's compliance with OAR 660-012 is discussed below.
10. Goal 13: Energy Conservation
Oregon Statewide Planning Goal 13 seeks "To conserve energy."
FINDING: The proposed amendments and co-location of multiple Forest Service
functions at a single site will improve operational efficiency and reduce operational costs.
In addition, co-location will eliminate Forest Service personnel trips between the four
current sites. Goal 13 is met.
11. Goal 14: Urbanization (amended effective April 28, 2005)
Oregon Statewide Planning Goal 14 seeks "To provide for orderly and
efficient transition from rural to urban use, to accommodate urban
population and urban employment inside urban growth boundaries, to
ensure efficient use of land, and to provide for livable communities."
Urban Growth Boundaries
Urban growth boundaries shall be established and maintained by cities,
counties and regional governments to provide land for urban development
needs and to identify and separate urban and urbanizable land from rural
land. Establishment and change of urban growth boundaries shall be a
cooperative process among cities, counties and, where applicable, regional
governments. An urban growth boundary and amendments to the boundary
shall be adopted by all cities within the boundary and by the county or
counties within which the boundary is located, consistent with
intergovernmental agreements, except for the Metro regional urban growth
boundary established pursuant to ORS chapter 268, which shall be adopted
or amended by the Metropolitan Service District.
Land Need
Establishment and change of urban growth boundaries shall be based on the
following:
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 10
1. Demonstrated need to accommodate long-range urban population,
consistent with a 20-year population forecast coordinated with
affected local governments; and
2. Demonstrated need for housing, employment opportunities, livability
or uses such as public facilities, streets and roads, schools, parks or
open space, or any combination of the need categories in this
subsection (2).
In determining need, local government may specify characteristics, such as
parcel size, topography or proximity, necessary for land to be suitable for an
identified need. Prior to expanding an urban growth boundary, local
governments shall demonstrate that needs cannot reasonably be
accommodated on land already inside the urban growth boundary.
FINDING: The application materials include an Environmental Assessment for the
Collocation of the Bend-Fort Rock Ranger District Office, Forest Headquarters Office,
and Work Center (EA), which details the proposed co-location and the alternative sites
considered. According to the EA, current Forest Service regional policy and direction is
to co-locate facilities when those facilities are located within 35 miles of each other.
Forest Service administrative functions occupy four sites: Forest Headquarters office on
Emkay Drive; Bend-Fort Rock District office on NE 3`d Street; Scott Street Work Center
on SW 2°d Street; and Bend Pine Work Center (BPWC) on Deschutes Market Road. The
greatest distance between these sites is seven miles (Forest Headquarters Office to
BPWC).
Twelve sites were considered for the co-location project. Due to the high cost of real-
estate, the Regional Forester and Forest Supervisor decided to consider only sites owned
by the Forest Service. This eliminated seven sites from further consideration. The
remaining five sites are mapped in the EA and were identified as:
1. Bend Pine Work Center
2. Cascade Lakes site (Cascade Lakes Highway near the Entrada Lodge)
3. Scott Street Work Center
4. Knott Road/Baker Road interchange site
5. China Hat Road site
All of these sites were evaluated using the following criteria:
1. Ability to locate all Forest Service administrative functions at one site
2. Located within the Bend Urban Growth Boundary or Urban Reserve areas
3. Easy public access by major arterial roads or highways
4. Costs and level of complexity of development
5. A minimum of 10 acres in size
The record shows that the Scott Street site is the only Forest Service-owned site currently
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 11
within the Bend UGB. As required by the above criteria, the applicant must demonstrate
why the proposed need cannot be reasonably accommodated on land already inside the
UGB. In this case, the 6.4-acre Scott Street site would not be large enough to
accommodate the co-location proposal. The EA estimates that approximately 10-15 acres
of land are required to co-locate the various operations onto a single site.
With regard to the other sites, the EA identified specific characteristics which are
necessary for a site to be selected for the proposed co-location. Based upon these
characteristics, the applicant chose the Bend Pine Work Center (BPWC) as the preferred
alternative. The EA indicates that the BPWC site has a number of advantages including
sufficient land to accommodate the co-location, adjacency to the existing UGB, readily
available utilities such as sewer and water, and easy access to Highway 97 via Empire
Avenue (an urban arterial). Unlike the BPWC site, the three alternative sites which are
outside of the Bend UGB (Cascade Lakes, Knott Road, and China Hat Road) are not
adjacent to the existing UGB. Although the remaining sites (Cascade Lakes, Knott Road,
and China Hat Road) are all large enough to accommodate the co-location, the applicant
indicates that necessary public services such as City sewer and water are not readily
available at these sites.
In addition to the lack of available sewer and water service, the EA identifies other
considerations. With regard to the Cascade Lakes property, the EA cites relatively poor
access to Highway 97 because the Cascade Lakes property is located approximately four
miles from Highway 97, with the most direct route to the site via Reed Market Road
(primarily a local road). For the Knott Road site, there is no current road access.
Development of this site would require acquiring easements through private property.
The EA provides a sufficient basis for concluding that land needed for a proposed public
facility cannot be obtained at alternative sites within the Bend UGB.
Boundary Location
The location of the urban growth boundary and changes to the boundary
shall be determined by evaluating alternative boundary locations consistent
with ORS 197.298 and with consideration of the following factors:
FINDING: This criterion requires an evaluation of alternative boundary locations
consistent with ORS 197.298. This discussion is detailed below.
1. Efficient accommodation of identified land needs;
FINDING: DNF has identified a need to consolidate multiple Forest Service Operations
at a single site to increase efficiency and reduce costs. The subject property will have
ready access to necessary utilities such as sewer and water, and easy access to an arterial
(Empire) and highway (Highway 97). Additionally, the 26-acre BPWC site is large
enough to accommodate all of the applicant's administrative functions.
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 12
The record shows that the DNF has demonstrated efficient accommodation of an
identified land need.
2. Orderly and economic provision of public facilities and services;
FINDING: Public facilities and services are available to the site. Avion water currently
serves the existing Forest Service operations on-site. A City sewer interceptor exists
along the south property line and the North Unit Canal. If the UGB expansion is
approved, DNF will extend and connect to these utilities. Fire protection service would
be provided by the Bend Fire Department, with police service provided by the Bend
Police Department. The record shows that stormwater runoff will be contained on-site.
The subject property has frontage along, and existing access to, Deschutes Market Road,
a publicly dedicated road.Z
With regard to traffic impacts, a traffic study in the record (Ferguson & Associates, Inc.;
February 2008) reached the following conclusions:
• The project is forecast to generate 172 AM peak hour trips, 164 PM peak hour
trips, and 1,394 daily trips.
The warrant for adding a northbound left-turn lane on Deschutes Market Road to
the entrance of the site was met for the year 20083 with the project during the a.m.
and p.m. peak hour for both driveways4. The proposed driveway with left-turn
lane for northbound traffic would meet City of Bend operational standards for the
years 2011 and 2024 for both AM and PM peak hours.
City of Bend Standards and Specifications are met for all study intersections with
two exceptions:
1. The intersection of Deschutes Market Road and Butler Market Road
would not meet City of Bend operational standards for PM peak hour
traffic for the year 2008 with or without the project. Traffic signal
warrants for both AM and PM peak traffic would be met for the year 2024
with or without the project.
2. The intersection of Butler Market Road at 27th Street would not meet City
of Bend operational standards for PM peak hour traffic for the year 2024
with or without the project.
• Traffic mitigation improvements for intersections not meeting City standards
2 If the UGB expansion is approved, Deschutes Market Road along the frontage of the subject property would
become a city facility.
3 The traffic study was completed in 2008 with an expected construction completion date in 2008. Therefore, the
traffic study references the project year as 2008. For the purposes of this staff report, the project year is 2011.
4 The original proposal contemplated two access driveways from Deschutes Market Road, one at the southern end of
the site near the North Unit Canal and one at the northern end. The revised Master Site Plan submitted on December
2, 2008 shows only the north driveway. The revised plan still proposes a northbound left-turn lane on Deschutes
Market Road to the subject property.
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 13
include:
1. A southbound right-turn lane on Deschutes Market Road at the Butler
Market Road intersection will meet the City of Bend operational standards
for 2008.
2. The City of Bend has a long term plan to widen 27th Street to five lanes at
the intersection with Butler Market Road and extend 27th Street north to
connect with Empire Avenue. The added capacity of a five-lane cross
section on 27th Street would offset anticipated traffic impacts.
• The applicant expects to pay their commensurate share of the above
improvements.
Subsequent to this traffic study, DNF and the City worked on transportation
mitigation measures to address the deficiencies at the intersections of Deschutes
Market Road/Butler Market Road and Butler Market Road/27th Street. Asa result
of these negotiations, DNF has agreed to the following:
Pay $130,000 to the City for the construction of the southbound right-turn lane
at Deschutes Market Road/Butler Market Road.S This improvement would meet
the City of Bend operational standards for the project year.
Pay $253,100 to fund future roundabout improvements to the Butler Market
Road/Deschutes Market Road and Butler Market Road/27th Street intersections.
According to the letter from Mr. Nick Arnis, City Transportation Manager, with
this contribution, in addition to the collection of system development charges and
future anticipated proportionate share contributions from other developments, the
planned transportation improvements for the Butler Market Road/Deschutes
Market Road and Butler Market Road/27th Street intersections are reasonably
likely to be provided by the end of the planning period. These two intersections
are under the jurisdictional responsibility of the City and are identified in the
City's Transportation System Plan as planned facilities.
• Pay $68,152.60 for DNF's proportionate share of the Empire Road Corridor
Project.
All of this information indicates that public facilities will be adequate to accommodate the
proposed use. The record shows that although the traffic study was conducted in 2008, and the
application relies on that study, there is no evidence in the record that circumstances have
changed significantly such that the analysis in the 2008 study would no longer be sufficient to
respond to Goal 14. In fact, testimony at the public hearing indicated that due to the economic
downturn beginning in 2008, demand for capacity in and around the roadways in question is
5 Based on staffs conversation with Mr. Colin Stephens, City Planning Manager, the city plans a sewer pipeline
improvement project along the Butler Market Road right-of-way. Rather than have DNF construct the turn lane and
then have the pipeline project impact the roadway improvement, DFN has agreed to pay for the city to construct the
roadway improvement either after or concurrently with the pipeline project. Reference April 6, 2011 memo from
Ms. Mary Winters, City Attorney, and Mr. Stephens attached to April 6, 2011 email from Mr. Nick Lelack.
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 14
likely to have decreased from 2008 to the time of this decision.
3. Comparative environmental, energy, economic and social
consequences;
FINDING: The environmental, economic, social and energy consequences resulting
from the proposed amendments and expansion of existing DNF operations at the site are
discussed below.
Environmental: The 26-acre expansion site is flat and currently developed with the Bend
Pine Work Center, including a number of existing structures. No known rare or
endangered species occupy the site, and the site does not possess any significant natural
features such as wetlands, waterways (the North Unit Canal borders the site to the south),
or rim rock. Stormwater runoff will be contained on-site. The record shows that the
proposed amendments and DNF co-location of operations will have no significant
adverse impact on the environment.
Enemy: The BPWC site is not known to contain energy resources such as known
deposits of oil and natural gas, or geothermal resources. The availability of other
potential energy sources, such as wind and solar, is equal to any other property in the
surrounding area. Since the site will allow the co-location of numerous administrative
and operational functions at a single site, employee trips between the four existing sites
will be greatly reduced. Therefore, the proposed amendments and DNF co-location of
operations will not have a significant adverse impact on energy resources.
Economic: According to the EA, both the Forest Headquarters and Bend-Fort Rock
(BFR) offices are leased. The combined lease payment for these two locations is
approximately $1,000,000 per year. The proposed UGB expansion and co-location will
allow DNF to save that money for their operations. Additionally, the co-location will
reduce travel time and costs associated with DNF personnel commuting between the four
existing sites. The proposed co-location will provide an economic benefit to DNF and
the public.
Social: The Statewide Planning Goals define Social Consequences as follows:
The tangible and intangible effects upon people and their relationships with the
community in which they live resulting from a particular action or decision.
According to the record, one tangible effect will be increased traffic. An intangible effect
could include a feeling from the community that the development is significantly more
intense than what would be expected given the predominantly residential and community
park uses that surround the site. An additional intangible effect could be an increased
level of frustration from the community due to increased vehicle trips. However, once
the proposed amendments are approved, the subject property will be annexed into the
City and zoned PF to allow greater development density, and as discussed in the findings
above, DNF will contribute to the cost of transportation facility improvements.
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 15
For all these reasons, I find that the Environmental Assessment is sufficient to
demonstrate the comparative environmental, energy, economic and social consequences
of DNF's project were considered.
4. Compatibility of the proposed urban uses with nearby agricultural
and forest activities occurring on farm and forest land outside the
UGB.
FINDING: The BPWC site is not located near agricultural or forest activities. The site
is surrounded on the north and west side by the Pine Nursery community park, on the east
side by Deschutes Market Road and rural residential uses on UAR-zoned lands, and on
the south by the North Unit Canal and urban residential development on lands within the
City of Bend zoned RS (Urban Standard Residential). The record shows that the
proposed amendments or co-location will not adversely impact farm and forest land
outside the UGB.
Urbanizable Land
Land within urban growth boundaries shall be considered available for
urban development consistent with plans for the provision of urban facilities
and services. Comprehensive plans and implementing measures shall
manage the use and division of urbanizable land to maintain its potential for
planned urban development until appropriate public facilities and services
are available or planned.
FINDING: Both the City and the County have developed comprehensive plans and
implementing ordinances to manage the use and division of urbanizable land in order to
maintain its potential for planned urban development. Based on all the information in the
record, the proposal is consistent with those plans.
Unincorporated Communities
FINDING: The expansion site is not located within an unincoporated community.
Single-Family Dwellings in Exception Areas
FINDING: No single-family dwellings are proposed.
Rural Industrial Development
FINDING: No industrial development is proposed.
12. Goal 15: Willamette River Greenway; Goal 16: Estuarine Resources; Goal
17: Coastal Shorelands; Goal 18: Beaches and Dunes; Goal 19: Ocean
Resources
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 16
FINDING: These Goals are not applicable.
B. Oregon Revised Statutes, 197.298
Priority of Land to be Included Within Urban Growth Boundary.
(1) In addition to any requirements established by rule addressing urbanization,
land may not be included within an urban growth boundary except under
the following priorities:
(a) First priority is land that is designated urban reserve land under ORS
195.145, rule or metropolitan service district action plan.
(b) If land under paragraph (a) of this subsection is inadequate to
accommodate the amount of land needed, second priority is land
adjacent to an urban growth boundary that is identified in an
acknowledged comprehensive plan as an exception area or
nonresource land. Second priority may include resource land that is
completely surrounded by exception areas unless such resource land
is high-value farmland as described in ORS 215.710.
FINDING: As noted in foregoing findings, Goal 14 requires the proposed expansion to
be consistent with ORS 197.298. Although the subject property is designated as Urban
Area Reserve in both the Bend Area General Plan and the Deschutes County
Comprehensive Plan, these lands were not designated under ORS 195.145. Rather, these
lands were designated prior to implementation of ORS 195 and, therefore, the City does
not have any `first priority' lands available for the proposed need-specific UGB
expansion. The subject property is considered an exception area and consequently is
categorized as a `second priority' land, which is the highest priority land available.
(c) If land under paragraphs (a) and (b) of this subsection is inadequate
to accommodate the amount of land needed, third priority is land
designated as marginal land pursuant to ORS 197.247 (1991 Edition).
(d) If land under paragraphs (a) to (c) of this subsection is inadequate to
accommodate the amount of land needed, fourth priority is land
designated in an acknowledged comprehensive plan for agriculture or
forestry or both.
FINDING: Because the subject property is classified as second priority, these sections
do not apply.
(2) Higher priority shall be given to land of lower capability as measured by the
capability classification system or by cubic foot site class, whichever is
appropriate for the current use.
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 17
FINDING: The EA included in the record indicates the soils on the subject property
"are mainly Deskamp series," described as loamy sands for which wind erosion and high
permeability are concerns. The EA states "manure and chemicals were added to the soils
during the former nursery operations." The EA also states that with the proposed
development of the site, approximately 10 acres of soil would be placed in a non-
productive state due to construction of buildings, and the remaining approximately 16
acres would be landscaped and irrigated to maintain soil productivity. The record does
not indicate the National Resource Conservation Service (NRCS) capability rating or
classification for these soils or how those ratings compare with ratings for soils on other
potential sites. It is likely that the without the soil amendments that have occurred over
time, that the soil capability of the subject site would be no better than the alternative
sites considered. This provision is met.
(3) Land of lower priority under subsection (1) of this section may be included in
an urban growth boundary if land of higher priority is found to be
inadequate to accommodate the amount of land estimated in subsection (1) of
this section for one or more of the following reasons;
(a) Specific types of identified land needs cannot be reasonably
accommodated on higher priority lands;
(b) Future urban services could not be provided to the higher priority
due to topographical or other physical constraints; or,
(c) Maximum efficiency of land uses within a proposed urban growth
boundary requires inclusion of lower priority lands in order to
include or to provide services to higher priority lands.
FINDING: As discussed above, there is no first priority land, and the subject property
constitutes second priority land and the highest priority land available.
C. Oregon Administrative Rules (ORS)
1. Section 660-004-0010, Application of the Goal 2 Exception Process to Certain
Goals.
C. When a local government changes an established urban growth
boundary applying Goal 14 as amended April 28, 2005, a goal
exception is not required unless the local government seeks an
exception to any of the requirements of Goal 14 or other applicable
goals.
FINDING: The County has applied Goal 14 as amended April 28, 2005. Since the
applicant does not seek any goal exception, a goal exception is not required for the
proposed UGB expansion.
2. Section 660-012-0060, Plan and Land Use Regulation Amendments.
(1) Where an amendment to a functional plan, an acknowledged
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 18
comprehensive plan, or a land use regulation would significantly
affect an existing or planned transportation facility, the local
government shall put in place measures as provided in section (2) of
this rule to assure that allowed land uses are consistent with the
identified function, capacity, and performance standards (e.g. level of
service, volume to capacity ratio, etc.) of the facility. A plan or land
use regulation amendment significantly affects a transportation
facility if it would:
(a) Change the functional classification of an existing or planned
transportation facility (exclusive of correction of map errors in
an adopted plan);
(b) Change standards implementing a functional classification
system; or
(c) As measured at the end of the planning period identified in the
adopted transportation system plan:
(A) Allow land uses or levels of development that would
result in types or levels of travel or access that are
inconsistent with the functional classification of an
existing or planned transportation facility;
(B) Reduce the performance of an existing or planned
transportation facility below the minimum acceptable
performance standard identified in the TSP or
comprehensive plan; or
(C) Worsen the performance of an existing or planned
transportation facility that is otherwise projected to
perform below the minimum acceptable performance
standard identified in the TSP or comprehensive plan.
(2) Where a local government determines that there would be a
significant effect, compliance with section (1) shall be accomplished
through one or a combination of the following:
(a) Adopting measures that demonstrate allowed land uses are
consistent with the planned function, capacity, and
performance standards of the transportation facility.
(b) Amending the TSP or comprehensive plan to provide
transportation facilities, improvements or services adequate to
support the proposed land uses consistent with the
requirements of this division; such amendments shall include a
funding plan or mechanism consistent with section (4) or
include an amendment to the transportation finance plan so
that the facility, improvement, or service will be provided by
the end of the planning period.
(c) Altering land use designations, densities, or design
requirements to reduce demand for automobile travel and
meet travel needs through other modes.
(d) Amending the TSP to modify the planned function, capacity or
performance standards of the transportation facility.
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 19
(e) Providing other measures as a condition of development or
through a development agreement or similar funding method,
including transportation system management measures,
demand management or minor transportation improvements.
Local governments shall as part of the amendment specify
when measures or improvements provided pursuant to this
subsection will be provided.
(3) Notwithstanding sections (1) and (2) of this rule, a local government
may approve an amendment that would significantly affect an existing
transportation facility without assuring that the allowed land uses are
consistent with the function, capacity and performance standards of
the facility where:
(a) The facility is already performing below the minimum
acceptable performance standard identified in the TSP or
comprehensive plan on the date the amendment application is
submitted;
(b) In the absence of the amendment, planned transportation
facilities, improvements and services as set forth in section (4)
of this rule would not be adequate to achieve consistency with
the identified function, capacity or performance standard for
that facility by the end of the planning period identified in the
adopted TSP;
(c) Development resulting from the amendment will, at a
minimum, mitigate the impacts of the amendment in a manner
that avoids further degradation to the performance of the
facility by the time of the development through one or a
combination of transportation improvements or measures;
(d) The amendment does not involve property located in an
interchange area as defined in paragraph (4)(d)(C); and
(e) For affected state highways, ODOT provides a written
statement that the proposed funding and timing for the
identified mitigation improvements or measures are, at a
minimum, sufficient to avoid further degradation to the
performance of the affected state highway. However, if a local
government provides the appropriate ODOT regional office
with written notice of a proposed amendment in a manner that
provides ODOT reasonable opportunity to submit a written
statement into the record of the local government proceeding,
and ODOT does not provide a written statement, then the local
government may proceed with applying subsections (a)
through (d) of this section.
(4) Determinations under sections (1)-(3) of this rule shall be coordinated
with affected transportation facility and service providers and other
affected local governments.
(a) In determining whether an amendment has a significant effect
on an existing or planned transportation facility under
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 20
subsection (1)(c) of this rule, local governments shall rely on
existing transportation facilities and services and on the
planned transportation facilities, improvements and services
set forth in subsections (b) and (c) below.
(b) Outside of interstate interchange areas, the following are
considered planned facilities, improvements and services:
(A) Transportation facilities, improvements or services that
are funded for construction or implementation in the
Statewide Transportation Improvement Program or a
locally or regionally adopted transportation
improvement program or capital improvement plan or
program of a transportation service provider.
(B) Transportation facilities, improvements or services that
are authorized in a local transportation system plan and
for which a funding plan or mechanism is in place or
approved. These include, but are not limited to,
transportation facilities, improvements or services for
which: transportation systems development charge
revenues are being collected; a local improvement
district or reimbursement district has been established
or will be established prior to development; a
development agreement has been adopted; or conditions
of approval to fund the improvement have been
adopted.
(C) Transportation facilities, improvements or services in a
metropolitan planning organization (MPO) area that
are part of the area's federally-approved, financially
constrained regional transportation system plan.
(D) Improvements to state highways that are included as
planned improvements in a regional or local
transportation system plan or comprehensive plan
when ODOT provides a written statement that the
improvements are reasonably likely to be provided by
the end of the planning period.
(E) Improvements to regional and local roads, streets or
other transportation facilities or services that are
included as planned improvements in a regional or local
transportation system plan or comprehensive plan
when the local government(s) or transportation service
provider(s) responsible for the facility, improvement or
service provides a written statement that the facility,
improvement or service is reasonably likely to be
provided by the end of the planning period.
FINDING: The traffic study identifies impacts to Deschutes Market Road, the
intersection of Deschutes Market Road/Butler Market Road, and the intersection of
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 21
Butler Market Road/271h Street that would reduce the performance of these existing
transportation facilities. The traffic study also identifies a number of mitigation measures
to address these impacts:
A northbound left-turn lane on Deschutes Market Road to the site would meet
City of Bend operational standards for the years 2008 and 2024 for both AM and
PM peak hours.
2. A southbound right-turn lane on Deschutes Market Road at the Butler Market
Road intersection would meet the City of Bend operational standards for 2008.
3. The City of Bend has a long term plan to widen 27th Street to five lanes at the
intersection with Butler Market Road and extend 27th Street north to connect with
Empire Avenue.
As previously detailed, DNF proposes to construct the northbound left-turn lane and pay
the City to construct the southbound right-turn lane.
To address future improvements to the Butler Market Road/27th Street and Butler Market
Road/Deschutes Market Road intersections, the City proposes the following findings (see
January 28, 2011 letter from Mr. Stephens),
The City of Bend's Transportation System Plan (TSP) states that where arterial streets
intersect other arterial streets, traffic signals or roundabouts are to be installed (6.5.2.1).
Deschutes Market Road, Butler Market Road, 27th Street and Empire Street are all
classified as arterial streets in the TSP. The Bend City Council's Transportation
Implementation Plan contains a policy that directs staff to consider roundabouts as the
preferred intersection option. The planned improvement to the Butler Market/27th Street
Intersection is a double-lane roundabout. The planned improvement to the Butler
Market/Deschutes Market intersection is also a roundabout. These two intersections are
under the jurisdictional responsibility of the City of Bend and are included in the City's
TSP as planned facilities.
When the roundabouts described above are constructed, they will operate within the
acceptable level of service with the addition of the trips produced by re-designating and
rezoning the Forest Service site from Urban Area Reserve (UAR) to Public Facilities
(PF). Under Oregon Administrative Rule (OAR) Transportation Planning Rule (TPR)
section 660.012.0060(4)(b)(E) these intersections are considered "planned "facilities
when the jurisdiction responsible for the facilities provides a statement in writing that the
improvements are reasonably likely to be provided by the end of the planning period. On
January 28, 2011 the City of Bend provided a letter to Deschutes County stating that
these facilities are reasonably likely to be provided by the end of the planning period.
The funding to construct these improvements will come from a combination of the
calculated proportionate share payment of $251,100 from the Forest Service to the City
to ameliorate the impacts of their new trips, System Development Charge (SDC)
collections and `proportionate share contributions" from future development authorized
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 22
under Bend Development Code section 4.7.400 C. and 4.7.500 B. which require a
development to pay the incremental cost of the final intersection improvements needed to
accommodate the new trips generated by the development. This payment is made at the
time of site plan review or subdivision approval.
Under ORS 660.012.0060(4)(b)(E), the City of Bend provided a written statement that the
improvements to Deschutes Market Road/Butler Market Road intersection and the 27th
Street/Butler Market Road intersection are reasonably likely to be provided by the end of
the planning period. Therefore, there is no "significant effect" on these facilities under
ORS 660.012.0060(1) and the Transportation Planning Rule is satisfied.
The information in the traffic study and the identified mitigation measures are sufficient
to demonstrate that the requirements of the Transportation Planning Rule are be met.
3. Section 660-024-0000, Purpose and Applicability.
(1) The rules in this division clarify procedures and requirements of
Goal 14 regarding local government adoption or amendment of an
urban growth boundary (UGB).
(3) The rules in this division are effective April 5, 2007, except as follows:
(a) A local government may choose to apply this division prior to
April 5, 2007;
(b) A local government may choose to not apply this division to a
plan amendment concerning the evaluation or amendment of a
UGB, regardless of the date of that amendment, if the local
government initiated the evaluation or amendment of the UGB
prior to April 5, 2007;
FINDING: These rules became effective April 5, 2007. The proposed plan amendment
application for the UGB expansion was submitted on April 7, 2011, therefore, these rules
apply.
4. Section 660-024-0020, Adoption or Amendment of a UGB
(1) All statewide goals and related administrative rules are applicable
when establishing or amending a UGB, except as follows:
(a) The exceptions process in Goal 2 and OAR 660, division 4, is
not applicable unless a local government chooses to take an
exception to a particular goal requirement, for example, as
provided in OAR 660-004-0010(1);
FINDING: The applicant is not seeking any goal exception.
(b) Goals 3 and 4 are not applicable;
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 23
FINDING: Goals 3 and 4 are not applicable.
(c) Goal 5 and related rules under OAR 660, division 23, apply
only in areas added to the UGB, except as required under OAR
660-023-0070 and 660-023-0250;
FINDING: As noted in foregoing findings, there are no Goal 5 resources impacted by
the proposed expansion area.
(d) The transportation planning rule requirements under OAR
660-012-0060 need not be applied to a UGB amendment if the
land added to the UGB is zoned as urbanizable land, either by
retaining the zoning that was assigned prior to inclusion in the
boundary or by assigning interim zoning that does not allow
development that would generate more vehicle trips than
development allowed by the zoning assigned prior to inclusion
in the boundary;
FINDING: As noted in foregoing findings, the 26-acre expansion site is currently zoned
UAR10, and the applicant proposes a zone change to Public Facilities which would allow
more vehicle trips. Staff concluded, and I agree that OAR 660-012-0060 applies and is
satisfied.
(e) Goal 15 is not applicable to land added to the UGB unless the
land is within the Willamette River Greenway Boundary;
FINDING: Goal 15 is not applicable.
(f) Goals 16 to 18 are not applicable to land added to the UGB
unless the land is within a coastal shorelands boundary;
FINDING: Goals 16 and 18 are not applicable.
(g) Goal 19 is not applicable to a UGB amendment.
FINDING: Goal 19 is not applicable.
(2) The UGB and amendments to the UGB must be shown on the City
and County plan and zone maps at a scale sufficient to determine
which particular lots or parcels are included in the UGB. Where a
UGB does not follow lot or parcel lines, the map must provide
sufficient information to determine the precise UGB location.
FINDING: Several maps included in the record illustrate the property to be added. Staff
believes the maps provide sufficient information to determine the precise UGB location.
This criterion is met.
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 24
Section 660-024-0030, Population Forecasts
(1) Counties must adopt and maintain a coordinated 20-year population
forecast for the county and for each urban area within the county
consistent with statutory requirements for such forecasts under ORS
195.025 and 195.036. Cities must adopt a 20-year population forecast
for the urban area consistent with the coordinated county forecast,
except that a metropolitan service district must adopt and maintain a
20-year population forecast for the area within its jurisdiction. In
adopting the coordinated forecast, local governments must follow
applicable procedures and requirements in ORS 197.610 to 197.650
and must provide notice to all other local governments in the county.
The adopted forecast must be included in the comprehensive plan or
in a document referenced by the plan.
FINDING: The County adopted a coordinated population forecast through 2025 on
September 8, 2004 (reference Ordinance 2004-12). The City adopted the same forecast.
These are sufficient to demonstrate compliance with this section.
6. Section 660-024-0040, Land Need
(1) The UGB must be based on the adopted 20-year population forecast
for the urban area described in OAR 660-024-0030, and must provide
for needed housing, employment and other urban uses such as public
facilities, streets and roads, schools, parks and open space over the 20-
year planning period consistent with the land need requirements of
Goal 14 and this rule. The 20-year need determinations are estimates
which, although based on the best available information and
methodologies, should not be held to an unreasonably high level of
precision.
FINDING: The City and County are currently evaluating all of the above-referenced
needs as part of a larger legislative UGB expansion plan. Delays in the legislative UGB
expansion process have necessitated this need-specific UGB expansion request.
As noted previously, the City is concurrently processing a zone change to Public
Facilities (PF). Additionally, one of the stated characteristics in the alternative sites
analysis was that the site must be owned by the Forest Service. None of the five Forest
Service-owned sites which were analyzed is currently zoned PF. The record shows that
there are no existing PF-zoned lands available for the proposed use. Subsection (3) of
this section allows for need-specific UGB expansion.
(2) If the UGB analysis or amendment is conducted as part of a periodic
review work program, the 20-year planning period must commence
on the date initially scheduled for completion of the appropriate work
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 25
task. If the UGB analysis or amendment is conducted as a post-
acknowledgement plan amendment under ORS 197.610 to 197.625,
the 20-year planning period must commence either:
(a) On the date initially scheduled for final adoption of the
amendment specified by the local government in the initial
notice of the amendment required by OAR 660-018-0020; or
(b) If more recent than the date determined in subsection (a), at
the beginning of the 20-year period specified in the coordinated
population forecast for the urban area adopted by the City and
County pursuant to OAR 660-024-0030, unless ORS 197.296
requires a different date for local governments subject to that
statute.
FINDING: In a prior Hearings Officer's decision for a quasi-judicial plan amendment to
expand the City of Bend UGB for a school site (PA-07-5), the Hearings Officer found
that this criterion did not apply because the applicant's proposal was not being requested
as part of periodic review work program. I agree.
(3) A local government may review and amend the UGB in consideration
of one category of land need (for example, housing need) without a
simultaneous review and amendment in consideration of other
categories of land need (for example, employment need).
FINDING: The applicant seeks to amend the UGB for a specific public facility need.
No other needs are under review with this application.
(4) The determination of 20-year residential land needs for an urban area
must be consistent with the adopted 20-year coordinated population
forecast for the urban area, and with the requirements for
determining housing needs in Goal 10, OAR 660, division 7 or 8, and
applicable provisions of ORS 197.295 to 197.314 and 197.475 to
197.490.
FINDING: The proposed expansion is not for residential land needs. This criterion does
not apply.
(5) Except for a metropolitan service district described in ORS
197.015(14), the determination of 20-year employment land need for
an urban area must comply with applicable requirements of Goal 9
and OAR 660, division 9, and must include a determination of the
need for a short-term supply of land for employment uses consistent
with OAR 660-009-0025. Employment land need may be based on an
estimate of job growth over the planning period; local government
must provide a reasonable justification for the job growth estimate
but Goal 14 does not require that job growth estimates necessarily be
proportional to population growth.
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 26
FINDING: The proposed expansion is not for employment land needs. This criterion
does not apply.
(6) The determination of 20-year land needs for transportation and
public facilities for an urban area must comply with applicable
requirements of Goals 11 and 12, rules in OAR 660, divisions 11 and
12, and public facilities requirements in ORS 197.712 and 197.768.
The determination of school facility needs must also comply with ORS
195.110 and 197.296 for local governments specified in those statutes.
FINDING: Consistency with Goals 11 and 12 are adequately addressed in foregoing
findings. ORS 197.712 and 197.768 require an analysis of general public facilities such
as sewer and water to be included in the Comprehensive Plans of cities and counties.
Both the City and County plans include the required analysis.
7. Section 660-024-0050, Land Inventory and Response to Deficiency
(1) When evaluating or amending a UGB, a local
government must inventory land inside the UGB to determine
whether there is adequate development capacity to accommodate 20-
year needs determined in OAR 660-024-0040. For residential land, the
buildable land inventory must include vacant and redevelopable land,
and be conducted in accordance with OAR 660-007-0045 or 660-008-
0010, whichever is applicable, and ORS 197.296 for local governments
subject to that statute. For employment land, the inventory must
include suitable vacant and developed land designated for industrial
or other employment use, and must be conducted in accordance with
OAR 660-009-0015(3).
FINDING: As noted above, the only need being evaluated by this specific UGB
expansion application is the need for public facilities land to allow co-location of
multiple DNF functions. Additionally, the City and County are currently evaluating a
regional UGB expansion which would ensure a 20-year land supply for all other needs.
(5) When land is added to the UGB, the local government must assign
appropriate urban plan designations to the added land, consistent
with the need determination. The local government must also apply
appropriate zoning to the added land consistent with the plan
designation, or may maintain the land as urbanizable land either by
retaining the zoning that was assigned prior to inclusion in the
boundary or by applying other interim zoning that maintains the
land's potential for planned urban development until the land is
rezoned for the planned urban uses. The requirements of ORS
197.296 regarding planning and zoning also apply when local
governments specified in that statute add land to the UGB.
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 27
FINDING: As noted in foregoing findings, the proposed expansion area is currently
zoned Urban Area Reserve, and has a Plan designation of Urban Reserve Area.
Consistent with the specific need to provide land for an expanded public facility, the
applicant is proposing a zone change to Public Facilities and a plan amendment change to
Public Facilities.
8. Section 660-024-0060, Boundary Location Alternatives Analysis
(1) When considering a UGB amendment, a local government must
determine which land to add by evaluating alternative boundary
locations. This determination must be consistent with the priority of
land specified in ORS 197.298 and the boundary location factors of
Goal 14, as follows:
(a) Beginning with the highest priority of land available, a local
government must determine which land in that priority is
suitable to accommodate the need deficiency determined under
660-024-0050.
FINDING: The proposed expansion area is designated as exception land, Urban Area
Reserve. As noted in foregoing findings, although this land is classified as `second
priority', it is the highest priority land available for consideration when expanding the
City of Bend's UGB.
(b) If the amount of suitable land in the first priority category
exceeds the amount necessary to satisfy the need deficiency, a
local government must apply the location factors of Goal 14 to
choose which land in that priority to include in the UGB.
(c) If the amount of suitable land in the first priority category is
not adequate to satisfy the identified need deficiency, a local
government must determine which land in the next priority is
suitable to accommodate the remaining need, and proceed
using the same method specified in subsections (a) and (b) of
this section until the land need is accommodated.
FINDING: As discussed previously, there are no `first priority' lands available. The
subject 26-acre site is considered a second priority land that is of sufficient size to
accommodate the need.
(2) Notwithstanding OAR 660-024-0050(4) and subsection (1)(c) of this
rule, except during periodic review or other legislative review of the
UGB, a local government may approve an application under ORS
197.610 to 197.625 for a UGB amendment proposing to add an
amount of land less than necessary to satisfy the land need deficiency
determined under OAR 660-024-0050(4), provided the amendment
complies with all other applicable requirements.
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 28
FINDING: The proposed expansion is need- and site-specific, and would not satisfy the
20-year land need. As noted in foregoing findings, the City and County are evaluating
the amount of land necessary to satisfy the 20-year land need as part of a regional UGB
expansion.
(3) The boundary location factors of Goal 14 are not independent
criteria. When the factors are applied to compare alternative
boundary locations and to determine the UGB location, a local
government must show that all the factors were considered and
balanced.
FINDING: The boundary location factors of Goal 14 are addressed in foregoing
findings.
(4) In determining alternative land for evaluation under ORS 197.298,
"land adjacent to the UGB" is not limited to those lots or parcels that
abut the UGB, but also includes land in the vicinity of the UGB that
has a reasonable potential to satisfy the identified need deficiency.
FINDING: As identified in the EA, the Forest Service analyzed five Forest Service-
owned sites for the proposed co-location (Bend Pine Work Center, Cascade Lakes, Scott
Street, Knott Road, and China Hat Road). Although the Scott Street site is already within
the City limits, the site is not large enough to accommodate the proposed use. The
remaining four sites are all outside of the Bend UGB, with only the Bend Pine Work
Center abutting the UGB. This criterion is been met.
(5) If a local government has specified characteristics such as parcel size,
topography, or proximity that are necessary for land to be suitable for
an identified need, the local government may limit its consideration to
land that has the specified characteristics when it conducts the
boundary location alternatives analysis and applies ORS 197.298.
FINDING: Previous findings discussed the specific characteristics used to evaluate a
number of alternative sites for the identified need.
(6) The adopted findings for UGB adoption or amendment must describe
or map all of the alternative areas evaluated in the boundary location
alternatives analysis. If the analysis involves more than one parcel or
area within a particular priority category in ORS 197.298 for which
circumstances are the same, these parcels or areas may be considered
and evaluated as a single group.
FINDING: The submitted EA describes and maps all five of the alternative sites.
(7) For purposes of Goal 14 Boundary Location Factor 2, "public
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 29
facilities and services" means water, sanitary sewer, storm water
management, and transportation facilities.
FINDING: Water, sewer, storm water management and transportation facilities are
adequately addressed above in the findings for Goal 14 Boundary Location Factor 2.
(8) The Goal 14 boundary location determination requires evaluation and
comparison of the relative costs, advantages and disadvantages of
alternative UGB expansion areas with respect to the provision of
public facilities and services needed to urbanize alternative boundary
locations. This evaluation and comparison must be conducted in
coordination with service providers, including the Oregon
Department of Transportation with regard to impacts on the state
transportation system. "Coordination" includes timely notice to
service providers and the consideration of evaluation methodologies
recommended by service providers. The evaluation and comparison
must include:
(a) The impacts to existing water, sanitary sewer, storm water and
transportation facilities that serve nearby areas already inside
the UGB;
(b) The capacity of existing public facilities and services to serve
areas already inside the UGB as well as areas proposed for
addition to the UGB; and
FINDING: The application materials include a "will serve" letter from Avion for water
service. The City and DNF have reached an agreement to provide sewer service to the
subject property. The submitted traffic study indicates necessary road improvements to
mitigate expected impacts. Foregoing findings show that DNF will mitigate anticipated
transportation impacts including constructing a northbound left-turn lane on Deschutes
Market Road, paying the City to construct the southbound right-turn lane at Deschutes
Market Road/Butler Market Road, and contributing monies to fund future improvements
at the Butler Market Road/27th Street and Butler Market Road/Deschutes Market Road
intersections. Fire protection service will be provided by the Bend Fire Department, with
police services provided by the City of Bend Police Department. These criterion are met.
(c) The need for new transportation facilities, such as highways
and other roadways, interchanges, arterials and collectors,
additional travel lanes, other major improvements on existing
roadways and, for urban areas of 25,000 or more, the provision
of public transit service.
FINDING: The traffic analysis identifies a number of necessary improvements to
mitigate traffic impacts including:
1. A northbound left-turn lane on Deschutes Market Road to the site will
meet City of Bend operational standards for the years 2008 and 2024 for
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 30
both AM and PM peak hours.
2. A southbound right-turn lane on Deschutes Market Road at the Butler
Market Road intersection will meet the City of Bend operational standards
for 2008.
3. The City of Bend has a long term plan to widen 27th Street to five lanes at
the intersection with Butler Market Road and extend 27th Street north to
connect with Empire Avenue.
As discussed above, DNF will construct the left-turn lane, paying the City to construct
the right-turn lane, contribute monies to fund future improvements at the Butler Market
Road/271h Street and Butler Market Road/Deschutes Market Road intersections. For
these reasons, I find that the necessary transportation facility improvements have been
addressed.
D. Title 19, Bend Urban Growth Boundary Zoning Ordinance
1. Chapter 19.12, Urban Area Reserve Zone.
FINDING: The applicant proposes a zone change from UAR10 to Public Facilities.
2. Section 19.116.010, Amendments.
B. Any proposed quasi-judicial map amendment or change shall be
handled in accordance with the applicable provisions of DCC Title 22.
FINDING: The applicable provisions of Title 22 are addressed below.
3. Section 19.116.020, Standards for Zone Change.
The burden of proof is upon the applicant. The applicant shall in all cases
establish:
A. That the change conforms with the Comprehensive Plan. Specifically,
the change is consistent with the plan's intent to promote an orderly
pattern and sequence of growth.
FINDING: The applicable policies of the Comprehensive Plan regarding urban growth
boundaries and public facilities and services are addressed below. I find that the
information provided in the staff report is substantial evidence that an orderly pattern and
sequence of growth will occur. Specifically, the zone change to Public Facilities will
more accurately reflect the existing and future DNF uses on-site. Additionally, the DNF
project will provide for necessary improvements to City roadway facilities.
B. That the change will not interfere with existing development,
development potential or value of other land in the vicinity of the
proposed action.
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 31
FINDING: The subject property is currently used for a portion of DNF's operations.
While future consolidation of DNF operations could result in an increase in traffic, these
impacts would likely be mitigated via construction and funding of City roadway
improvements. There is no information in the record to suggest that the proposed zone
change will interfere with existing development, development potential, or value of other
land in the vicinity of the proposed action.
C. That the change in classification for the subject property is consistent
with the purpose and intent of the proposed zone classification.
FINDING: As noted above, the current UAR10 zoning does not allow the consolidation
of DNF operations on-site. Staff concluded, and I agree, that the proposed zone change
to Public Facilities will accurately reflect existing and future DNF uses on-site.
D. That the change will result in the orderly and efficient extension or
provision of public services. Also, that the change is consistent with
the County's policy for provision of public facilities.
FINDING: The record includes a "will serve" letter from Avion Water. The City and
DNF have reached an agreement to facilitate connection to City sewer. The subject
property is served by Bend Fire Department and will be served by the City of Bend
Police Department. The specific Comprehensive Plan policies for provision of public
facilities are addressed below.
E. That there is proof of a change of circumstance or a mistake in the
original zoning.
FINDING: The subject property has been in use since the late 1940s by DNF, primarily
as their plant nursery. The nursery use was discontinued in 1999, with DNF warehousing
and other support operations continuing at the site. The close of the nursery use allowed
for other uses and development on the property. As demonstrated in the EA, the Forest
Service has expressed a desire and need to own rather than lease or rent property for their
multiple operations sites, and consolidate operations at a single location. These changes
in circumstance reasonably warrant the proposed zone change.
FINDING: The applicable provisions of Title 22 are addressed below.
E. Title 22, Deschutes County Development Procedures Ordinance
Section 22.28.030, Land Use Action Decisions
Decision on plan amendments and zone changes.
B. In considering all quasi-judicial zone changes and those quasi-judicial
plan amendments on which the Hearings Officer has authority to
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 32
make a decision, the Board of County Commissioners shall, in the
absence of an appeal or review initiated by the Board, adopt the
Hearings Officer's decision. No argument or further testimony will
be taken by the Board.
FINDING: A public hearing before the Hearings Officer was held May 2, 2011.
F. Title 23, the Deschutes County Comprehensive Plan
Section 23.48.030. Urban Growth Boundary Policies.
1. Urbanization. Urbanization policies refer to unincorporated urban
growth areas within an urban growth boundary but outside the
boundaries of a City, and are intended to assist in the decision making
about the conversion of rural to urban uses, and to help in the
development of consistent urban area plan. More detailed policies for
the urban areas of Bend, Redmond and Sisters are specified in the
urban area plans and they shall be the primary documents for
coordination and land use decisions in their respective areas.
b. Urban growth boundaries shall be established or expanded
based upon the following:
1. Demonstrated need to accommodate long-range urban
population growth requirements consistent with LCDC
goals;
2. Need for housing, employment opportunities and
livability;
3. Orderly and economic provision for public facilities and
services;
4. Maximum efficiency of land uses within and on the
fringe of the existing urban area;
5. Environmental, energy, economic and social
consequences;
6. Retention of agricultural land as defined, with Class I
being the highest priority for retention and Class VI the
lowest priority; and,
7. Compatibility of the proposed urban uses with nearby
agricultural activities.
FINDING: These criteria are adequately addressed by the findings for Goal 14 and
related goals, statutes and rules discussed above and I incorporate those findings here by
this reference. Conformance with the Bend Area General Plan is discussed below.
8. Facilities and services.
a. Efforts should be made over a sustained period
of time to place utility lines underground in
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 33
existing and new residential areas.
b. Parks should be located within walking distance
of every dwelling unit in the community. Parks
should be centrally located and easily accessible
to the areas they are intended to serve (see
Recreation).
C. Certain private recreational uses such as golf
courses or riding stables can be successfully
integrated into residential areas provided the
location, design and operation are compatible
with surrounding residential developments.
d. Fire protection in the planning area should be
considered as a common problem by the City,
County, water district and the fire protection
district, and equipment should reflect the
character of land uses in the community.
e. Efforts should be made to encourage Federal
and State agencies to locate in urban areas.
f. Efforts should be made to group public offices in
a more or less common location as a convenience
to the public.
FINDING: Staff concluded, and I agree, that policies 8(a-d) do not apply. If approved,
the UGB expansion will allow the consolidation of multiple Forest Service functions onto
a single location within the Bend UGB.
2. Section 23.68.020, Public Facilities and Services Policies.
1. General.
a. Public facilities and services shall be provided at levels and in
areas appropriate for such uses based upon the carrying
capacity of the land, air and water, as well as the important
distinction that must be made between urban and rural
services. In this way public services may guide development
while remaining in concert with the public's needs.
FINDING: The record includes a "will serve" letter from Avion Water. The City and
DNF have reached an agreement to facilitate connection to City sewer. The subject
property is served by Bend Fire Department and would be served by City of Bend Police
Department. As part of the co-location project, DNF proposes to construct roadway
improvements on Deschutes Market Road and Butler Market Road, and contribute
monies to fund future improvements on Butler Market Road. According to the EA, the
subject property is large enough to accommodate DNF's proposed co-location. Staff
concluded, and I agree, that public facilities and services will be provided at sufficient
levels to serve the DNF project.
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 34
b. While clear distinctions are not always possible between urban
and rural services, those facilities (such as sewage treatment
plants, water systems, schools and fire stations), which are
necessary to service concentrations of people shall be known as
key facilities and shall be located in urban areas or in rural
service centers, if necessary, to meet the needs of existing rural
residents. Key facilities shall be built to encourage urban,
rather than increased rural, residential development. Rural
services such as sheriff's patrol, snowplowing, schools and
school busing shall be kept at levels adequate to meet public
needs but not in excess to encourage additional development.
Rural Service Centers are a logical location for future rural
key facilities so that services may be used and constructed in as
efficient a manner as possible (see Rural Development
Chapter). Key facilities outside urban areas or Rural Service
Centers shall be discouraged unless the facility is needed to
serve existing development, is at the most efficient and
economic location and is consistent with the capabilities of the
land and the planned growth of the County.
FINDING: No key facilities, as defined above, are proposed. This criterion does not
apply.
C. Future development shall depend on the availability of
adequate local services in close proximity to the proposed site.
Higher densities may permit the construction of more adequate
services than might otherwise be true. Cluster and planned
development shall be encouraged.
FINDING: A water pipeline for Avion Water exists within the Deschutes Market Road
right-of-way, allowing for efficient connection. A City sewer pipeline runs along the
southern boundary of the property also allowing for efficient connection. The subject
property is already within the Bend Rural Fire Protection District, allowing for easy
annexation into the Bend (City) Fire Protection District. To the south are residential lots
within the City limits that are currently served by the Bend Police Department. Staff
concluded, and I agree, that the proximity of the subject property to lands already served
by Bend Police would make inclusion of the subject property reasonable.
d. The County shall prepare a Capital Improvements Plan which
considers the costs and benefits of construction at various sites.
Sites which are less expensive in the long run shall be given
priority to less efficient sites.
e. Deschutes County shall encourage the formation of special
service districts to serve rural needs rather than becoming
involved with serving those needs. The County will foster
coordination and mutual planning between the County, special
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 35
districts, utility companies and service corporations. This shall
include common trenching where appropriate.
FINDING: No utilities are proposed. These policies do not apply.
f. Deschutes County shall coordinate with the cities and other
service providers in urban areas to assure that all urban
services are provided in an equitable manner and construction
phased, based upon the time required to provide the service,
the reliability of the service, the financial cost, and the levels of
service needed. All services shall be provided consistent with
the provisions of all other required services.
FINDING: City staff has kept the County apprised of negotiations and agreements with
DNF to provide adequate sewer and transportation facilities. Comments from the Bend
Fire Department are in the record. The record also includes a "will serve" letter from
Avion Water. As part of the concurrent City process, the City has sent notice to the Bend
Police Department. At the time of this staff report, no comments have been received.
g. Because of the increasing cost of development which must be
borne by local residents, the County shall investigate various
methods to control or obtain funds for providing new public
service levels. This investigation is to include review of a
Systems Development Charge. The County shall conduct a
review of systems development charges for areas outside the
urban growth boundary by January 1, 1995.
FINDING: This policy does not apply.
2. Utilities.
a. Utility companies shall be offered an opportunity to comment
on their ability to serve proposed developments.
b. New development shall not be located so as to overload existing
or planned facilities, and developers or purchasers should be
made aware of potentially inadequate power facilities in rural
areas.
C. When feasible all utility lines and facilities shall be located on
or adjacent to existing public or private rights-of-way so as to
avoid dividing existing farm units, and transmission lines
should be located within existing corridors as much as possible.
d. Power generation sites shall be landscaped and the site plan
reviewed as part of the conditional use applications.
e. Electrical substations shall be a permitted use in all
appropriate zones with final approval based upon County
Planning Department acceptance of a detailed site plan.
Minimum lot sizes shall not apply to substations, but adequate
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 36
area for equipment, storage, buffer and potential expansion
shall be required.
f. All new development shall be consistent with adopted sewage
plans, and new community systems in urban areas shall be
designed to fit into the municipal system. Also, in urban areas,
where connection to a sewer system is not appropriate now but
will be required in the future, dry sewer lines may be required
for future use (this does not apply in larger lot subdivisions
where no future sewers are anticipated).
FINDING: No new development or utility facilities are included as part of the
applications. These policies do not apply.
g. Mutual agreements between the County and the cities shall
assure sewer and water systems are extended in a planned
manner.
FINDING: As noted previously, the City and DNF have reached an agreement for
connection to City sewer service. Additionally, Avion Water has indicated an ability to
serve the property.
h. Sewage treatment plants offer both problems and
opportunities. To decrease the impact of noise and odor a
large buffer area shall be required. The treated sewage (both
septic tank sludge and municipal water) should be used as a
resource and drill hole disposal discouraged.
i. Well marked recreational vehicle dump stations are needed
locally and the County shall encourage such facilities in parks,
service stations and other appropriate locations.
FINDING: No new development or utility facilities are included as part of the
applications. These policies do not apply.
The capability for County land to be annexed into a city shall
depend upon the availability of adequate services, such as
water.
FINDING: As detailed in the foregoing findings, adequate public services are available.
k. Metering of existing and future water systems shall be fostered.
1. Oregon Water Wonderland Unit 2 Sewer District. Through
County file nos. PA-02-5 and ZC-02-3, the Board of County
Commissioners approved a zone change for certain property in
Section 25 of Township 20 South, Range 10 E.W.M. to Rural
Residential with a Limited Use Combining Zone. The Board
adopted the Limited Use Combining Zone to limit the uses that
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 37
could be established on the subject property to those approved
through its written decision dated March 28, 2003 and listed as
follows: a sewage treatment facility, effluent ponds, ground
application of treated effluent, agricultural use, and
propagation and harvesting of a forest product.
FINDING: These policies do not apply.
G. Bend Area General Plan
1. Preface to the Bend Area General Plan
Format of the Plan
At the end of each chapter are policies that address issues discussed in the
chapter. The policies in the General Plan are statements of public policy,
and are used to evaluate any proposed changes to the General Plan. Often
these statements are expressed in mandatory fashion using the word "shall".
These statements of policy shall be interpreted to recognize that the actual
implementation of the policies will be accomplished by land use regulations
such as the city's zoning ordinance, subdivision ordinance and the like...
FINDING: Based on the above language, it is not necessary to analyze specific Bend
Area General Plan policies because those policies are implemented by the City of Bend's
zoning ordinance.
IV. CONCLUSION AND RECOMMENDATION:
Based on the record and the Findings of Fact and Conclusions of Law set forth
above, I find that the proposal complies with the applicable Statewide Planning Goals,
Oregon Revised Statutes, Oregon Administrative Rules, the Bend Area General Plan, and
the Deschutes County Zoning Ordinance and Comprehensive Plan.
Kenneth D. Helm, Hearings Officer
A DECISION BY THE HEARINGS OFFICER BECOMES FINAL TWELVE (12)
DAYS AFTER THE DATE OF MAILING, UNLESS APPEALED BY A PARTY
OF INTEREST.
Dated this 23th day of May, 2011
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 38
Mailed this day of May, 2011
PA-11-1, ZC-10-1, MA-11-3
Deschutes National Forest 39