Loading...
2011-2846-Minutes for Meeting June 01,2011 Recorded 6/17/2011COUNTY OFFICIAL PI NANCYUBLANKENSHIP, COUNTY CLERKDS yu 2011.2846 COMMISSIONERS' JOURNAL 06/17/201108:09:49 AM 11111111111)111111111111111111 20112Do not remove this page from original document. Deschutes County Clerk Certificate Page Deschutes County Board of Commissioners 1300 NW Wall St., Suite 200, Bend, OR 97701-1960 (541) 388-6570 - Fax (541) 385-3202 - www.deschutes.ora MINUTES OF WORK SESSION DESCHUTES COUNTY BOARD OF COMMISSIONERS WEDNESDAY, JUNE 19 2011 Present were Commissioners Alan Unger and Anthony DeBone; Commissioner Tammy Baney had to leave the office. Also present were Dave Kanner, County Administrator; Erik Kropp, Deputy County Administrator; and, for a portion of the meeting, Joe Studer, County Forester; Laurie Craghead, County Counsel; Dan Sherwin, Road Department; and Teresa Rozic, Property & Facilities. Also present were approximately 25 other citizens, including COCC Forestry students, instructors; representatives of the Oregon Department of Forestry, the BLM, the Oregon Department of Fish & Wildlife and the Deschutes National Forest; and a few individuals who live in the area near a property to be discussed. Vice Chair DeBone opened the meeting at 1:50 p.m. 1. Capstone Presentation. Joe Studer gave an overview of the history of the program, which has been very beneficial to the County. The most recent project was related to County-owned property located off Rickard Road southeast of Bend. The various students gave an overview of the program. The objective was to write a management plan for this property. (A PowerPoint presentation was given, and a copy is attached for reference) They spoke about the soils on the property. There are three types common in the region that are susceptible to erosion and drain easily. Minutes of Board of Commissioners' Work Session Wednesday, June 1, 2011 Page 1 of 6 Pages Discussion occurred regarding the Oregon Watershed Enhancement Board, which helps to classify Juniper encroachment. This has happened primarily because of overgrazing and the suppression of natural fire. The area is subject to some invasive species. The students presented information on cruise methods to determine the types of vegetation in the area. It is felt that the high density of young juniper will out- compete other vegetation at some point. Discussion took place about fire ecology, which is high to extreme. The lack of fire has impacted the natural vegetation. Homeowner education is recommended so people will know how to create defensible space and deal with the high potential of wildfire. Some road closures were recommended on the north, west and south sides to protect sensitive areas. A wildlife overview was then given. Historically, pronghorn and bats have occupied the area, but not recently. Juniper uses the available groundwater, which impacts other native species of vegetation, and that affects the wildlife. There is no natural water source. Irrigation canals provide water part of the time, and so do guzzlers that hold and distribute rainwater. One of the students talked about the pathogens that impact Juniper forests. An overview was provided regarding recreation on the property. Some human activities have had a negative impact. Road closures would benefit the land and wildlife and would improve the outdoor experience for users. Designated areas are suggested for various activities. Biomass opportunities were discussed, as were the pros and cons of trying to use the vegetation for biomass. It is not likely to be viable for carbon credits because there is just not enough of it available. Five points were established for monitoring purposes. The recommended treatment options are road closures; and potentially various levels of thinning Juniper. Minutes of Board of Commissioners' Work Session Wednesday, June 1, 2011 Page 2 of 6 Pages Discussion occurred regarding the costs to maintain the property if uses are restricted or roads are closed. Law enforcement would be a factor. Commissioner Unger asked if the water problem is the permeability of the soil due to its origin, or if it is because Junipers can use so much. The reply was that Juniper will go a long way to get to water, so it uses what other vegetation needs as well. Ponderosa pine does not do well there due to the lack of water, competition for existing water and nutrients, and perhaps a change in weather patterns. It does not appear that there has historically been a pine forest in that area. Dave Kanner asked if it is economically viable to use some of the Juniper for biomass, in order to offset other costs. He was advised that economic viability means breaking even or making a profit, and there is not enough potential for that at this time. Mr. Kanner asked if grasses would survive beyond the first year without help. He was told that some native grasses could survive if they were not out- competed by Juniper. Discussion occurred regarding the options and the cost to reseed the area. It was pointed out that if there is no reseeding done, the native grasses may never come back. If biomass work is done or the land is disturbed in other ways, reseeding is needed to preclude invasive species from taking over. A no-tilling method is preferred. The property is zoned for winter deer range, and there is some evidence of that activity. However, there is a distinct absence of fine vegetation. At least 20% of the soil is bare. If Juniper and bitterbrush was removed, some grasses might do better. Fire could be used but the continuity of the shrubs and vegetation would preclude its spread enough to be effective. There are some slash piles in the area now, but they have been left for wildlife habitat. Fire may have not played a significant role in the past. However, there is some growth on private lands nearby and fire could spread to or from there. It was pointed out that most of the neighbors like the wildlife environment as it is now. Minutes of Board of Commissioners' Work Session Wednesday, June 1, 2011 Page 3 of 6 Pages 2. Discussion of Deschutes National Forest Urban Growth Boundary Expansion Application. Nick Lelack said this application has to do with the Deschutes National Forest building its new headquarters in an urban reserve area. The comprehensive plan shows the land as an urban reserve area, and the zoning is urban area reserve. This would need to change to public facilities. This is previously part of the Pine Nursery property. Work on this process has taken a couple of years. A joint management agreement with the City of Bend was adopted in 1998 relating to urban reserve areas outside the UGB. The County maintains land use control. Key issues have been transportation and effluent disposal. Transportation has been fully resolved through an agreement with the City and the National Forest. This also addresses in part the County's transportation issues on Deschutes Market Road. Effluent disposal is another issue. The property cannot be hooked up to the current City system unless it is part of the City. Commissioner Unger said there is no tax benefit to annexing it. Laurie Craghead said that the Board has no option other than allowing annexation unless the County initiates a review before Monday. Mr. Lelack said the U.S. Forest Service is fine with the annexation, as their end goal is to hook into the City system as soon as possible. There were hearings to address these issues and others, and all have been resolved. All requests were approved. The Board can initiate review and call it up for a hearing or, per Code, let the Hearings Officer's decision stand. Ordinances to affirm this action would be presented to the Board. No testimony from citizens has been offered. The City of Bend will consider the first reading tonight of the annexation documents. Staff requests the Board adopt the Ordinances on June 22 by emergency. The effective date would be on July 15 through the City. The building could get a certificate of occupancy and things would open as scheduled. If it is not adopted by emergency, it would be several months before this could happen. Minutes of Board of Commissioners' Work Session Wednesday, June 1, 2011 Page 4 of 6 Pages Commissioner Unger is supportive of this path. Commissioner DeBone asked if anything further has been developed by the Park & Rec District on their property. He was advised that they own the property separately and are not involved in this particular issue. Commissioners Unger and Debone said staff should proceed. 3. Update of Commissioners' Meetings and Schedules. Commissioner Unger asked about attendance at the LIGI luncheon, as he has a conflicting event. Dave Kanner said in the past the Commissioners have not regularly attended these events. Commissioner Unger plans to attend the Children & Families' Commission meeting tomorrow. Mr. Kanner said that this group is seeking County support and the Commissioners need to be cautious about making any commitments. It is possible the legislature may dissolve the Commission on Children & Families as now structured at the State level, and programs and funding would be disbursed by the Governor's new Early Learning Council. He added that the County could continue the CFC locally, but that takes funding. He would rather see grant-funded programs continue through Health Services or Juvenile Community Justice instead, for as long as the programs are viable. He feels this is a more cost-effective approach. 4. Other Items. None were discussed. The meeting ended at 4:20 p.m. Minutes of Board of Commissioners' Work Session Wednesday, June 1, 2011 Page 5 of 6 Pages DATED this Day of qt~,4-~_ 2011 for the Deschutes County Board of Commissioner. Tammy Baney, Chair Anthony DeBone, Vice hair ATTEST: A- -2 Alan Unger, Commissioner Recording Secretary Minutes of Board of Commissioners' Work Session Wednesday, June 1, 2011 Page 6 of 6 Pages Deschutes County Board of Commissioners 1300 NW Wall St., Suite 200, Bend, OR 97701-1960 (541) 388-6570 - Fax (541) 385-3202 - www.deschutes.ors? WORK SESSION AGENDA DESCHUTES COUNTY BOARD OF COMMISSIONERS WEDNESDAY, JUNE 19 2011 1. Capstone Presentation - Joe Studer & COCC Students 2. Discussion of Deschutes National Forest Urban Growth Boundary Expansion Application 3. Update of Commissioners' Meetings and Schedules 4. Other Items PLEASE NOTE: At any time during this meeting, an executive session could be called to address issues relating to ORS 192.660(2) (e), real property negotiations; ORS 192.660(2) (h), litigation; ORS 192.660(2)(d), labor negotiations; or ORS 192.660(2) (b), personnel issues. Meeting dates, times and discussion items are subject to change. All meetings are conducted in the Board of Commissioners' meeting rooms at 1300 NW Wall St., Bend, unless otherwise indicated. Ifyou have questions regarding a meeting, please call 388-6572. Deschutes County meeting locations are wheelchair accessible. Deschutes County provides reasonable accommodations for persons with disabilities. For deaf, hearing impaired or speech disabled, dial 7-1-1 to access the state transfer relay service for TTY. Please call (541) 388-6571 regarding alternative formats or for further information. It JO t ~ t 4 2 rt1 ~ , n- N ~ 3121 Q) U5 N %A Its- Z Z -0 V `mil ~ 4+ ~ 4 1 ~ V V vJ ~ Vt r!► -23 Q Y 41 C J cy" S to y Y Q ~ C N v O o s o C ~ OJ ~ H 0 ~ . 7 ^ V M So d M m ~ M f®, ~ Q V-i N H 9 ^r t~`~ f ~ ~ 3 0 0 V d c> v I O N cn C L o a ~vT ES C G p 2{ Deschutes County Board of Commissioners 1300 NW Wall St., Suite 200, Bend, OR 97701-1960 (541) 388-6570 - Fax (541) 385-3202 - www.deschutes.org AGENDA REQUEST & STAFF REPORT For Board WORK SESSION of June 1, 2011 Please see directions for completing this document on the next page. DATE: May 18, 2011 FROM: Joe Studer Forestry 322-7117 TITLE OF AGENDA ITEM: Consideration of the BOCC of the Land Management Plan for the County owned lands along Rickard Road, east of Bend. PUBLIC HEARING ON THIS DATE? No. BACKGROUND AND POLICY IMPLICATIONS: Deschutes County and Central Oregon Community College have an existing Memorandum of Understanding which provides the learning opportunity for students to untilize County owned lands to both apply and practice forestry and natural resources skills. In the past five years, students from the Capstone Class have development land management plans for larger contiguous sections of land which have provided valuable alternatives and actions for future land management decisions and management of those County owned lands. For 2011, the students have prepared a land management plan for approximately 720 acres of County owned lands located approximately five miles east of Bend and north of Rickard Road. The students will present the plan, along with recommendations and alternatives to the Board and other departments within the County. FISCAL IMPLICATIONS: None. RECOMMENDATION & ACTION REOUESTED: Consider the proposal and after questions, recommend approval of the plan. ATTENDANCE: The 2011 Capstone Class from COCC, advisors, college officials and other department personnel from Deschutes County. DISTRIBUTION OF DOCUMENTS: Copies will be distributed by the Capstone Class at the conclusion of the presentation. CLI You are invited to Attend The 2011 Forestry Program Capstone Class Presentation Rickard Road Management Plan Wednesday, June 1 1:00-2:00 PM Deschutes County Administrative Offices 1300 NW Wall Street Bend RSVP to Theo tgiannioses@cocc.edu Faculty Contact: Mick Sears mgsears@cocc.edu Student Contact: forestrycapstone2011Ca gmail.com 2011 Capstone Class Rickard Road Property Management Plan `1, K t M1 . 1( t yr V t ~:yF~xyA yr a.r~ 4 At'Chad Elwess, Ryan Jenkins, Luke Lassell, Shawn Maurer, Chris Monda, Justin Osborn, Tom Oswald, Sean Schroeder, - & Brandon Zgraggen Forest Resources Technology Central Oregon Community College 1 Table of Contents 1. OBJECTIVE 3 II. SITE DESCRIPTION 3 III. SITE HISTORY AND CURRENT CONDITION 5 IV. SOIL TYPES AND CONCERNS 5 V. STAND INVENTORY 6 VI. UNDERSTORY VEGETATION 7 VII. WILDFIRE AND WILDLAND URBAN INTERFACE 7 VIII. WILDLIFE 8 IX. WATER RESOURCES 9 X. RECREATION MANAGEMENT 10 X1. NOXIOUS WEEDS 11 XII. ENTOMOLOGY AND PATHOLOGY 11 XIII. CARBON CREDITS 12 XIV. BIOMASS 12 XV. MONITORING 13 XVI. TREATMENT OPTIONS 14 XVII. RECOMMENDATION 18 XVIII. CRUISE AND DATA COLLECTION. PROTOCOL 19 XIX. APPENDIX 21 XX. REFERENCES 31 XXI. CONTACTS 32 2 I. Objective: The objective for the 2011 Forest Resource Capstone class was to develop a land use and management plan for the 715.9 acre Rickard Road property. The property is owned by Deschutes County and is managed as public land. After our research and data collections were complete, the following land use plan was developed. II. Site Description: The Rickard Road property is located approximately four miles East of Bend, Oregon near the corner of Highway 20 and Rickard Road. The property is divided into four tax lots, which are zoned as EFUAL (exclusive farm use- alfalfa subzone). The tax lot numbers, areas, and public land survey description are as follows (Zoning information: Deschutes County code): Tax Lot Public Land Survey Description: Area (acres 1: 1813000004503 N. 1/2, SE.1/4, Sec. 15, T. 18e R. 13s Sec. 15 WBM 77.68 1813000004500 NE.1/4, Sec. 15 160.68 1813000004600 W.1/2, Sec. 15 316.33 1813100001100 S.1/2, SW. 1/4; NE.1/4, SW. 1/4; SW. 1/4, SE.1/4, Sec. 10 160.58 Under Chapter 11.04.020 the Rickard Road property is classified as "Vacant county land". According to Deschutes County Code (Chapter 11.04) the following land use regulations have been put into effect for areas classified as public land (Teresa Rozic, Des. Co. Land Spec., pers. comm.) The intent of these regulations is to protect public property from degradation and vandalism. 1. Public use of County owned property will be limited to day use only. 2. No person shall damage, litter, burn, remove material, or cause any other site damage to County owned property without obtaining written permission. 3. Motor vehicle travel shall be limited to existing parking lots and roads. 4. No person or group shall exclude any other member of the public from County,owned property. 5. Any County owned property may be posted closed by the County Property and Real Estate Manager. 6. All other uses of County owned property are permitted outright. ' The property adjoins to private property on the North, West, and South sides and to BLM managed land on the East side. There are a total of 11.9 miles of primitive roads on the property as well as several access points to enter the property, which include both foot trails and two-track roads. The primary access points to the property are located on the south L end of property off Rickard Road; there is also one access point off of Ward Road which runs through the property and joins Highway 20. The site is characterized by rolling terrain with rocky outcroppings. The plant community is dominated by western juniper (Juniperus occidentalis); there was a small amount of ponderosa pine (Pinus ponderosa) regeneration observed but we do not believe that it can compete with the western juniper on this site. The shrub component is ' composed mainly of big sagebrush (Artemisia tridentata) with some integration of antelope bitterbrush (Purshia tridentata). Native grasses such as Idaho fescue (Festuca idahoensis), squirreltail (Elymus elymoides), crested wheatgrass (Agropyrum cristatum), and bluebunch ' wheatgrass (Agropyrum spicatum) were also observed growing throughout the site. :t HS Iy AT Mx«i~~.n _ RKktsx7 -r: t` ,Ritlru~raq a p~ _'<et SC4.. 4 d III. Site History & Current Condition: Western juniper is a tree species which is native to Central Oregon. It has grown on the site for over three hundred years; however, historical densities do not match current densities. Historically, juniper stands in the area have formed what are now known as juniper savanna (Gedney, 1999). Due to fire suppression and a lack of stand management, the stand has increased in density to a juniper forest. A juniper stand on a regular fire return interval would consist of old growth trees in a mosaic pattern and a small amount of regeneration (Tom Andrade, ODF, pers. comm.). This site has historically been used by the public as a place for recreation (Rozic, pers. comm.). Known activities on the site include horseback riding, hiking, hunting, shooting, wildlife viewing, and a small amount of off-road vehicle use. There has been a small amount of I 1 i u garbage dumping observed throughout the site, but degradation to the site from these types of activities is minimal and can be mitigated with a site clean-up and the closure of roads. The road density on the site is high- approximately 10.8 miles of road per square mile. Circumstances such as these can have an adverse affect on wildlife populations (Larry Pacenka, O.D.F.W., pers. comm.), such as promotion of noxious weed growth, and can lead to excessive soil compaction. It is recommended that the density of roads on the site be reduced to two miles of road per square mile of area (Pacenka, pers. comm.). This recommendation would involve closing approximately ten miles of roads on the site. However, this will help to reduce dumping and further site degradation. It will also promote wildlife and overall stand health. IV. Soil Types & Concerns: The following information was collected from a publication survey conducted and authorized by the United States Department of Agriculture (USDA) and the National Research Conservation Service (NRCS). According to the survey, the Rickard Road property is composed of three soil types: Gosney-rock with Deskamp outcroppings on a slope of 0-5 percent, Gosney-rock with Deskamp outcroppings on a slope of 5-15 percent, and Deskamp loamy sand. (Refer to soils map on page 19.) Approximately 78 percent or 558 acres of the property consists of Gosney-rock soil with Deskamp outcroppings on a slope of 0-5 percent. ' This soil was formed from ash and is common in this region. The typical soil profile is composed of two sub-surface horizons: the top 15 centimeters consists of course sand integrated with pieces of gravel, while the distance between 15-30 centimeters is formed by pale brown loamy sand. The pH level in this soil ranges from 6.8 to 7.3. Native plants found in this soil type are western juniper, bitterbrush, big sage, Idaho fescue, and bluebunch wheatgrass. This soil type is known for having a rapid permeability, meaning it is quickly drained of water. This soil type ' is also highly susceptible to wind erosion and to compaction. Low soil fertility and cold, dry weather limit the potential for agricultural crops. Due to the susceptibility for compaction, it is recommended that large livestock be kept off this soil type. If the harvesting of timber takes place on the site, the use of skid trails is highly recommended. It is also recommended that native grass seed be scattered throughout the site to further prevent wind erosion to the soil. Approximately 15 percent or 109 acres of the property is composed of Gosney-rock with Deskamp outcroppings on slopes of 5-15 percent slope. This soil type is located on the north side of the property and has the same characteristics and properties as the above soil type. ' Approximately 7 percent or 50 acres of the property consists of Deskamp loamy sand. This soil is also formed from ash. It is brown in color and tends to have a pH of 7.0, which is neutral. This soil has a rapid permeability, but has a low susceptibility to compaction when used for recreation sites such as camping areas. V. Stand Inventory: All trees sampled during our cruise of the property were western juniper. According to our cruise data there is an average of 43 trees per acre and 31 sapling or seedlings (trees less than 4 inches DBH) per acre across the 715 acres. The basal area of these trees averages to be 58.7. square ft. per acre with a 95% confidence interval of ± 1.6 square feet of basal area. The volume per acre is estimated to be 483 cubic feet with a total stand volume of 345,582 cubic ft. Under a 95% confidence interval our volume prediction can potentially vary by ±50,793 cubic ft. over the entire 715 acres. ' The oldest tree sampled in our cruise was 263 years old and the average age of sampled trees was 166 years old. The average ten-year growth increment of the stand is 0.31 inches. Currently, the Central 11 Oregon Community College (COCC) capstone class has not been able to find any literature that discusses site class on western juniper, so site class and index were not calculated for this site. The COCC capstone class used characteristics such as lichen growth, visible rot, conks, and wildlife nests to classify old growth trees in the stand. It was found that the majority of the trees over 21 inches DBH exhibited these features, so we used this size class to separated old ' growth trees from regeneration. (Refer to cruise calculations in appendix.) VI. Understory Vegetation: ' The shrub and ground cover on the site is composed of big sagebrush, antelope bitterbrush, yellow rabbitbrush (Chrysothamnus uiscidiflorus), and rubber rabbitbrush (Chrysothamnus nauseosus). Much of the understory is composed of mature shrubs with at least 20 percent of their mass comprised of dead material. These large shrub species ' occupy approximately 145 acres of the property, or 20 percent of the total ground cover. ' Approximately 67 acres or nine percent of the property is occupied by native grasses and forbs, including Idaho fescue, squirreltail, bluebunch wheatgrass, and sand lily (Leucocrinum spp.). These are ' valuable forage for wildlife, as well as a desirable seed source for post- activity reclamation of the site. Due to the low amount of annual rainfall on the site, approximately 20 percent of surface soil is unoccupied by vegetation. With proper action taken to free-up available soil water, it is believed that the percentage of desirable ground cover could be increased. (OWEB Phase II Monitoring Report, 2007) w VII. Wildland Fire & Wildland Urban Interface (W.U.I.) Recommendations: The Rickard Road property falls under the 2006 Greater Bend Community Wildfire Protection Plan. Due to the proximity of homes to the site, an ODF assessment of risk was utilized to evaluate wildfire concerns. Managing the area along Rickard Road and the areas adjoining to private property should be a priority. (The following ratings and 7 n 11 conditions were collected from the 2006 Greater Bend Community Wildfire Protection Plan.) Ratings & Conditions of Interest: • ODF Hazard Rating of 76 (extreme) • ODF likelihood of fire occurring of 35 (high) • The fire return interval for western juniper woodlands is every 25 - 35. • This property is Fire Regime Group 2 with a fire frequency of 25-35 years • This property is a condition class 2 (missed more than one fire return interval) • Western juniper woodland fire return interval for this site is approximately every 31 years Rickard Road Property Wildfire & W.U.I. Recommendations: 1 • Homeowner Education- to provide information to adjacent landowners on the importance of defensible space (defensible space checklist) • Create and maintain a fire resistant buffer along Rickard Road, as well as the North, West, and South boundaries of the property. • Proposed thinning of western juniper ' • Materials should be piles to add cover for wildlife or hauled off the site and used as biomass I VIII. Wildlife: There have been several mammal and avian species observed on the site which include mule deer (Odocoileus hemionus), elk (Ceruus elaphus), deer mice (Peromyscus maniculatus) , bushy-tailed woodrats (Neotoma cinerea), black-tailed jackrabbits (Lepus californicus), cottontail rabbits (Syuilagus spp.), pinyon jays (Gymnorhinus cyanocepholus), western bluebirds (Sialia mexicana), northern flickers (Colaptes auratus), California quail (Callipepla californica), barn owls (Tyto alba), great- horned owls (Bubo uirginianus), red-tailed hawks (Buteo jamaicensis), ravens (Coruus corax), sage thrashers (Oreoscoptes montanus), and migrating bald eagles (Haliaeetus leucocephalus). Historically the pronghorn antelope (Antilocapra americana) and resident bat (Molossidae and Vespertilionidae families) populations were found on the site (Bret Michalski, COCC Biologist, pers.comm), but these species have not been observed on the site. 1 l "In most cases, juniper habitat supports greater populations of wildlife than any other habitat type in Eastern Oregon. Approximately 83 avian species and 23 mammal species use juniper woodland habitat in Oregon. The areas which receive the most attention from wildlife are old decadent trees and rocky outcropping. Protection of these habitat features is crucial to healthy wildlife populations" (Gedney, 1999). The current state of the western juniper on the site provides valuable aspects to many species of wildlife- but proper management can promote improved wildlife capabilities. The increase in juniper density has excluded the regeneration of grasses and forbs. "An old growth stand of juniper provides the greatest value to wildlife; thinning is recommended to decrease the density of young juniper. This will provide space and water to encourage the growth of grasses and forbs" (Pacenka, pers. comm. An increase in grasses and forbs would add forage for wildlife and insects. Increase in insect populations would benefit many small mammals, bats, and avian species on the site. If the juniper in this stand is allowed to increase in density, the benefits to wildlife will decrease. "A stand composed only of western juniper has lost a tremendous amount of value to wildlife. As a stand of juniper ages and increases in density, the juniper will successfully out- compete native shrubs, grasses, and forbs through moisture extinction" (Pacenka, pers. comm). This habitat can be improved by implementing a thinning of the younger juniper, which has been classified as a tree which is less than 21 inches in diameter. This will ultimately increase water availability and free-up space for native grasses and forbs, which are essential as forage for wildlife. It is recommended that a water impoundment device and nest boxes be added to the site (Pacenka, pers. comm. Adding nest boxes to the site will increase cover for resident and migrating avian species. Since water is a limiting factor on the site, a water impoundment device will increase water availability to all wildlife species. IX. Water Resources: The stand receives an average of 8 inches of precipitation per year and nearly all of that moisture comes in the form of snow during the winter months. The early to mid-successional western juniper component takes up the majority of the surface area, as well as available surface water on the property. Research has shown that as juniper ages, it develops a fine root system in the upper 30 inches of the soil profile, which can extend laterally as much as three times the height of the tree. "Juniper trees can produce photosynthesis very early in the spring before other plants begin to grow. On a warm April day an 18 inch juniper tree can transpire 20 gallons of water per day; in mid-summer that same tree can transpire up to 40 gallons of water per day. (1993, Bedell) Currently there is no source of free water on the site. The closest source of free water is an irrigation canal, which is located on an adjacent property to the North and only flows for a portion of the year. It is recommended that a water impoundment device (guzzler) be added to the South end of the site; which would increase the water availability and diversity of wildlife. X. Recreation Management: Currently, recreation use on the property consists of target shooting, off-highway vehicle (OHV) use, horseback riding, hiking, wildlife viewing, campfires, and woodcutting. Based on our observations, ' there are currently 2-5 persons at one time (PAOT) recreating on the property. There are signs of illegal trash dumping, which are most prevalent on the South end of the property, near Rickard Road. Some of the current recreation activities that are occurring on the property are having adverse affects on the land. Many unnecessary roads have been created by recreational use. Disturbance along these roads and trails allows for the encroachment of noxious weeds and high levels of compaction. Presently, there are 11.9 miles of roads, and the continuation of the fore-mentioned activities will exacerbate this problem. Campsites and campfires are a concern due to the dry conditions of the site and its close proximity to residential properties. Campsites and dispersed camping are known to cause severe compaction to this soil type. According to a soil survey performed and reported by the USDA and NRCS, it is recommended that camping and picnic areas be ' exempt from this site. To reduce further degradation of the site it is also recommended j that recreation be limited to non-motorized vehicle types. Road closures along Rickard Road will be beneficial to deter illegal dumping on the South end of the property. A parking area on the South end of the property could provide access for wildlife viewing and hiking use, as well as a place to post signs to inform the public of legal uses and dangers. If motorized use is allowed to continue on the site it is recommended that existing roads and trails be posted with instructions to remain on roads and trail systems only. ' 10 : XI. Noxious Weeds There is presence of both invasive and noxious weeds on site. Limited populations of Russian thistle (Echinops exaltatus) and cheatgrass (Bromus tectoruN exist along roadways throughout the property. On the Northeast boundary, there are occasional patches of woolly mullein (Verbascum thapsus). Total percentage of undesirable plant species on site is less than 3 percent and not deemed to be a 1 particular threat to the populations of native grasses and forbs on site (Dan Sherwin, Des. County, pers. comm). Where these species do exist, individual spraying or burning is recommended, followed by a no-till seeding of native species. The key weed control strategy for this particular property would be to limit introduction of seed sources to un-invaded areas. This includes closing roads to OHV use, where mechanical treatment of western juniper is implemented. It also requires that equipment is washed and inspected before being transported onto the site. XII. Entomology & Pathology: There are several pathogens present at the Rickard Road site. The pathogens present affect not only the volume of the stand, but also the health and condition of the stand. Of these pathogens, juniper pocket 1 rot, brown cubical butt rot, juniper mistletoe, and juniper broom rust are most prevalent. Brown cubical butt rot (Phaeolus schweinitzio is a conk normally found on the base of the tree bole or arising from the roots. The presence of conks usually indicates severe decay in the bole and limbs. The fungus t extends up to 20 feet into the stem, making the heartwood yellow and crumbly. The spores enter trees through wounds such as fire scars and broken limbs, or by spreading between root systems. The fungus may persist for years after a tree is dead, and continue to infect other trees (Bega, 1978). Juniper pocket rot (Fomes juniperinus) conks are normally found on the bottom 4 feet of the tree's bole. It attacks heartwood and dead sapwood creating stringy, hollow pockets, which compromise the structural integrity of the trees, sometimes causing mortality. This fungus also enters its hosts through wounds caused by limb breakage or fire (Nevada Forestry Division, 2008). 11 1 1 ~J I t Juniper broom rust (Gymnosporangium nidus-avis) is normally found in the branches and twigs of the trees, and is evident as rounded clumps of foliage throughout the canopy. The fungus forms an orange- brown telium, which causes limbs to swell, cracking the bark and killing the cambium (Hagle, 2010). Juniper mistletoe (Phoradendron juniperinum) is a parasitic, flowering plant that is embedded in the limbs of infected trees. It manifests as yellow to olive green globe-like clusters of foliage and may have pink to whitish berries present. It robs the host of water and nutrients, causing foliage to die off, but rarely killing the tree. The spores are then dispersed by wind. The fungi mentioned are best managed by avoiding injury to the trees or by removing infected individual trees. The only treatment option for mistletoe is to either prune the infected trees or remove them (Hagle, 2010). XIII. Carbon Credits: Carbon credits have been increasing in quantity among companies with high carbon emissions. These companies are buying or leasing land with trees and other plant materials which aid in carbon storage to offset their emissions. One carbon credit is classified as one ton of stored carbon. The price of carbon credits fluctuates with demand, but has averaged $3.26 per ton in 2010 (Chicago Climate Exchange). Although there is potential for carbon credits, the majority of the market relates to stand types composed largely of commercial tree species. There are also incentives in urban areas where trees create shade to reduce the amount of energy needed to cool buildings. Neither of these stipulations applies to the property. 1 XIV. Biomass: r Juniper is not a traditional biomass-producing tree; however new technology and need for juniper eradication is pushing the industry in this direction. "Currently Northern California is ahead of the juniper biomass curve. According to studies there are several issues surrounding potential juniper biomass extraction in Central Oregon (Steve Lawn, T2 12 Inc., pers.comm)." For example, juniper bark is very hairy and causes chipped biomass to be stringy; this becomes an issue when applied to the biomass extraction of plants because they are used to dry dimensional chips. Currently there are no biomass facilities in operation on the East side of the Cascades resulting in high transportation costs (loaded biomass trucks must travel to Western Oregon). With the completion of the planned biomass facility on the Warm Springs Indian Reservation, the price of transportation would be reduced dramatically and more juniper biomass operations may be feasible. Due to habitat restoration and fire suppression goals, the potential for biomass on this site is large. However, based on volume estimations for the stand, the removal of biomass to generate a profit would not be achievable. In order to make a biomass project feasible, government incentives for enhancing wildlife, soils, water, plant community, and wildfire protection must help pay for the biomass removal. The stand varies widely in density across the entire 715 acres. A representative for T2 Inc. (biomass company based out of Sweet Home Oregon), suggested breaking the property into units where the biomass tonnage would be greatest in yield (Steve Lawn, pers. comm). Once separated, these units may be thinned according to prescription and trees may be chipped on site either in single entry or multiple entries over a few years. The total volume of woody biomass on the property is approximately 14,124 cubic yards or 94 truckloads. Typically T2 Inc. will accept jobs when they estimate there will be biomass yield exceeding a minimum of 100-150 truckloads (each truckload approximately equal to 25-30 tons bone dry weight). If biomass is going to be used for a source of income in association with wildlife enhancement and fuel reduction thinning, highly dense portions of the property must be the focus of treatment. Fire break areas near the neighboring communities can potentially be heavily thinned producing large volumes of biomass in these specific units. Other highly dense areas can be heavily thinned as well, leaving approximately 15 square feet of basal area of old growth trees in the stand which would remain mainly on rock outcroppings. XV. Monitoring: On May 10, 2011, five landscape photo points were established on the Rickard Road property. The location of each point and lens directions have been recorded in the cruise and data collections protocol for future reference. Four photo points were randomly established near the corners of the property and one was placed in the center of the property. The 13 t main objective of the photo points is to monitor the stand after treatment. The photo points can be monitored by students in the COCC forestry program on a five year basis. These photo points will be crucial to determining the visual effectiveness of any treatments implemented on the property. These points will also indicate if further treatments to the stand are needed. XVI. Treatment options: The 2011 COCC Capstone Class recommends that one of the following treatment options be implemented on the Rickard Road property. The overall goals of the following options are to enhance wildlife habitat, restore the stand health to its full potential, and increase the recreational values of the property. t Treatment costs are estimates from Joe Stutler, Deschutes County Forester. The costs associated with each option are estimates; costs of treatments depend on the current market values. The thinning options are estimates for a contract thinning crew to implement the treatment and do not include profits made from a biomass treatment of the property. Treatment costs can be offset if a biomass thinning were implemented on the property. Option A: A heavy thinning, seeding of native grasses, full road closure, construction of a parking area with a sign kiosk, trail head, and the construction of a wildlife guzzler. This option would have a goal of reducing the juniper cover on the site to 5 percent stocking, with the focus on the removal of younger trees (trees less than 21 inches diameter breast height or DBH) and the retention of old growth trees. A biomass thinning of the area is recommended to help offset the cost of the following treatment. Those trees that exist on rock outcrops can be left as "islands" which is historically how juniper grew on the site. This would keep old decadent trees on the site for wildlife habitat, as well as freeing-up water resources for grasses and forbs. The seeding of native grasses can be implemented to accelerate the regeneration of natural vegetation. This will help mitigate the effects of disturbance caused by the harvesting process, and 14 s ~J 1 t reduce the chance of invasive species from taking control. With the exception of two gates for fire control, full road closure into the site and maintenance access would eliminate further degradation of the site from traffic, illegal dumping, and ATV/OHV use (Refer to map of recommended road closures). This would also allow for the site to return to the recommended road allowance of 1.5 miles of road per square mile of land. Construction of a primitive parking area would provide a location for the public to enter the site. This area would act as a trail head for non-motorized use and a location for a sign kiosk so that the county could post rules for use of the site. Constructing a wildlife guzzler on the site would improve the habitat value of the land for wildlife, and provide the public with more opportunities to encounter birds and mammals during visits. Implementation of this option would be the most costly option; however there are several opportunities to offset the costs with the use of grants from groups which have interests in the reduction of fuels for fire concerns, the reduction of juniper encroachment, and the improvement of wildlife habitat. This option is estimated to cost $763,000- $939,000; the cost breakdown is: • Thinning: Hand piling: $330,000- 579,000 (or) Lop and scatter: $57,000- $100,000 • Seeding of native grasses: Seed: $71,500- $214,500 Spreading: $286,000 • Closure of road entrances: Rock and tank traps: $4,000 • Parking area: $1, 000 Fire gates: Gates, fence, and installation: $7,800 t L~l • Guzzler: $8,500 15 r 1 • Signs: $1,200 Option B: A heavy thinning, full road closure, construction of a parking area with a sign kiosk, trail head, and the construction of a wildlife guzzler. This option would have the same stipulations and management goals as option A. This option would have a goal of reducing the juniper cover on the site to 5 percent stocking, with the focus on the removal of younger trees (trees less than 21 inches diameter breast height or DBH) and the retention of old growth trees. A biomass thinning of the area is recommended to help offset the cost of the following treatment. Those trees that exist on rock outcrops can be left as "islands" which is historically how juniper grew on the site. This would keep old decadent trees on the site for wildlife habitat, as well as freeing-up water resources for grasses and forbs. There is no seeding involved in this treatment option, which will help to lower the cost of treatment. This treatment is estimated to cost $262,500- $500,000. The cost breakdown is identical to the previous option minus the cost of seeding. Option C: Thinning in areas of high density, seeding of native grasses, creating a fire buffer near property boundaries that adjoin with residential properties, block access from Rickard Road, signs posted at 1 access points, reduction of roads, and the construction of a wildlife guzzler. t t 1 This option would focus on the thinning of trees only in areas of high density to produce a higher biomass yield to cover the cost of the treatment, as well as the creation of a fire buffer. With the exception of a fire maintenance gate, blocking all access from Rickard Road with materials from the site (piles of large rock that have been dumped and ripping of road entrances) would be recommended (Refer to map of recommended road closures). Signs would be posted at access points instructing users to stay on main roads, and the closure of approximately 50 percent of current roads with natural barriers (rocks) would be implemented. Introducing a wildlife guzzler to the site would improve the carrying capacity of the land for wildlife, and provide the public with more opportunities to encounter birds and mammals during visits. 16 Implementation of this option would be much less costly than option A. The majority of the expenses would be in labor for road closures. As in option A, there are opportunities to offset costs with the use of grants from groups that have interests in the reduction of fuels for fire concerns, the reduction of juniper encroachment, and the improvement of wildlife habitat, as well as the sale of wood for biomass uses. This option is estimated to cost $405,000- $560,000; the cost breakdown is: • Thinning and fire break: Hand piling: $30,000- $45,000 Lop and scatter: $17,000- $20,000 • Seeding of native grasses: Seed: $71,500- $214,500 Spreading: $286,000 • Closure of road entrances: Rock and tank traps: $4,000 • Signs: $1,200 • Guzzler: $8,500 Option D: Create a fire buffer on sides that adjoin with residential properties, issue firewood permits to select commercial firewood companies or charitable groups, post signs, and install a wildlife guzzler. This option would include a fire buffer to reduce fire hazard. The sale of special firewood permits to commercial or charitable agencies that could demonstrate a basic understanding of old growth management goals would be recommended. Such agencies are known to practice responsible harvest techniques at lower costs. Posting of signs at t+' entrance points and along roads to instruct users to keep on roads would be mandatory. The introduction of a wildlife guzzler to the site would improve the wildlife habitat. It would also provide the public with more opportunities to encounter birds and mammals during visits. 1 17 1 1 This treatment is estimated to cost $20,000- $35,000; the cost breakdown is: • Fire buffer: Hand piling: $15,000- $26,000 Lop and scatter: $2,600- $4,600 • Signs: $1,800 • Guzzler: $8,500 Option E: Leave it be. 1 t LI F-I i I Allow the property to sit until the economy improves or until biomass facilities are available locally. At this time any one of the previous options could be implemented. This would also allow the stand to increase in density, which would yield a higher biomass volume. This option would cost nothing at this time. Future costs are dependant on the market at that time. XVII. Recommendation: The 2011 COCC Capstone Class recommends that the Rickard Road property be treated with option A. This option will be costly but with the help of grants and a biomass thinning the treatment could pay for itself. This option will be the most beneficial to improving overall stand health and wildlife habitat, which should be the ultimate goal for this property. This option would also restore the stand to a natural fire return interval. This property could become a model to encourage residence in area to reduce hazardous fuels and restore their properties to an ecologically sound state. 18 XVIII. Cruise & Data Collection Protocol: A preliminary sample of 8 fixed, 1/5 acre plots yielded the result of a variance of 68.5. At this point we were able to determine that we needed to increase our sample size in order to get reliable numbers. A 'A acre plot size was chosen with a goal of at least 60 plots to be sampled across the 715 acre property. A map of the perimeter and roads ' was produced using data collected with a Trimble Geo XM GPS, and Terrasync was used to convert the data. Arcmap and Pathfinder office were then used to lay a grid of 66 plots, which were evenly spaced across the landscape. Each plot was assigned a coordinate (1984 NADS Oregon State Plane South) to be located by GPS during the cruise. From the 66 plots which were 'A acre in size, a 2.2 percent cruise intensity was calculated. From the plot centers, nested plots of 1/20 acre were established in order to calculate the ground cover of the stand. Visual estimates of each type of ground cover were recorded. Cruise cards were produced prior to the cruise and consisted of lot number, GPS coordinates, tree number, DBH, height, a tally space for trees less than 4 inches DBH, and space for the percentage of each type of ground cover (sagebrush, bitterbrush, rabbitbrush, grasses, forbs, and ' other). A space was also provided for extra comments and observations. Plot center was found with Trimble GPS units. From plot center, a radius of 58.9 feet was determined with a 100 foot cloth tape. All live junipers in the plot were measured; snags were counted separately. Diameter was taken at breast height (4.5 feet) with a Biltmore stick, and rounded to the nearest two inch class. Tree heights were measured with a relaskop then rounded to the nearest foot. Regeneration under 4 inch DBH was tallied. Visual estimates of each type of ground cover were observed and recorded . In order to determine the age, rot characteristics, and annual growth increments of the stand, 12 western juniper trees between the diameters of 9 inches and 28 inches were destructively sampled. Cookies were then taken and aged. Microsoft Excel was the primary source of data computation. The arithmetic average, the standard deviation, the variance, and the confidence interval were calculated using Microsoft Excel functions. The stand volume was calculated using Microsoft Excel and a volume equation which was taken from the U.S. Forest Service. 19 h d h d h Five p oto points were ran t roug omly place out the stand. They are marked with a rebar stake and fla gged with pink ribbon. The GPS locations and camera directions (NAD 1984) are: Point Point Location: Lens Direction: ' 1. N. 44.01156 W. 121.16028 True North 2. N. 44.02792 W. 121.15775 True North 3 N 44 01750 h . . . W. 121.15645 True Nort 4. N. 44.02276 W. 121.14936 True North 5. N 44.01413 W. 121.14599 True North (Refer to photos in appendix) 1 I I 7-1 L 20 XIX. Appendix: The Rickard Road Property: Soil Survey of Upper Deschutes River Area Key: Soil Type: 59c 58c 36a Soil Name: Gosney-rock w/Deskamp outcropping; 0-5% slopes Gosney-rock w/Deskamp outcropping; 5-15% slopes Deskamp loamy sand Acres: 558 107 50 21 Photo Point #1 Photo Point #2: fc~ r: ~d r AM w M 1-,9 , ,1 ~4' . -,11 22 F. Photo Point #3° a i Photo Point #4° sl: ro 4 23 Photo Point #5° 24 Cruise Calculations: Data Sheet Cruise Area Total Acreage 715 Total cruised acres 16 1/4 acre plots (58.9') #of plots 64 Intensity % 2.24 Shrubs Average %/Acre Sagebrush 16.4 Bitterbrush 2.1 Rabbitbrush 1.8 Grasses and Forbes 9.3 Noxious Weeds 2.6 Ground Cover/Acre 32.2 Total Acres Covered 230.2 Volume Mean 133.3 Vol./Ac. 483 cu.ft. 18 cu.yd. Median 121.7 Total Volume 345,582 cu.ft. 12,799 cu.yd. Mode 103.8 95%CI/Acre ± 71 cu.ft. Min 7.0 95%CI Whole area ± 50,793 cu.ft. Max 339.0 BA/Acre 58.07 sq.ft.95% CI ± 1.6 Range 332.0 Total BA 41,520 sq.ft. SEM (S) 8.88 TPA 43 95% Cl ± 6 STDEV (s) 71.04 Variance 5046.54 CV 53.28 25 Stand and Stock Table Size Class Volume/Acre (Cubic Feet) Total Volume (Cubic Feet) Stems/Acre Total Stems 4 1.97 1410 6.50 4648 6 12.10 8651 5.69 4067 8 19.42 13888 5.25 3754 10 27.94 19977 5.00 3575 12 31.45 22487 3.81 2726 14 30.98 22147 2.69 1922 16 44.67 31941 2.88 2056 18 48.93 34983 2.81 2011 20 38.47 27505 1.81 1296 22 53.33 38134 2.06 1475 24 33.62 24040 1.13 804 26 18.78 13430 0.56 402 28 18.48 13213 0.50 358 30 22.15 15837 0.56 402 32 15.52 11096 0.31 223 34 23.76 16987 0.50 358 36 12.03 8603 0.33 238 38 2.55 1825 0.06 45 40 6.71 4799 0.13 89 42 0.00 0 0.00 0 44 9.51 6799 0.13 89 46 5.48 3919 0.06 45 48 5.47 3912 0.06 45 Total 483 345582 43 30626 26 Sample of "Old Growth" Characteristics Characteristics Present Tree # DBH # Characteris DF RT L N C/R 1 18 3 1 1 1 2 28 3 1 1 1 3 38 4 1 1 1 1 4 40 3 1 1 1 5 52 3 1 1 1 6 42 4 1 1 1 1 7 24 4 1 1 1 1 8 20 3 1 1 1 9 40 3 1 1 1 10 38 3 1 1 1 11 28 3 1 1 1 12 34 3 1 1 1 13 28 3 1 1 1 14 38 4 1 1 1 1 15 40 4 1 1 1 1 16 30 3 1 1 1 17 28 3 1 1 1 18 24 3 1 1 1 19 26 4 1 1 1 1 20 42 3 1 1 1 21 30 4 1 1 1 1 22 36 4 1 1 1 1 23 40 4 1 1 1 1 24 28 3 1 1 1 25 40 3 1 1 1 32 30 3 1 1 1 1 1 33 22 3 1 1 1 1 34 42 5 1 1 1 1 35 21 4 1 1 1 1 36 26 5 1 1 1 37 29 3 1 1 1 1 1 38 32 3 1 1 1 39 31 3 1 1 1 40 32 3 1 1 1 1 1 41 28 4 1 1 1 1 42 23 3 1 1 1 1 1 43 25 3 1 1 1 44 25 4 1 1 1 45 16 4 1 1 1 46 16 3 1 1 1 47 38 5 1 1 1 1 48 25 5 1 1 1 49 25 4 1 1 1 50 15 4 1 1 1 1 DF: Deeply Furrowed B ark; 19 Mean DBH 26.4 RT: Rounded Top: 16 Median DBH 25 L: Lichen: 16 Most Occurring DBH 25 N: Wildlife Nest: 16 Max DBH 42 C/R: Conk/Pocket Rot: 15 Min DBH 15 27 Destructive Sampling Data Sampled Tree DBH/Age Data Tree # Coordinates: DBH: 1: Al N44.02671 W121.16130 6.2 6: E2 N44.01347 W 121.14402 7 2: A2 N44.02671 W121.16130 12.2 7: E3 N44.01321 W121.14415 13 3: A3 N44.02665 W121.16123 18.5 11: E7 N44.02665 W121.16124 18.5 8: E4 N44.02572 W 121.16155 22 10: E6 N44.02545 W.121.15478 26 9: E5 N44.01532 W121.14632 28 4: A5 N44.02376 W 121.16212 28.5 5: El N44.01232 W121.14622 29 Average: 18.9909091 `All Age Measurements taken at DBH or 4.5' above ground. Height: Age: Volume Lost to Rot Growth over last 10 years 23 64 N/A 19.5 31 56 N/A 17.3 30 82 N/A 23.5 26 82 15 18 31 168 20 12 30 217 25 12 26 223 35 13 19 171 15 14.2 20 252 5 13 41 247 40 14 31 263 2 14 28 165.909091 19.625 15.5 28 I Map of Current Site & i Road Conditions: 29 I Ma of Recommend • Map ed Road Closures. r. 30 'I u XX. References: ences. Carbon Credit Values: Chicago Climate Exchange, 4/15/2011 ' Carbon Credit Potential: USFS Forest Inventory and Analysis. USDA Forest Service, 2002 Cruise Calculations: Forest Measurements, 5th Edition. Avery & Burkhart 2002 Entomology. & Pathology: Bega, Robert. (1978). Diseases of Pacific Coast Conifers. (Agriculture Handbook No.521). USDA Forest Service.: (pg.176) r Si l i W 1987 D nc a r, ayne. ( iseases of Trees and Shrubs.Cornell University Prees.: (pg. 242-244) A FIELD GUIDE TO DISEASES & INSECT PESTS OF NORTHERN & CENTRAL ROCKY MOUNTAIN CONIFERS. USDA Forest Service. May 4, 2011, ' www.fs.fed.us/rl r4/spf/fhp/field guuide/93jnprmt.html (pg.93) (2008) Juniper Pocket Rot. Nevada State Forestry Division. http: / /forestry.nv.j~ov/forestryresources/forest-heath/juniper-pocket-rot Hagle, Susan. (2010). Forest Insect and Disease Leaflet 177.USDA Forest r Service.: (pgs. l -6) Juniper Ecology & Wildlife Associates: 1999, Gedney, D.R., Azuma, D.L., Bolsinger, C.L., McKay, N., Western Juniper in Eastern Oregon. General Tech. Report P.N.W- G.T.R- 464. Portland, OR: U.S. Department of Agriculture, Forest Service, P.N.W.S Soils & Recreational Impact Information: Soil Survey of Upper Deschutes River Area including parts of Deschutes Jefferson, and Klamath Counties. USDA Natural Resources Conservation Service in cooperation with the USDA Forest Service, US Department of Interior B.L.M, and Oregon Agriculture Experimental Station. 2002 I Volume Equations: Chittester, J.M., MacLeon, C.D., Cubic- Foot Tree Volume Equations and Tables for Western Juniper. Research Note P.N.W.- 420, U.S. Dept. of Agriculture, Forest Service, P.N.W. Water Resources: 1993.Western Juniper, Its Impacts and Management in Oregon Rangelands Oregon State University Extension Services. EC-1417. http: / /juniper.oregonstate.edu/EC 1417.pdf 1 31 1 Wildfire/ W.U.I: 2006. Greater Bend Community Wildfire Protection Plan Wildfire Ratings: 2006. Greater Bend Community Wildfire Protection Plan Wildlife: 2005. Oregon Dept. of Fish and Wildlife. Oregon Conservation Strategy. Oregon Dept. of Fish and Wildlife, Salem. Oregon. 1998. Rick Miller, Wendy Waichler, and Paul Doescher, Old Growth Western Juniper Woodlands. Zoning Information: htt-p://www.lava5deschutes.org Deschutes County Code, Chapter 11.04 http://www.co.deschutes.or.us/dccode/`index.html 1 XXI. Contacts: Biomass: Steve Lawn, T2 Incorporated, Biomass Specialist, 5/5/2011 Cruise Calculations: Ron Boldenow, Central Oregon Community College, Forestry Juniper Ecology: Bret Michalski, Central Oregon Community College, Wildlife Biologist & Forestry Juniper Ecology: Michael Fisher, Central Oregon Community College, Forestry & Juniper Ecologist Noxious Weeds: Dan Sherwin, Deschutes County Roads Dept., Weeds Specialist, 4/12/2011 Property Value & County Codes: Teresa Rozic, Descutes County Land Specialist, 4/10/2011 Recreation: Timm McChesney, U.S. Forest Service, Combined O.H.V. Trail Tech., 4/6/2011 Treatment Costs: Joe Stutler, Deschutes County Forester Wildfire/ W.U.I: Tom Andrade, ODF, Wildfire Specialist, 4/20/2011 Wildlife: Bret Michalski, Central Oregon Community College, Wildlife Biologist & Forestry Larry Pacenka, Oregon Dept. of Fish & Wildlife, Wildlife Biologist, 5/5/2011 32 G n I-A Community Development Department Planning Division Building Safety Division Environmental Soils Division 117 NW Lafayette Avenue Bend Oregon 97701-1925 (541)388-6575 FAX(541)385-1764 http://www.co.deschutes.or.us/cdd/ MEMORANDUM To: From Board of County Commissioners Nick Lelack, AICP, Planning Director MTG. Date: June 1, 2011 Re: Work Session: Deschutes National Forest (DNF) Urban Growth Boundary (UGB) Amendment, Comprehensive Plan Map Amendment, Zoning Map Amendment (Ordinances 2011-019, 2011-020,2011-021; Case Files PA-11-1, ZC-10-1, MA- 11-3) SUMMARY The purpose of this work session is to prepare the Board for its June 27 public meeting to consider adopting ordinances by emergency related to the Deschutes National Forest's (DNF) 26-acre portion of the former Bend Pine Nursery site. DNF is in the process of building a new headquarters facility to accommodate all of its administrative functions at one site in the vicinity of the City of Bend to improve efficiency and reduce costs. On May 23, Hearings Officer Ken Helms approved the following applications: PA-11-1, ZC-10-1, and MA-11-3. Please find the decision attached to this staff report and a map of the subject property. No public comments have been provided or received regarding these applications in writing or at the public hearing, conducted on Monday, May 2. Specifically, this land use decision approves the following: • Amends the Deschutes County Comprehensive Plan map designation for the subject property from Urban Reserve Area (URA) to Public Facilities (PF). The Board would approve this decision by adopting Ordinance 2011-019. • Changes the Deschutes County zone of the subject property from Urban Area Reserve (UAR10) to Public Facilities (PF). The Board would approve this decision by adopting Ordinance 2011-020. • Expands the City of Bend Urban Growth Boundary (UGB) to include the 26-acre DNF property. The Board would approve this decision by adopting Ordinance 2011-021. Quality Services Performed with Pride PROCESS Deschutes County Hearings Officer Helms discusses the approval procedure on page 3 of the decision. In sum, land use decisions in the City UGB and UAR are governed by a joint management agreement adopted by the City and County in 1998. The subject property is in the City's UAR. Therefore, the County retains land use jurisdiction. The proposed Comprehensive Plan and zoning amendments are to occur in the UAR prior to the UGB amendment. In addition, zone changes are required to be in compliance with the Comprehensive Plan. Therefore, the amendments must be adopted in the following order, which is consistent with the ordinance numbers: 1. Comprehensive Plan amendment (Ord. 2011-019). 2. Zone Change (Ord. 2011-020). 3. UGB amendment (Ord. 2011-021). This amendment is proposed to be effective upon the effective date of the City of Bend's ordinance adopting the UGB amendment. Based on Deschutes County Code (DCC) 22.28.030, summarized below, the Board is required to approve this decision unless it is appealed or the Board initiates review by the appeal deadline, which is June 6. If the Board wishes to initiate a review, it must do so at the June 1 meeting since the Board does not meet on June 6. Without an appeal or Board initiated review, the June 27 meeting will consist of the Board adopting the ordinances without testimony. DCC 22.28.030 governs County decisions on quasi-judicial Comprehensive Plan amendments and zone changes (emphasis added below). 22.28.030. Decision on Plan Amendments and Zone Changes. A. Except as set forth herein, the Hearings Officer or the Planning Commission when acting as the Hearings Body shall have authority to make decisions on all quasi judicial zone changes and plan amendments. Prior to becoming effective, all quasi judicial plan amendments and zone changes shall be adopted by the Board of County Commissioners. B. In considering all quasi judicial zone changes and those quasi judicial plan amendments on which the Hearings Officer has authority to make a decision, the Board of County Commissioners shall, in the absence of an appeal or review initiated by the Board, adopt the Hearings Officer's decision. No argument or further testimony will be taken by the Board. C. Plan amendments and zone changes requiring an exception to the goals or concerning lands designated for forest or agricultural use shall be heard de novo before the Board of County Commissioners without the necessity of filing an appeal, regardless of the determination of the Hearings Officer or Planning Commission. Such hearing before the Board shall otherwise be subject to the same procedures as an appeal to the Board under DCC Title 22. D. Notwithstanding DCC 22.28.030(C), when a plan amendment subject to a DCC 22.28.030(C) hearing before the Board of County Commissioners has been consolidated for a hearing before the Hearings Officer with a zone change or other permit application not requiring a hearing before the board under DCC 22.28.030(C), any party wishing to obtain review of the Hearings Officer's decision on any of those other applications shall file an appeal. The plan amendment shall be heard by the Board consolidated with the appeal of those other applications. (Ord. 95 045 §23, 1995; Ord. 90 007 §1, 1990) CITY OF BEND ACTIONS / TIMELINE The City of Bend is concurrently processing an amendment to the Bend Area General Plan to expand the UGB to include this 26-acre site. The City's Hearings Officer Tim Elliot recommended approval on May 19. No public comments were provided or received at the public hearing. The Bend City Council will conduct a public hearing and First Reading of an ordinance to adopt this UGB amendment on June 1 (the same day as this work session). The Bend City Council is expected to conduct a Second Reading of the ordinance on June 15, with an effective date of July 15. Following the County's adoption of the UGB amendment, the City will immediately initiate annexation of the subject property. REASON FOR EMERGENCY The reason for the emergency adoption is to allow the DNF to connect its new headquarters facility to the City of Bend's sewer prior to opening, expected in fall 2011. The City will not allow DNF to connect to its sewer system unless the site is in the city limits. Therefore, this is a public health-related issue for DNF employees and visitors. If the County adopts the UGB Amendment Ordinance 2011-021 on June 27 without the emergency clause, the ordinance will not take effect for 90 days until approximately September 27. This delay would impact the annexation and sewer hook-up processes, and consequently the facility's planned opening. DISCUSSION / DECISION Staff invites Board questions and comments on this land use decision, process, and next steps. In addition, as stated above, if the Board wishes to initiate review of this application, it must do so at this meeting. Initiating a review would consist of conducting a public hearing, followed by deliberations on the proposed ordinances. ATTACHMENTS: 1. Decision of the Deschutes County Hearings Officer on Case Files PA-11-1, ZC-10-1, and MA-11-3. 2. UGB Expansion Map, including Comprehensive Plan and Zone Designations. 3. Site Plan (for informational purposes only). 4. E C/ m m D z m e. D' m rr- -•~o' F~Xg~ ~ Y W1 MAE. -H gFn ~m m ~ i ~ F F 44 m f'c Z TF ~ ~a ~L^e CCCC oc o ~ vo 4 Q 99 g _ ~ 8 b' m 8 p N m-n z $ o m 0 HA - mm m N ~ 3 F 4 22~l 11 ° of N' PIET 2 x .ma USDA FOREST SERVE ~C~ nn vy S A TT r a _ ° BEND PINE ADMIN. SITE -PHASE 7 TsP YkNn wMRAym °"`""fi" r 7 TEELE SSOCIATES ARCHITECTS LLC. SCO DESNES u , X80 `'O OVERALL SITE PLAN NATION p ST ^ R"I z 9 eEw O oR w onm 8.4 oR eYinm t , vac s.~aesae a SMSo BIU SET - FEBRUARY 12, 2010 SR 2.5 Subject Property 17-12-23-00-01800 Plan Amendment from _L L Urban Reserve Area (URA) - - - " to Public Facilities (PF) g Zone Change from Urban UAR10 Area Reserve (UAR) to Public Facilities (PF) Urban Growth Boundary Expansion Area MI ~I r FH Trm-~~ rrr EFUTRB MUA10 Legend PA-11-1 ZC-10-1 MA-11-3 L_J Bend Urban Growth Boundary Q Subject Property 17-12-23-00-01800 County Zoning EFUTRB - Tumalo/Redmond/Bend Subzone MUA10 - Multiple Use Agricultural UAR10 - Urban Area Reserve - 10 Acre Minimum SR 2.5 - Residential 2.5 Acre Minimum Applicant: Deschutes County Owner: United States of America Taxlot: 17-12-23-00-01800 Address: 63095 Deschutes Market Rd, Bend V V r•ma DECISION OF THE DESCHUTES COUNTY HEARINGS OFFICER FILE NUMBERS: APPLICANT: OWNER: PA-11-1, ZC-10-1, MA-11-3 Deschutes County 117 NW Lafayette Avenue Bend, OR 97701 Deschutes National Forest 1001 SW Emkay Drive Bend, OR 97702 REQUEST: Proposed amendments to change the Comprehensive Plan map designation of the subject property from Urban Reserve Area (URA) to Public Facilities (PF), change the zone of the subject property from Urban Area Reserve (UAR10) to Public Facilities (PF), and expand the City of Bend Urban Growth Boundary to include the 26-acre Deschutes National Forest property. HEARING DATE: May 2, 2011 RECORD CLOSED: May 2, 2011 STAFF CONTACT: Nick Lelack, Planning Director 1. APPLICABLE STANDARDS & CRITERIA: A. Oregon Administrative Rules (OAR) Chapter 660 Division 2, Interpretation of Goal 2 Exception Process Division 12, Transportation Planning Division 15, Statewide Planning Goals Division 24, Urban Growth Boundaries B. Oregon Revised Statues Chapter 197, Comprehensive Land Use Planning Coordination Section 298, Priority of Land to be Included Within Urban Growth Boundary C. Bend Urban Growth Boundary Zoning Ordinance, Title 19 Chapter 19.116, Amendments, Appeals and Procedures Section 19.116.010, Amendments Section 19.116.020, Standards for Zone Change D. Deschutes County Development Procedures Ordinance, Title 22 Chapter 22.28, Land Use Action Decisions Section 22.28.030, Decision on Plan Amendments and Zone Changes PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 1 E. Deschutes County Comprehensive Plan, Title 23 Chapter 23.48, Urbanization Section 23.48.030, Urban Growth Boundary Policies Section 23.68.020, Public Facilities and Services Policies F. Bend Area General Plan G. Joint Management Agreement between the City of Bend and Deschutes County. II. FINDINGS OF FACT: A. LOCATION: The subject property is located at 63095 Deschutes Market Road, Bend, and is identified on Deschutes County Assessor map 17-12-23, as tax lot 1800. B. LOT OF RECORD: The subject property is part of the former United States Forest Service (USFS) Bend Pine Nursery. Consistent with prior Hearings Officers decisions in PA-07-5, PA-08-2/ZC-08-2/MA-08-8 and LR-07-52, I find the subject site is not a lot of record, but that it need not be in order to be re-designated and rezoned. C. SITE DESCRIPTION: The subject property is a 26-acre portion of the former Bend Pine Nursery site which originally consisted of 210 acres. The Deschutes National Forest (DNF) sold 184 acres of the original Pine Nursery to the Bend Metro Park and Recreation District (park district) for development of public parks. The park district then conveyed 15 acres to the Bend-La Pine School District for Ponderosa Elementary. The 26-acre parcel subject to this plan amendment application, is generally level, irregular in shape, and developed with twelve buildings that serve a variety of Forest Service programs. Water is available to the subject property from the Avion Water Company (Avion) and city sewer facilities are located nearby. The subject property has direct access from Deschutes Market Road, a designated rural collector road in the County, and a major collector in the City of Bend. Site History The United States of America acquired the subject property in 1943, and beginning in the late 1940's the property housed the facilities of the Bend Pine Nursery. Subsequent to the closure of the Bend Pine Nursery as a production nursery in 1999, the property continued to be the location for warehouse and other support facilities for DNF and the Bend-Fort Rock Ranger District. D. SURROUNDING USES: The subject site is surrounded to the north and west by the Bend Metro Park and Recreation District Pine Nursery community park. To the east are primarily residential uses on lands zoned UAR-10. To the south are the North Unit Irrigation Canal and residential uses on lands within the City of Bend zoned RS (Urban Standard Residential). E. PROCEDURAL HISTORY: The application for ZC-10-1 was submitted on March 11, PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 2 2010. The first evidentiary hearing was scheduled for April 27, 2010. Due to the nature of the applications, notice of application along with a number of notices of public hearing were mailed to property owners within 250 feet of the subject property. The Planning Division also published notice of the public hearings in the Bend Bulletin. No comments were received to any of the mailed or published notices. The initial public hearing was continued six times to May 2, 2011.` File number PA-11-1 was submitted on January 11, 2011 with the intent that the zone change and plan amendment be processed concurrently. County file PA-11-1 was modified via MA-11-3 on April 12, 2011 for the proposed 26-acre UGB amendment. At the first public hearing and each of the continued hearings, the hearings officer provided opportunity for testimony by the applicant and the public. Other than some preliminary comments made at the first public hearing by the applicant, no other public testimony was offered at any of the public hearings. F. ADDITIONAL PROCEDURE: Land use actions adjacent to the City UGB in the Urban Area Reserve are governed by a joint management agreement (JMA) adopted by the City and Deschutes County (County) on February 24, 1998. This document calls for cooperation between the City and County in planning for the UAR10 zone. For land use decisions within the urban reserve and, therefore, outside of the UGB, the County retains jurisdiction with a requirement that the City receive notice of the application. At this time, the subject property is within the urban reserve. Therefore, the County retains jurisdiction over the proposed plan amendment and zone change. In addition to the proposed plan amendment and zone change, the applicant proposes to expand the City UGB to include the 26-acre DNF site. Per the JMA, the City and County share responsibility for processing UGB expansions. Quasi-judicial applications are reviewed by a hearings officer at both the City and the County. Then, if approved, both the County Commissioners and City Council will hold public hearings and adopt implementing ordinances to enact the UGB expansion. Finally, the amendment must be transmitted to the Oregon Department of Land Conservation and Development (DLCD) for acknowledgement of compliance with applicable state land use laws. As noted previously, the County only retains jurisdiction over those land use decisions within the urban reserve and outside of the UGB. For this reason, if the proposed amendments are approved they must be approved in the following order: 1. Plan Amendment and Zone Change 2. UGB expansion. G. PROPOSAL: At this time, the DNF desires to locate all of its administrative functions at one site in the vicinity of the City to improve efficiency and reduce costs. Currently, administrative functions occupy four sites: Forest Headquarters office on Emkay Drive; Bend-Fort Rock District office on NE 3`d Street; Scott Street Work Center on SW 2nd Each request for continuance is included in the record. PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 3 Street; and Bend Pine Work Center on Deschutes Market Road (subject property). John Allen, Forest Supervisor, in a Decision Notice dated January 17, 2008, authorized the implementation of Alternative 2 of Environmental Assessment for the Collocation of the Bend-Fort Rock Ranger District Office, Forest Headquarters Office, and Work Center (no date). This decision would require the construction of a new office and expanded work center at the Bend Pine Work Center, also known as Bend Pine Administrative Site. A total of 12 sites were considered for the new collocated office and work center. Due to the high cost of real estate, the Regional Forester and Forest Supervisor decided to consider only sites owned by the Forest Service, which eliminated seven sites. The remaining five sites were then analyzed in the Environmental Assessment (see below). The applicant is proposing amendments to change the Comprehensive Plan Map designation of the subject property from Urban Reserve Area (URA) to Public Facilities (PF), change the zone of the subject property from Urban Area Reserve (UAR10) to Public Facilities (PF), and expand the City UGB to include the 26-acre DNF property. The 26-acre expansion site would accommodate the co-location of several DNF operations including the construction of. 43,000-square-foot office, 12,000-square-foot fire management building, 17,000-square-foot warehouse, 10,000 square feet of road and maintenance shops, 5,600-square-foot crew quarters for seasonal employees, and approximately 7.5 acres of paving for parking, access, and walkways. In addition to the above-referenced construction, three existing buildings (packing shed, office, and north pre-cooler) would be removed. No development is proposed as part of these applications. The application materials and supporting documents are incorporated herein by this reference. H. AGENCY COMMENTS: The Planning Division mailed notice to several public agencies and received the following comments. Environmental Soils Division. [Deschutes National Forest] could apply for a Wastewater Pollution Control Facility (WPCF) permit from DEQ. [STAFF COMMENT: The above comment from Environmental Soils was based on the original DNF relocation project which planned for on-site sewage disposal. The current relocation project would connect to City sewer. No WPCF permit would be required.] County Senior Transportation Planner. I've reviewed the materials for PA-11-1, ZC-10-1 regarding transportation findings. I have limited my comments to facilities under the jurisdiction of Deschutes County. I agree with the proposed mitigation of a northbound left-turn lane on Deschutes Market Road at the site's access. I will defer to City of Bend staff regarding comments and mitigations for affected intersections that are under the City's jurisdiction. County Road Department. Deschutes Market Road is a County Road (rural collector classification) with an ADT of 4784 (2008 count) and a paved width of 30 feet. If the UGB PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 4 expansion is approved, Deschutes Market Road would be under the City of Bend's jurisdiction along the eastern frontage of the subject property. Any road improvement to Deschutes Market Road will have to meet City of Bend standards for an urban collector street. Bend Fire Department. Fire Safety During Construction and Demolition - 2007 IFC Chapter 14 Approved fire department access roads, required water supply, fire hydrants, and safety precautions shall be made available prior to the issuance of a building permit. Water Supply - 2004 Oregon IFC Section 508 An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. See the City of Bend Fire Marshal for approval of firefighting water supply. Obstruction & Protection of Fire Hydrant - 2007 Oregon IFC 508.5.4 through 508.5.6 A 3-foot clear space shall be maintained around the circumference of fire hydrants. When exposed to vehicular damage, concrete curbing, sidewalks, or 4 inch concrete filled bollards placed 3 feet from hydrants shall suitably protect fire hydrants. Hydrants shall be coated with approved red paint color and markings. Premises Identification - 2007 Oregon IFC 505.1 Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background and visible at night. Street or Road Signs - 2007 Oregon IFC 505.2 Streets and roads shall be identified with approved signs. Signs shall be of an approved size and weather resistive construction. Fire Lanes - 2007 Oregon IFC 503.3 Approved signs or other approved notices shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. Such signs or notices shall be kept in legible condition at all times. Fire lane curbs shall be painted bright red with white letters. The stroke shall be 1 inch with letters 6 inches high to read "No Parking Fire Lane". Spacing for signage shall be every 50 feet. Fire Apparatus Access Roads (General) - 2007 Oregon IFC Section 503 and Appendix D Fire apparatus access roads shall be placed within 150 of all exterior walls of the first floor of all buildings. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet designed with an approved driving surface to support the imposed GVW of 60,000 lbs. and a vertical clearance of not less than 13 feet 6 inches. Turning radius PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 5 shall not be less than 45 feet and gradient shall not exceed 12 percent unless the authorities having jurisdiction approve a variance. Dead-end access roads in excess of 150 feet in length shall be provided with approved provisions for the turning around of fire apparatus. A cul-de-sac, hammerhead or other means for the turning around of fire apparatus may be approved. Aerial Access Roads - 2007 Oregon IFC Appendix D, Section D105 Buildings or portions of buildings or facilities exceeding 30 feet in height above the lowest level of fire department vehicle access shall be provided with approved fire apparatus access roads capable of accommodating fire department aerial apparatus. Overhead utility and power lines shall not be located within the aerial fire apparatus access roadway. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the building. Key Boxes - 2007 Oregon IFC Section 506 Key Box (Knox Box) for Fire Department access is required to be installed at all locked gates and barriers. An application for the Knox Box is available by calling the Fire Prevention office at (541) 322-6309. Portable Fire Extinguishers - 2007 Oregon IFC Section 906 Fire extinguishers rating shall not be less than a 2A:1 OBC. Maximum unobstructed travel distance to any approved extinguisher shall not be more than 75 feet. Dumpsters - 2007 Oregon IFC 304.3 Dumpsters and containers with an individual capacity of 1.5 cubic yards or more shall not be stored in buildings or placed within 5 feet of combustible walls, openings, or combustible roof eves unless area is protected by an approved automatic fire sprinkler system. Gas Meters & Piping - 2007 Oregon IFC Section 312 Aboveground gas meters, regulators and piping exposed to vehicular damage due to proximity to alleys, driveways or parking areas shall be protected in an approved manner. The following agencies and individuals did not respond to the notice: County Assessor, County Building Division, Central Oregon Irrigation District, Swalley Irrigation District, Avion Water Company, City of Bend Planning Department, City of Bend Public Works Department, Department of Environmental Quality, Department of Land Conservation and Development, and Oregon Department of Transportation. PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 6 III. CONCLUSIONS OF LAW A. Statewide Planning Goals 1. Goal 1: Citizen Involvement Oregon Statewide Planning Goal 1 seeks "To develop a citizen involvement program that insures the opportunity for citizens to be involved in all phases of the planning process." FINDING: During this land use process, public notice was provided by the county to affected agencies and surrounding property owners. The County Hearings Officer held a public hearing on May 2, 2011. The Board of County Commissioners will also hold a public hearing. The City of Bend will also provide notice for their concurrent process. Goal 1 is met. 2. Goal 2: Land Use Planning Oregon Statewide Planning Goal 2 seeks "To establish a land use planning process and policy framework as a basis for all decision and actions related to use of land and to assure an adequate factual base for such decisions and actions." FINDING: In compliance with Goal 2, concurrent applications were processed with the City and County to expand the Bend UGB. Based on the record, there is sufficient information to demonstrate an adequate factual basis and to enable both jurisdictions to make an informed decision regarding the proposed amendments. Goal 2 is met. 3. Goal 3: Agricultural Lands; Goal 4: Forest Lands Oregon Statewide Planning Goal 3 seeks "To preserve and maintain agricultural lands." Oregon Statewide Planning Goal 4 seeks "To conserve forest lands" FINDING: The subject property is not identified as agricultural or forest land on either the Bend Area General Plan or Deschutes County Comprehensive Plan Maps. The subject property is identified as Urban Area Reserve in both Plans. Under OAR 660-024- 0020(1)(b), Goals 3 and 4 do not apply to UGB amendments. The application is consistent with Goals 3 and 4. 4. Goal 5: Open Spaces, Scenic and Historic Areas, and Natural Resources Oregon Statewide Planning Goal 5 seeks "To protect natural resources and PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 7 conserve scenic and historic areas and open spaces." FINDING: Goal 5 resources are listed in the county's acknowledged Comprehensive Plan. There are no identified Goal 5 resources on the site. Utilizing the selected site as proposed will have no significant adverse impact on the amount of open space or scenic views available in the County. Goal 5 is met. Impacts on related resources: Mineral and aggregate resources: The subject property has never been zoned for mineral or aggregate resources. Energy sources: There are no known energy resources on the site such as natural gas, oil, coal or geothermal heat. Fish and wildlife habitat: The property has no fish or wetland habitat. The site is unlikely to contain threatened or endangered species. The site is already developed and surrounded by development that limits its potential for threatened or endangered species. Ecologically and scientifically significant natural areas, including desert areas: Nothing about the selected site make it ecologically or scientifically significant. Outstanding scenic views: Nothing about the site indicates it has a significantly better view than other sites in the vicinity. Water areas, wetlands, watersheds, and groundwater resources: There are no wetlands or watersheds within the subject site. Although the North Unit Canal borders the subject property to the south, there are no anticipated impacts to the canal or its waters. No watersheds will be affected by the amendments. The site will be served by City sewer and will not adversely affect the groundwater due to septic discharge. Wilderness areas: The site does not meet the definition of "wilderness areas" as described within the Oregon State Goals and Guidelines. The property is currently developed with the Forest Service's Bend Pine Work Center, and does not contain pristine surroundings or old growth trees. Historic areas, sites, structures and objects: The subject property has no structures listed on the National Register of Historic Places. No structures or places of historical significance have been determined to exist on or near the property selected. Cultural areas: The site has no known cultural resources. 5. Goal 6: Air, Water and Land Resources Quality Oregon Statewide Planning Goal 6 seeks "To maintain and improve the quality of the air, water, and land resources of the state." PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 8 FINDING: Maintaining or improving the quality of the community's air, water and land resources will be assured through enforcement of state and local regulations. Expansion of the UGB and annexation of the parcel to the City of Bend will ensure connection to City sewer services. The record shows that noise levels are unlikely to exceed DEQ noise regulations. 6. Goal 7: Areas Subject to Natural Disasters and Hazards Oregon Statewide Planning Goal 7 seeks "To protect people and property from natural disasters and hazards" FINDING: There are no areas within the site that are subject to flooding or landslide activity. The wildfire hazard for the site is the same as other areas where junipers, pine and native brush exist. Development of the site will reduce the potential for wildfires by providing adequate water to meet the fire flow requirements for the proposed Forest Service operations. 7. Goal 8: Recreational Needs; Goal 9: Economic Development; Goal 10: Housing Oregon Statewide Planning Goal 8 seeks "To satisfy the recreational needs of the citizens of the state and visitors and, where appropriate, to provide for the siting of necessary recreational facilities including destination resorts." Oregon Statewide Planning Goal 9 seeks "To provide adequate opportunities throughout the state for a variety of economic activities vital to the health, welfare, and prosperity of Oregon's citizens." Oregon Statewide Planning Goal 10 seeks "To provide for the housing needs of citizens of the state." FINDING: Given the small size and specific need addressed by the proposed UGB expansion, staff found, and I agree, that Goals 8, 9, and 10 are not relevant. 8. Goal 11: Public Facilities and Services Oregon Statewide Planning Goal 11 seeks "To plan and develop a timely, orderly and efficient arrangement of public facilities and services to serve as a framework for urban and rural development." FINDING: The record shows that the existing water lines and sewer service near the site will allow for the efficient and cost effective extension of these needed services to the site. As discussed in more detail below, planned improvements to City roadways will provide adequate access to the site. For these reasons, the record is sufficient to show that public facilities and services are available to serve the needs of the proposed Forest PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 9 Service operations. 9. Goal 12: Transportation Oregon Statewide Planning Goal 12 seeks "To provide and encourage a safe, convenient and economic transportation system." FINDING: OAR 660-012 implements Oregon Statewide Planning Goal 12. This rule requires the City to prepare and adopt a Transportation System Plan (TSP) as part of its comprehensive plan. The Bend Urban Area Transportation System Plan was adopted October 11, 2000. The proposal's compliance with OAR 660-012 is discussed below. 10. Goal 13: Energy Conservation Oregon Statewide Planning Goal 13 seeks "To conserve energy." FINDING: The proposed amendments and co-location of multiple Forest Service functions at a single site will improve operational efficiency and reduce operational costs. In addition, co-location will eliminate Forest Service personnel trips between the four current sites. Goal 13 is met. 11. Goal 14: Urbanization (amended effective April 28, 2005) Oregon Statewide Planning Goal 14 seeks "To provide for orderly and efficient transition from rural to urban use, to accommodate urban population and urban employment inside urban growth boundaries, to ensure efficient use of land, and to provide for livable communities." Urban Growth Boundaries Urban growth boundaries shall be established and maintained by cities, counties and regional governments to provide land for urban development needs and to identify and separate urban and urbanizable land from rural land. Establishment and change of urban growth boundaries shall be a cooperative process among cities, counties and, where applicable, regional governments. An urban growth boundary and amendments to the boundary shall be adopted by all cities within the boundary and by the county or counties within which the boundary is located, consistent with intergovernmental agreements, except for the Metro regional urban growth boundary established pursuant to ORS chapter 268, which shall be adopted or amended by the Metropolitan Service District. Land Need Establishment and change of urban growth boundaries shall be based on the following: PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 10 1. Demonstrated need to accommodate long-range urban population, consistent with a 20-year population forecast coordinated with affected local governments; and 2. Demonstrated need for housing, employment opportunities, livability or uses such as public facilities, streets and roads, schools, parks or open space, or any combination of the need categories in this subsection (2). In determining need, local government may specify characteristics, such as parcel size, topography or proximity, necessary for land to be suitable for an identified need. Prior to expanding an urban growth boundary, local governments shall demonstrate that needs cannot reasonably be accommodated on land already inside the urban growth boundary. FINDING: The application materials include an Environmental Assessment for the Collocation of the Bend-Fort Rock Ranger District Office, Forest Headquarters Office, and Work Center (EA), which details the proposed co-location and the alternative sites considered. According to the EA, current Forest Service regional policy and direction is to co-locate facilities when those facilities are located within 35 miles of each other. Forest Service administrative functions occupy four sites: Forest Headquarters office on Emkay Drive; Bend-Fort Rock District office on NE 3`d Street; Scott Street Work Center on SW 2°d Street; and Bend Pine Work Center (BPWC) on Deschutes Market Road. The greatest distance between these sites is seven miles (Forest Headquarters Office to BPWC). Twelve sites were considered for the co-location project. Due to the high cost of real- estate, the Regional Forester and Forest Supervisor decided to consider only sites owned by the Forest Service. This eliminated seven sites from further consideration. The remaining five sites are mapped in the EA and were identified as: 1. Bend Pine Work Center 2. Cascade Lakes site (Cascade Lakes Highway near the Entrada Lodge) 3. Scott Street Work Center 4. Knott Road/Baker Road interchange site 5. China Hat Road site All of these sites were evaluated using the following criteria: 1. Ability to locate all Forest Service administrative functions at one site 2. Located within the Bend Urban Growth Boundary or Urban Reserve areas 3. Easy public access by major arterial roads or highways 4. Costs and level of complexity of development 5. A minimum of 10 acres in size The record shows that the Scott Street site is the only Forest Service-owned site currently PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 11 within the Bend UGB. As required by the above criteria, the applicant must demonstrate why the proposed need cannot be reasonably accommodated on land already inside the UGB. In this case, the 6.4-acre Scott Street site would not be large enough to accommodate the co-location proposal. The EA estimates that approximately 10-15 acres of land are required to co-locate the various operations onto a single site. With regard to the other sites, the EA identified specific characteristics which are necessary for a site to be selected for the proposed co-location. Based upon these characteristics, the applicant chose the Bend Pine Work Center (BPWC) as the preferred alternative. The EA indicates that the BPWC site has a number of advantages including sufficient land to accommodate the co-location, adjacency to the existing UGB, readily available utilities such as sewer and water, and easy access to Highway 97 via Empire Avenue (an urban arterial). Unlike the BPWC site, the three alternative sites which are outside of the Bend UGB (Cascade Lakes, Knott Road, and China Hat Road) are not adjacent to the existing UGB. Although the remaining sites (Cascade Lakes, Knott Road, and China Hat Road) are all large enough to accommodate the co-location, the applicant indicates that necessary public services such as City sewer and water are not readily available at these sites. In addition to the lack of available sewer and water service, the EA identifies other considerations. With regard to the Cascade Lakes property, the EA cites relatively poor access to Highway 97 because the Cascade Lakes property is located approximately four miles from Highway 97, with the most direct route to the site via Reed Market Road (primarily a local road). For the Knott Road site, there is no current road access. Development of this site would require acquiring easements through private property. The EA provides a sufficient basis for concluding that land needed for a proposed public facility cannot be obtained at alternative sites within the Bend UGB. Boundary Location The location of the urban growth boundary and changes to the boundary shall be determined by evaluating alternative boundary locations consistent with ORS 197.298 and with consideration of the following factors: FINDING: This criterion requires an evaluation of alternative boundary locations consistent with ORS 197.298. This discussion is detailed below. 1. Efficient accommodation of identified land needs; FINDING: DNF has identified a need to consolidate multiple Forest Service Operations at a single site to increase efficiency and reduce costs. The subject property will have ready access to necessary utilities such as sewer and water, and easy access to an arterial (Empire) and highway (Highway 97). Additionally, the 26-acre BPWC site is large enough to accommodate all of the applicant's administrative functions. PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 12 The record shows that the DNF has demonstrated efficient accommodation of an identified land need. 2. Orderly and economic provision of public facilities and services; FINDING: Public facilities and services are available to the site. Avion water currently serves the existing Forest Service operations on-site. A City sewer interceptor exists along the south property line and the North Unit Canal. If the UGB expansion is approved, DNF will extend and connect to these utilities. Fire protection service would be provided by the Bend Fire Department, with police service provided by the Bend Police Department. The record shows that stormwater runoff will be contained on-site. The subject property has frontage along, and existing access to, Deschutes Market Road, a publicly dedicated road.Z With regard to traffic impacts, a traffic study in the record (Ferguson & Associates, Inc.; February 2008) reached the following conclusions: • The project is forecast to generate 172 AM peak hour trips, 164 PM peak hour trips, and 1,394 daily trips. The warrant for adding a northbound left-turn lane on Deschutes Market Road to the entrance of the site was met for the year 20083 with the project during the a.m. and p.m. peak hour for both driveways4. The proposed driveway with left-turn lane for northbound traffic would meet City of Bend operational standards for the years 2011 and 2024 for both AM and PM peak hours. City of Bend Standards and Specifications are met for all study intersections with two exceptions: 1. The intersection of Deschutes Market Road and Butler Market Road would not meet City of Bend operational standards for PM peak hour traffic for the year 2008 with or without the project. Traffic signal warrants for both AM and PM peak traffic would be met for the year 2024 with or without the project. 2. The intersection of Butler Market Road at 27th Street would not meet City of Bend operational standards for PM peak hour traffic for the year 2024 with or without the project. • Traffic mitigation improvements for intersections not meeting City standards 2 If the UGB expansion is approved, Deschutes Market Road along the frontage of the subject property would become a city facility. 3 The traffic study was completed in 2008 with an expected construction completion date in 2008. Therefore, the traffic study references the project year as 2008. For the purposes of this staff report, the project year is 2011. 4 The original proposal contemplated two access driveways from Deschutes Market Road, one at the southern end of the site near the North Unit Canal and one at the northern end. The revised Master Site Plan submitted on December 2, 2008 shows only the north driveway. The revised plan still proposes a northbound left-turn lane on Deschutes Market Road to the subject property. PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 13 include: 1. A southbound right-turn lane on Deschutes Market Road at the Butler Market Road intersection will meet the City of Bend operational standards for 2008. 2. The City of Bend has a long term plan to widen 27th Street to five lanes at the intersection with Butler Market Road and extend 27th Street north to connect with Empire Avenue. The added capacity of a five-lane cross section on 27th Street would offset anticipated traffic impacts. • The applicant expects to pay their commensurate share of the above improvements. Subsequent to this traffic study, DNF and the City worked on transportation mitigation measures to address the deficiencies at the intersections of Deschutes Market Road/Butler Market Road and Butler Market Road/27th Street. Asa result of these negotiations, DNF has agreed to the following: Pay $130,000 to the City for the construction of the southbound right-turn lane at Deschutes Market Road/Butler Market Road.S This improvement would meet the City of Bend operational standards for the project year. Pay $253,100 to fund future roundabout improvements to the Butler Market Road/Deschutes Market Road and Butler Market Road/27th Street intersections. According to the letter from Mr. Nick Arnis, City Transportation Manager, with this contribution, in addition to the collection of system development charges and future anticipated proportionate share contributions from other developments, the planned transportation improvements for the Butler Market Road/Deschutes Market Road and Butler Market Road/27th Street intersections are reasonably likely to be provided by the end of the planning period. These two intersections are under the jurisdictional responsibility of the City and are identified in the City's Transportation System Plan as planned facilities. • Pay $68,152.60 for DNF's proportionate share of the Empire Road Corridor Project. All of this information indicates that public facilities will be adequate to accommodate the proposed use. The record shows that although the traffic study was conducted in 2008, and the application relies on that study, there is no evidence in the record that circumstances have changed significantly such that the analysis in the 2008 study would no longer be sufficient to respond to Goal 14. In fact, testimony at the public hearing indicated that due to the economic downturn beginning in 2008, demand for capacity in and around the roadways in question is 5 Based on staffs conversation with Mr. Colin Stephens, City Planning Manager, the city plans a sewer pipeline improvement project along the Butler Market Road right-of-way. Rather than have DNF construct the turn lane and then have the pipeline project impact the roadway improvement, DFN has agreed to pay for the city to construct the roadway improvement either after or concurrently with the pipeline project. Reference April 6, 2011 memo from Ms. Mary Winters, City Attorney, and Mr. Stephens attached to April 6, 2011 email from Mr. Nick Lelack. PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 14 likely to have decreased from 2008 to the time of this decision. 3. Comparative environmental, energy, economic and social consequences; FINDING: The environmental, economic, social and energy consequences resulting from the proposed amendments and expansion of existing DNF operations at the site are discussed below. Environmental: The 26-acre expansion site is flat and currently developed with the Bend Pine Work Center, including a number of existing structures. No known rare or endangered species occupy the site, and the site does not possess any significant natural features such as wetlands, waterways (the North Unit Canal borders the site to the south), or rim rock. Stormwater runoff will be contained on-site. The record shows that the proposed amendments and DNF co-location of operations will have no significant adverse impact on the environment. Enemy: The BPWC site is not known to contain energy resources such as known deposits of oil and natural gas, or geothermal resources. The availability of other potential energy sources, such as wind and solar, is equal to any other property in the surrounding area. Since the site will allow the co-location of numerous administrative and operational functions at a single site, employee trips between the four existing sites will be greatly reduced. Therefore, the proposed amendments and DNF co-location of operations will not have a significant adverse impact on energy resources. Economic: According to the EA, both the Forest Headquarters and Bend-Fort Rock (BFR) offices are leased. The combined lease payment for these two locations is approximately $1,000,000 per year. The proposed UGB expansion and co-location will allow DNF to save that money for their operations. Additionally, the co-location will reduce travel time and costs associated with DNF personnel commuting between the four existing sites. The proposed co-location will provide an economic benefit to DNF and the public. Social: The Statewide Planning Goals define Social Consequences as follows: The tangible and intangible effects upon people and their relationships with the community in which they live resulting from a particular action or decision. According to the record, one tangible effect will be increased traffic. An intangible effect could include a feeling from the community that the development is significantly more intense than what would be expected given the predominantly residential and community park uses that surround the site. An additional intangible effect could be an increased level of frustration from the community due to increased vehicle trips. However, once the proposed amendments are approved, the subject property will be annexed into the City and zoned PF to allow greater development density, and as discussed in the findings above, DNF will contribute to the cost of transportation facility improvements. PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 15 For all these reasons, I find that the Environmental Assessment is sufficient to demonstrate the comparative environmental, energy, economic and social consequences of DNF's project were considered. 4. Compatibility of the proposed urban uses with nearby agricultural and forest activities occurring on farm and forest land outside the UGB. FINDING: The BPWC site is not located near agricultural or forest activities. The site is surrounded on the north and west side by the Pine Nursery community park, on the east side by Deschutes Market Road and rural residential uses on UAR-zoned lands, and on the south by the North Unit Canal and urban residential development on lands within the City of Bend zoned RS (Urban Standard Residential). The record shows that the proposed amendments or co-location will not adversely impact farm and forest land outside the UGB. Urbanizable Land Land within urban growth boundaries shall be considered available for urban development consistent with plans for the provision of urban facilities and services. Comprehensive plans and implementing measures shall manage the use and division of urbanizable land to maintain its potential for planned urban development until appropriate public facilities and services are available or planned. FINDING: Both the City and the County have developed comprehensive plans and implementing ordinances to manage the use and division of urbanizable land in order to maintain its potential for planned urban development. Based on all the information in the record, the proposal is consistent with those plans. Unincorporated Communities FINDING: The expansion site is not located within an unincoporated community. Single-Family Dwellings in Exception Areas FINDING: No single-family dwellings are proposed. Rural Industrial Development FINDING: No industrial development is proposed. 12. Goal 15: Willamette River Greenway; Goal 16: Estuarine Resources; Goal 17: Coastal Shorelands; Goal 18: Beaches and Dunes; Goal 19: Ocean Resources PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 16 FINDING: These Goals are not applicable. B. Oregon Revised Statutes, 197.298 Priority of Land to be Included Within Urban Growth Boundary. (1) In addition to any requirements established by rule addressing urbanization, land may not be included within an urban growth boundary except under the following priorities: (a) First priority is land that is designated urban reserve land under ORS 195.145, rule or metropolitan service district action plan. (b) If land under paragraph (a) of this subsection is inadequate to accommodate the amount of land needed, second priority is land adjacent to an urban growth boundary that is identified in an acknowledged comprehensive plan as an exception area or nonresource land. Second priority may include resource land that is completely surrounded by exception areas unless such resource land is high-value farmland as described in ORS 215.710. FINDING: As noted in foregoing findings, Goal 14 requires the proposed expansion to be consistent with ORS 197.298. Although the subject property is designated as Urban Area Reserve in both the Bend Area General Plan and the Deschutes County Comprehensive Plan, these lands were not designated under ORS 195.145. Rather, these lands were designated prior to implementation of ORS 195 and, therefore, the City does not have any `first priority' lands available for the proposed need-specific UGB expansion. The subject property is considered an exception area and consequently is categorized as a `second priority' land, which is the highest priority land available. (c) If land under paragraphs (a) and (b) of this subsection is inadequate to accommodate the amount of land needed, third priority is land designated as marginal land pursuant to ORS 197.247 (1991 Edition). (d) If land under paragraphs (a) to (c) of this subsection is inadequate to accommodate the amount of land needed, fourth priority is land designated in an acknowledged comprehensive plan for agriculture or forestry or both. FINDING: Because the subject property is classified as second priority, these sections do not apply. (2) Higher priority shall be given to land of lower capability as measured by the capability classification system or by cubic foot site class, whichever is appropriate for the current use. PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 17 FINDING: The EA included in the record indicates the soils on the subject property "are mainly Deskamp series," described as loamy sands for which wind erosion and high permeability are concerns. The EA states "manure and chemicals were added to the soils during the former nursery operations." The EA also states that with the proposed development of the site, approximately 10 acres of soil would be placed in a non- productive state due to construction of buildings, and the remaining approximately 16 acres would be landscaped and irrigated to maintain soil productivity. The record does not indicate the National Resource Conservation Service (NRCS) capability rating or classification for these soils or how those ratings compare with ratings for soils on other potential sites. It is likely that the without the soil amendments that have occurred over time, that the soil capability of the subject site would be no better than the alternative sites considered. This provision is met. (3) Land of lower priority under subsection (1) of this section may be included in an urban growth boundary if land of higher priority is found to be inadequate to accommodate the amount of land estimated in subsection (1) of this section for one or more of the following reasons; (a) Specific types of identified land needs cannot be reasonably accommodated on higher priority lands; (b) Future urban services could not be provided to the higher priority due to topographical or other physical constraints; or, (c) Maximum efficiency of land uses within a proposed urban growth boundary requires inclusion of lower priority lands in order to include or to provide services to higher priority lands. FINDING: As discussed above, there is no first priority land, and the subject property constitutes second priority land and the highest priority land available. C. Oregon Administrative Rules (ORS) 1. Section 660-004-0010, Application of the Goal 2 Exception Process to Certain Goals. C. When a local government changes an established urban growth boundary applying Goal 14 as amended April 28, 2005, a goal exception is not required unless the local government seeks an exception to any of the requirements of Goal 14 or other applicable goals. FINDING: The County has applied Goal 14 as amended April 28, 2005. Since the applicant does not seek any goal exception, a goal exception is not required for the proposed UGB expansion. 2. Section 660-012-0060, Plan and Land Use Regulation Amendments. (1) Where an amendment to a functional plan, an acknowledged PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 18 comprehensive plan, or a land use regulation would significantly affect an existing or planned transportation facility, the local government shall put in place measures as provided in section (2) of this rule to assure that allowed land uses are consistent with the identified function, capacity, and performance standards (e.g. level of service, volume to capacity ratio, etc.) of the facility. A plan or land use regulation amendment significantly affects a transportation facility if it would: (a) Change the functional classification of an existing or planned transportation facility (exclusive of correction of map errors in an adopted plan); (b) Change standards implementing a functional classification system; or (c) As measured at the end of the planning period identified in the adopted transportation system plan: (A) Allow land uses or levels of development that would result in types or levels of travel or access that are inconsistent with the functional classification of an existing or planned transportation facility; (B) Reduce the performance of an existing or planned transportation facility below the minimum acceptable performance standard identified in the TSP or comprehensive plan; or (C) Worsen the performance of an existing or planned transportation facility that is otherwise projected to perform below the minimum acceptable performance standard identified in the TSP or comprehensive plan. (2) Where a local government determines that there would be a significant effect, compliance with section (1) shall be accomplished through one or a combination of the following: (a) Adopting measures that demonstrate allowed land uses are consistent with the planned function, capacity, and performance standards of the transportation facility. (b) Amending the TSP or comprehensive plan to provide transportation facilities, improvements or services adequate to support the proposed land uses consistent with the requirements of this division; such amendments shall include a funding plan or mechanism consistent with section (4) or include an amendment to the transportation finance plan so that the facility, improvement, or service will be provided by the end of the planning period. (c) Altering land use designations, densities, or design requirements to reduce demand for automobile travel and meet travel needs through other modes. (d) Amending the TSP to modify the planned function, capacity or performance standards of the transportation facility. PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 19 (e) Providing other measures as a condition of development or through a development agreement or similar funding method, including transportation system management measures, demand management or minor transportation improvements. Local governments shall as part of the amendment specify when measures or improvements provided pursuant to this subsection will be provided. (3) Notwithstanding sections (1) and (2) of this rule, a local government may approve an amendment that would significantly affect an existing transportation facility without assuring that the allowed land uses are consistent with the function, capacity and performance standards of the facility where: (a) The facility is already performing below the minimum acceptable performance standard identified in the TSP or comprehensive plan on the date the amendment application is submitted; (b) In the absence of the amendment, planned transportation facilities, improvements and services as set forth in section (4) of this rule would not be adequate to achieve consistency with the identified function, capacity or performance standard for that facility by the end of the planning period identified in the adopted TSP; (c) Development resulting from the amendment will, at a minimum, mitigate the impacts of the amendment in a manner that avoids further degradation to the performance of the facility by the time of the development through one or a combination of transportation improvements or measures; (d) The amendment does not involve property located in an interchange area as defined in paragraph (4)(d)(C); and (e) For affected state highways, ODOT provides a written statement that the proposed funding and timing for the identified mitigation improvements or measures are, at a minimum, sufficient to avoid further degradation to the performance of the affected state highway. However, if a local government provides the appropriate ODOT regional office with written notice of a proposed amendment in a manner that provides ODOT reasonable opportunity to submit a written statement into the record of the local government proceeding, and ODOT does not provide a written statement, then the local government may proceed with applying subsections (a) through (d) of this section. (4) Determinations under sections (1)-(3) of this rule shall be coordinated with affected transportation facility and service providers and other affected local governments. (a) In determining whether an amendment has a significant effect on an existing or planned transportation facility under PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 20 subsection (1)(c) of this rule, local governments shall rely on existing transportation facilities and services and on the planned transportation facilities, improvements and services set forth in subsections (b) and (c) below. (b) Outside of interstate interchange areas, the following are considered planned facilities, improvements and services: (A) Transportation facilities, improvements or services that are funded for construction or implementation in the Statewide Transportation Improvement Program or a locally or regionally adopted transportation improvement program or capital improvement plan or program of a transportation service provider. (B) Transportation facilities, improvements or services that are authorized in a local transportation system plan and for which a funding plan or mechanism is in place or approved. These include, but are not limited to, transportation facilities, improvements or services for which: transportation systems development charge revenues are being collected; a local improvement district or reimbursement district has been established or will be established prior to development; a development agreement has been adopted; or conditions of approval to fund the improvement have been adopted. (C) Transportation facilities, improvements or services in a metropolitan planning organization (MPO) area that are part of the area's federally-approved, financially constrained regional transportation system plan. (D) Improvements to state highways that are included as planned improvements in a regional or local transportation system plan or comprehensive plan when ODOT provides a written statement that the improvements are reasonably likely to be provided by the end of the planning period. (E) Improvements to regional and local roads, streets or other transportation facilities or services that are included as planned improvements in a regional or local transportation system plan or comprehensive plan when the local government(s) or transportation service provider(s) responsible for the facility, improvement or service provides a written statement that the facility, improvement or service is reasonably likely to be provided by the end of the planning period. FINDING: The traffic study identifies impacts to Deschutes Market Road, the intersection of Deschutes Market Road/Butler Market Road, and the intersection of PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 21 Butler Market Road/271h Street that would reduce the performance of these existing transportation facilities. The traffic study also identifies a number of mitigation measures to address these impacts: A northbound left-turn lane on Deschutes Market Road to the site would meet City of Bend operational standards for the years 2008 and 2024 for both AM and PM peak hours. 2. A southbound right-turn lane on Deschutes Market Road at the Butler Market Road intersection would meet the City of Bend operational standards for 2008. 3. The City of Bend has a long term plan to widen 27th Street to five lanes at the intersection with Butler Market Road and extend 27th Street north to connect with Empire Avenue. As previously detailed, DNF proposes to construct the northbound left-turn lane and pay the City to construct the southbound right-turn lane. To address future improvements to the Butler Market Road/27th Street and Butler Market Road/Deschutes Market Road intersections, the City proposes the following findings (see January 28, 2011 letter from Mr. Stephens), The City of Bend's Transportation System Plan (TSP) states that where arterial streets intersect other arterial streets, traffic signals or roundabouts are to be installed (6.5.2.1). Deschutes Market Road, Butler Market Road, 27th Street and Empire Street are all classified as arterial streets in the TSP. The Bend City Council's Transportation Implementation Plan contains a policy that directs staff to consider roundabouts as the preferred intersection option. The planned improvement to the Butler Market/27th Street Intersection is a double-lane roundabout. The planned improvement to the Butler Market/Deschutes Market intersection is also a roundabout. These two intersections are under the jurisdictional responsibility of the City of Bend and are included in the City's TSP as planned facilities. When the roundabouts described above are constructed, they will operate within the acceptable level of service with the addition of the trips produced by re-designating and rezoning the Forest Service site from Urban Area Reserve (UAR) to Public Facilities (PF). Under Oregon Administrative Rule (OAR) Transportation Planning Rule (TPR) section 660.012.0060(4)(b)(E) these intersections are considered "planned "facilities when the jurisdiction responsible for the facilities provides a statement in writing that the improvements are reasonably likely to be provided by the end of the planning period. On January 28, 2011 the City of Bend provided a letter to Deschutes County stating that these facilities are reasonably likely to be provided by the end of the planning period. The funding to construct these improvements will come from a combination of the calculated proportionate share payment of $251,100 from the Forest Service to the City to ameliorate the impacts of their new trips, System Development Charge (SDC) collections and `proportionate share contributions" from future development authorized PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 22 under Bend Development Code section 4.7.400 C. and 4.7.500 B. which require a development to pay the incremental cost of the final intersection improvements needed to accommodate the new trips generated by the development. This payment is made at the time of site plan review or subdivision approval. Under ORS 660.012.0060(4)(b)(E), the City of Bend provided a written statement that the improvements to Deschutes Market Road/Butler Market Road intersection and the 27th Street/Butler Market Road intersection are reasonably likely to be provided by the end of the planning period. Therefore, there is no "significant effect" on these facilities under ORS 660.012.0060(1) and the Transportation Planning Rule is satisfied. The information in the traffic study and the identified mitigation measures are sufficient to demonstrate that the requirements of the Transportation Planning Rule are be met. 3. Section 660-024-0000, Purpose and Applicability. (1) The rules in this division clarify procedures and requirements of Goal 14 regarding local government adoption or amendment of an urban growth boundary (UGB). (3) The rules in this division are effective April 5, 2007, except as follows: (a) A local government may choose to apply this division prior to April 5, 2007; (b) A local government may choose to not apply this division to a plan amendment concerning the evaluation or amendment of a UGB, regardless of the date of that amendment, if the local government initiated the evaluation or amendment of the UGB prior to April 5, 2007; FINDING: These rules became effective April 5, 2007. The proposed plan amendment application for the UGB expansion was submitted on April 7, 2011, therefore, these rules apply. 4. Section 660-024-0020, Adoption or Amendment of a UGB (1) All statewide goals and related administrative rules are applicable when establishing or amending a UGB, except as follows: (a) The exceptions process in Goal 2 and OAR 660, division 4, is not applicable unless a local government chooses to take an exception to a particular goal requirement, for example, as provided in OAR 660-004-0010(1); FINDING: The applicant is not seeking any goal exception. (b) Goals 3 and 4 are not applicable; PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 23 FINDING: Goals 3 and 4 are not applicable. (c) Goal 5 and related rules under OAR 660, division 23, apply only in areas added to the UGB, except as required under OAR 660-023-0070 and 660-023-0250; FINDING: As noted in foregoing findings, there are no Goal 5 resources impacted by the proposed expansion area. (d) The transportation planning rule requirements under OAR 660-012-0060 need not be applied to a UGB amendment if the land added to the UGB is zoned as urbanizable land, either by retaining the zoning that was assigned prior to inclusion in the boundary or by assigning interim zoning that does not allow development that would generate more vehicle trips than development allowed by the zoning assigned prior to inclusion in the boundary; FINDING: As noted in foregoing findings, the 26-acre expansion site is currently zoned UAR10, and the applicant proposes a zone change to Public Facilities which would allow more vehicle trips. Staff concluded, and I agree that OAR 660-012-0060 applies and is satisfied. (e) Goal 15 is not applicable to land added to the UGB unless the land is within the Willamette River Greenway Boundary; FINDING: Goal 15 is not applicable. (f) Goals 16 to 18 are not applicable to land added to the UGB unless the land is within a coastal shorelands boundary; FINDING: Goals 16 and 18 are not applicable. (g) Goal 19 is not applicable to a UGB amendment. FINDING: Goal 19 is not applicable. (2) The UGB and amendments to the UGB must be shown on the City and County plan and zone maps at a scale sufficient to determine which particular lots or parcels are included in the UGB. Where a UGB does not follow lot or parcel lines, the map must provide sufficient information to determine the precise UGB location. FINDING: Several maps included in the record illustrate the property to be added. Staff believes the maps provide sufficient information to determine the precise UGB location. This criterion is met. PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 24 Section 660-024-0030, Population Forecasts (1) Counties must adopt and maintain a coordinated 20-year population forecast for the county and for each urban area within the county consistent with statutory requirements for such forecasts under ORS 195.025 and 195.036. Cities must adopt a 20-year population forecast for the urban area consistent with the coordinated county forecast, except that a metropolitan service district must adopt and maintain a 20-year population forecast for the area within its jurisdiction. In adopting the coordinated forecast, local governments must follow applicable procedures and requirements in ORS 197.610 to 197.650 and must provide notice to all other local governments in the county. The adopted forecast must be included in the comprehensive plan or in a document referenced by the plan. FINDING: The County adopted a coordinated population forecast through 2025 on September 8, 2004 (reference Ordinance 2004-12). The City adopted the same forecast. These are sufficient to demonstrate compliance with this section. 6. Section 660-024-0040, Land Need (1) The UGB must be based on the adopted 20-year population forecast for the urban area described in OAR 660-024-0030, and must provide for needed housing, employment and other urban uses such as public facilities, streets and roads, schools, parks and open space over the 20- year planning period consistent with the land need requirements of Goal 14 and this rule. The 20-year need determinations are estimates which, although based on the best available information and methodologies, should not be held to an unreasonably high level of precision. FINDING: The City and County are currently evaluating all of the above-referenced needs as part of a larger legislative UGB expansion plan. Delays in the legislative UGB expansion process have necessitated this need-specific UGB expansion request. As noted previously, the City is concurrently processing a zone change to Public Facilities (PF). Additionally, one of the stated characteristics in the alternative sites analysis was that the site must be owned by the Forest Service. None of the five Forest Service-owned sites which were analyzed is currently zoned PF. The record shows that there are no existing PF-zoned lands available for the proposed use. Subsection (3) of this section allows for need-specific UGB expansion. (2) If the UGB analysis or amendment is conducted as part of a periodic review work program, the 20-year planning period must commence on the date initially scheduled for completion of the appropriate work PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 25 task. If the UGB analysis or amendment is conducted as a post- acknowledgement plan amendment under ORS 197.610 to 197.625, the 20-year planning period must commence either: (a) On the date initially scheduled for final adoption of the amendment specified by the local government in the initial notice of the amendment required by OAR 660-018-0020; or (b) If more recent than the date determined in subsection (a), at the beginning of the 20-year period specified in the coordinated population forecast for the urban area adopted by the City and County pursuant to OAR 660-024-0030, unless ORS 197.296 requires a different date for local governments subject to that statute. FINDING: In a prior Hearings Officer's decision for a quasi-judicial plan amendment to expand the City of Bend UGB for a school site (PA-07-5), the Hearings Officer found that this criterion did not apply because the applicant's proposal was not being requested as part of periodic review work program. I agree. (3) A local government may review and amend the UGB in consideration of one category of land need (for example, housing need) without a simultaneous review and amendment in consideration of other categories of land need (for example, employment need). FINDING: The applicant seeks to amend the UGB for a specific public facility need. No other needs are under review with this application. (4) The determination of 20-year residential land needs for an urban area must be consistent with the adopted 20-year coordinated population forecast for the urban area, and with the requirements for determining housing needs in Goal 10, OAR 660, division 7 or 8, and applicable provisions of ORS 197.295 to 197.314 and 197.475 to 197.490. FINDING: The proposed expansion is not for residential land needs. This criterion does not apply. (5) Except for a metropolitan service district described in ORS 197.015(14), the determination of 20-year employment land need for an urban area must comply with applicable requirements of Goal 9 and OAR 660, division 9, and must include a determination of the need for a short-term supply of land for employment uses consistent with OAR 660-009-0025. Employment land need may be based on an estimate of job growth over the planning period; local government must provide a reasonable justification for the job growth estimate but Goal 14 does not require that job growth estimates necessarily be proportional to population growth. PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 26 FINDING: The proposed expansion is not for employment land needs. This criterion does not apply. (6) The determination of 20-year land needs for transportation and public facilities for an urban area must comply with applicable requirements of Goals 11 and 12, rules in OAR 660, divisions 11 and 12, and public facilities requirements in ORS 197.712 and 197.768. The determination of school facility needs must also comply with ORS 195.110 and 197.296 for local governments specified in those statutes. FINDING: Consistency with Goals 11 and 12 are adequately addressed in foregoing findings. ORS 197.712 and 197.768 require an analysis of general public facilities such as sewer and water to be included in the Comprehensive Plans of cities and counties. Both the City and County plans include the required analysis. 7. Section 660-024-0050, Land Inventory and Response to Deficiency (1) When evaluating or amending a UGB, a local government must inventory land inside the UGB to determine whether there is adequate development capacity to accommodate 20- year needs determined in OAR 660-024-0040. For residential land, the buildable land inventory must include vacant and redevelopable land, and be conducted in accordance with OAR 660-007-0045 or 660-008- 0010, whichever is applicable, and ORS 197.296 for local governments subject to that statute. For employment land, the inventory must include suitable vacant and developed land designated for industrial or other employment use, and must be conducted in accordance with OAR 660-009-0015(3). FINDING: As noted above, the only need being evaluated by this specific UGB expansion application is the need for public facilities land to allow co-location of multiple DNF functions. Additionally, the City and County are currently evaluating a regional UGB expansion which would ensure a 20-year land supply for all other needs. (5) When land is added to the UGB, the local government must assign appropriate urban plan designations to the added land, consistent with the need determination. The local government must also apply appropriate zoning to the added land consistent with the plan designation, or may maintain the land as urbanizable land either by retaining the zoning that was assigned prior to inclusion in the boundary or by applying other interim zoning that maintains the land's potential for planned urban development until the land is rezoned for the planned urban uses. The requirements of ORS 197.296 regarding planning and zoning also apply when local governments specified in that statute add land to the UGB. PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 27 FINDING: As noted in foregoing findings, the proposed expansion area is currently zoned Urban Area Reserve, and has a Plan designation of Urban Reserve Area. Consistent with the specific need to provide land for an expanded public facility, the applicant is proposing a zone change to Public Facilities and a plan amendment change to Public Facilities. 8. Section 660-024-0060, Boundary Location Alternatives Analysis (1) When considering a UGB amendment, a local government must determine which land to add by evaluating alternative boundary locations. This determination must be consistent with the priority of land specified in ORS 197.298 and the boundary location factors of Goal 14, as follows: (a) Beginning with the highest priority of land available, a local government must determine which land in that priority is suitable to accommodate the need deficiency determined under 660-024-0050. FINDING: The proposed expansion area is designated as exception land, Urban Area Reserve. As noted in foregoing findings, although this land is classified as `second priority', it is the highest priority land available for consideration when expanding the City of Bend's UGB. (b) If the amount of suitable land in the first priority category exceeds the amount necessary to satisfy the need deficiency, a local government must apply the location factors of Goal 14 to choose which land in that priority to include in the UGB. (c) If the amount of suitable land in the first priority category is not adequate to satisfy the identified need deficiency, a local government must determine which land in the next priority is suitable to accommodate the remaining need, and proceed using the same method specified in subsections (a) and (b) of this section until the land need is accommodated. FINDING: As discussed previously, there are no `first priority' lands available. The subject 26-acre site is considered a second priority land that is of sufficient size to accommodate the need. (2) Notwithstanding OAR 660-024-0050(4) and subsection (1)(c) of this rule, except during periodic review or other legislative review of the UGB, a local government may approve an application under ORS 197.610 to 197.625 for a UGB amendment proposing to add an amount of land less than necessary to satisfy the land need deficiency determined under OAR 660-024-0050(4), provided the amendment complies with all other applicable requirements. PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 28 FINDING: The proposed expansion is need- and site-specific, and would not satisfy the 20-year land need. As noted in foregoing findings, the City and County are evaluating the amount of land necessary to satisfy the 20-year land need as part of a regional UGB expansion. (3) The boundary location factors of Goal 14 are not independent criteria. When the factors are applied to compare alternative boundary locations and to determine the UGB location, a local government must show that all the factors were considered and balanced. FINDING: The boundary location factors of Goal 14 are addressed in foregoing findings. (4) In determining alternative land for evaluation under ORS 197.298, "land adjacent to the UGB" is not limited to those lots or parcels that abut the UGB, but also includes land in the vicinity of the UGB that has a reasonable potential to satisfy the identified need deficiency. FINDING: As identified in the EA, the Forest Service analyzed five Forest Service- owned sites for the proposed co-location (Bend Pine Work Center, Cascade Lakes, Scott Street, Knott Road, and China Hat Road). Although the Scott Street site is already within the City limits, the site is not large enough to accommodate the proposed use. The remaining four sites are all outside of the Bend UGB, with only the Bend Pine Work Center abutting the UGB. This criterion is been met. (5) If a local government has specified characteristics such as parcel size, topography, or proximity that are necessary for land to be suitable for an identified need, the local government may limit its consideration to land that has the specified characteristics when it conducts the boundary location alternatives analysis and applies ORS 197.298. FINDING: Previous findings discussed the specific characteristics used to evaluate a number of alternative sites for the identified need. (6) The adopted findings for UGB adoption or amendment must describe or map all of the alternative areas evaluated in the boundary location alternatives analysis. If the analysis involves more than one parcel or area within a particular priority category in ORS 197.298 for which circumstances are the same, these parcels or areas may be considered and evaluated as a single group. FINDING: The submitted EA describes and maps all five of the alternative sites. (7) For purposes of Goal 14 Boundary Location Factor 2, "public PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 29 facilities and services" means water, sanitary sewer, storm water management, and transportation facilities. FINDING: Water, sewer, storm water management and transportation facilities are adequately addressed above in the findings for Goal 14 Boundary Location Factor 2. (8) The Goal 14 boundary location determination requires evaluation and comparison of the relative costs, advantages and disadvantages of alternative UGB expansion areas with respect to the provision of public facilities and services needed to urbanize alternative boundary locations. This evaluation and comparison must be conducted in coordination with service providers, including the Oregon Department of Transportation with regard to impacts on the state transportation system. "Coordination" includes timely notice to service providers and the consideration of evaluation methodologies recommended by service providers. The evaluation and comparison must include: (a) The impacts to existing water, sanitary sewer, storm water and transportation facilities that serve nearby areas already inside the UGB; (b) The capacity of existing public facilities and services to serve areas already inside the UGB as well as areas proposed for addition to the UGB; and FINDING: The application materials include a "will serve" letter from Avion for water service. The City and DNF have reached an agreement to provide sewer service to the subject property. The submitted traffic study indicates necessary road improvements to mitigate expected impacts. Foregoing findings show that DNF will mitigate anticipated transportation impacts including constructing a northbound left-turn lane on Deschutes Market Road, paying the City to construct the southbound right-turn lane at Deschutes Market Road/Butler Market Road, and contributing monies to fund future improvements at the Butler Market Road/27th Street and Butler Market Road/Deschutes Market Road intersections. Fire protection service will be provided by the Bend Fire Department, with police services provided by the City of Bend Police Department. These criterion are met. (c) The need for new transportation facilities, such as highways and other roadways, interchanges, arterials and collectors, additional travel lanes, other major improvements on existing roadways and, for urban areas of 25,000 or more, the provision of public transit service. FINDING: The traffic analysis identifies a number of necessary improvements to mitigate traffic impacts including: 1. A northbound left-turn lane on Deschutes Market Road to the site will meet City of Bend operational standards for the years 2008 and 2024 for PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 30 both AM and PM peak hours. 2. A southbound right-turn lane on Deschutes Market Road at the Butler Market Road intersection will meet the City of Bend operational standards for 2008. 3. The City of Bend has a long term plan to widen 27th Street to five lanes at the intersection with Butler Market Road and extend 27th Street north to connect with Empire Avenue. As discussed above, DNF will construct the left-turn lane, paying the City to construct the right-turn lane, contribute monies to fund future improvements at the Butler Market Road/271h Street and Butler Market Road/Deschutes Market Road intersections. For these reasons, I find that the necessary transportation facility improvements have been addressed. D. Title 19, Bend Urban Growth Boundary Zoning Ordinance 1. Chapter 19.12, Urban Area Reserve Zone. FINDING: The applicant proposes a zone change from UAR10 to Public Facilities. 2. Section 19.116.010, Amendments. B. Any proposed quasi-judicial map amendment or change shall be handled in accordance with the applicable provisions of DCC Title 22. FINDING: The applicable provisions of Title 22 are addressed below. 3. Section 19.116.020, Standards for Zone Change. The burden of proof is upon the applicant. The applicant shall in all cases establish: A. That the change conforms with the Comprehensive Plan. Specifically, the change is consistent with the plan's intent to promote an orderly pattern and sequence of growth. FINDING: The applicable policies of the Comprehensive Plan regarding urban growth boundaries and public facilities and services are addressed below. I find that the information provided in the staff report is substantial evidence that an orderly pattern and sequence of growth will occur. Specifically, the zone change to Public Facilities will more accurately reflect the existing and future DNF uses on-site. Additionally, the DNF project will provide for necessary improvements to City roadway facilities. B. That the change will not interfere with existing development, development potential or value of other land in the vicinity of the proposed action. PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 31 FINDING: The subject property is currently used for a portion of DNF's operations. While future consolidation of DNF operations could result in an increase in traffic, these impacts would likely be mitigated via construction and funding of City roadway improvements. There is no information in the record to suggest that the proposed zone change will interfere with existing development, development potential, or value of other land in the vicinity of the proposed action. C. That the change in classification for the subject property is consistent with the purpose and intent of the proposed zone classification. FINDING: As noted above, the current UAR10 zoning does not allow the consolidation of DNF operations on-site. Staff concluded, and I agree, that the proposed zone change to Public Facilities will accurately reflect existing and future DNF uses on-site. D. That the change will result in the orderly and efficient extension or provision of public services. Also, that the change is consistent with the County's policy for provision of public facilities. FINDING: The record includes a "will serve" letter from Avion Water. The City and DNF have reached an agreement to facilitate connection to City sewer. The subject property is served by Bend Fire Department and will be served by the City of Bend Police Department. The specific Comprehensive Plan policies for provision of public facilities are addressed below. E. That there is proof of a change of circumstance or a mistake in the original zoning. FINDING: The subject property has been in use since the late 1940s by DNF, primarily as their plant nursery. The nursery use was discontinued in 1999, with DNF warehousing and other support operations continuing at the site. The close of the nursery use allowed for other uses and development on the property. As demonstrated in the EA, the Forest Service has expressed a desire and need to own rather than lease or rent property for their multiple operations sites, and consolidate operations at a single location. These changes in circumstance reasonably warrant the proposed zone change. FINDING: The applicable provisions of Title 22 are addressed below. E. Title 22, Deschutes County Development Procedures Ordinance Section 22.28.030, Land Use Action Decisions Decision on plan amendments and zone changes. B. In considering all quasi-judicial zone changes and those quasi-judicial plan amendments on which the Hearings Officer has authority to PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 32 make a decision, the Board of County Commissioners shall, in the absence of an appeal or review initiated by the Board, adopt the Hearings Officer's decision. No argument or further testimony will be taken by the Board. FINDING: A public hearing before the Hearings Officer was held May 2, 2011. F. Title 23, the Deschutes County Comprehensive Plan Section 23.48.030. Urban Growth Boundary Policies. 1. Urbanization. Urbanization policies refer to unincorporated urban growth areas within an urban growth boundary but outside the boundaries of a City, and are intended to assist in the decision making about the conversion of rural to urban uses, and to help in the development of consistent urban area plan. More detailed policies for the urban areas of Bend, Redmond and Sisters are specified in the urban area plans and they shall be the primary documents for coordination and land use decisions in their respective areas. b. Urban growth boundaries shall be established or expanded based upon the following: 1. Demonstrated need to accommodate long-range urban population growth requirements consistent with LCDC goals; 2. Need for housing, employment opportunities and livability; 3. Orderly and economic provision for public facilities and services; 4. Maximum efficiency of land uses within and on the fringe of the existing urban area; 5. Environmental, energy, economic and social consequences; 6. Retention of agricultural land as defined, with Class I being the highest priority for retention and Class VI the lowest priority; and, 7. Compatibility of the proposed urban uses with nearby agricultural activities. FINDING: These criteria are adequately addressed by the findings for Goal 14 and related goals, statutes and rules discussed above and I incorporate those findings here by this reference. Conformance with the Bend Area General Plan is discussed below. 8. Facilities and services. a. Efforts should be made over a sustained period of time to place utility lines underground in PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 33 existing and new residential areas. b. Parks should be located within walking distance of every dwelling unit in the community. Parks should be centrally located and easily accessible to the areas they are intended to serve (see Recreation). C. Certain private recreational uses such as golf courses or riding stables can be successfully integrated into residential areas provided the location, design and operation are compatible with surrounding residential developments. d. Fire protection in the planning area should be considered as a common problem by the City, County, water district and the fire protection district, and equipment should reflect the character of land uses in the community. e. Efforts should be made to encourage Federal and State agencies to locate in urban areas. f. Efforts should be made to group public offices in a more or less common location as a convenience to the public. FINDING: Staff concluded, and I agree, that policies 8(a-d) do not apply. If approved, the UGB expansion will allow the consolidation of multiple Forest Service functions onto a single location within the Bend UGB. 2. Section 23.68.020, Public Facilities and Services Policies. 1. General. a. Public facilities and services shall be provided at levels and in areas appropriate for such uses based upon the carrying capacity of the land, air and water, as well as the important distinction that must be made between urban and rural services. In this way public services may guide development while remaining in concert with the public's needs. FINDING: The record includes a "will serve" letter from Avion Water. The City and DNF have reached an agreement to facilitate connection to City sewer. The subject property is served by Bend Fire Department and would be served by City of Bend Police Department. As part of the co-location project, DNF proposes to construct roadway improvements on Deschutes Market Road and Butler Market Road, and contribute monies to fund future improvements on Butler Market Road. According to the EA, the subject property is large enough to accommodate DNF's proposed co-location. Staff concluded, and I agree, that public facilities and services will be provided at sufficient levels to serve the DNF project. PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 34 b. While clear distinctions are not always possible between urban and rural services, those facilities (such as sewage treatment plants, water systems, schools and fire stations), which are necessary to service concentrations of people shall be known as key facilities and shall be located in urban areas or in rural service centers, if necessary, to meet the needs of existing rural residents. Key facilities shall be built to encourage urban, rather than increased rural, residential development. Rural services such as sheriff's patrol, snowplowing, schools and school busing shall be kept at levels adequate to meet public needs but not in excess to encourage additional development. Rural Service Centers are a logical location for future rural key facilities so that services may be used and constructed in as efficient a manner as possible (see Rural Development Chapter). Key facilities outside urban areas or Rural Service Centers shall be discouraged unless the facility is needed to serve existing development, is at the most efficient and economic location and is consistent with the capabilities of the land and the planned growth of the County. FINDING: No key facilities, as defined above, are proposed. This criterion does not apply. C. Future development shall depend on the availability of adequate local services in close proximity to the proposed site. Higher densities may permit the construction of more adequate services than might otherwise be true. Cluster and planned development shall be encouraged. FINDING: A water pipeline for Avion Water exists within the Deschutes Market Road right-of-way, allowing for efficient connection. A City sewer pipeline runs along the southern boundary of the property also allowing for efficient connection. The subject property is already within the Bend Rural Fire Protection District, allowing for easy annexation into the Bend (City) Fire Protection District. To the south are residential lots within the City limits that are currently served by the Bend Police Department. Staff concluded, and I agree, that the proximity of the subject property to lands already served by Bend Police would make inclusion of the subject property reasonable. d. The County shall prepare a Capital Improvements Plan which considers the costs and benefits of construction at various sites. Sites which are less expensive in the long run shall be given priority to less efficient sites. e. Deschutes County shall encourage the formation of special service districts to serve rural needs rather than becoming involved with serving those needs. The County will foster coordination and mutual planning between the County, special PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 35 districts, utility companies and service corporations. This shall include common trenching where appropriate. FINDING: No utilities are proposed. These policies do not apply. f. Deschutes County shall coordinate with the cities and other service providers in urban areas to assure that all urban services are provided in an equitable manner and construction phased, based upon the time required to provide the service, the reliability of the service, the financial cost, and the levels of service needed. All services shall be provided consistent with the provisions of all other required services. FINDING: City staff has kept the County apprised of negotiations and agreements with DNF to provide adequate sewer and transportation facilities. Comments from the Bend Fire Department are in the record. The record also includes a "will serve" letter from Avion Water. As part of the concurrent City process, the City has sent notice to the Bend Police Department. At the time of this staff report, no comments have been received. g. Because of the increasing cost of development which must be borne by local residents, the County shall investigate various methods to control or obtain funds for providing new public service levels. This investigation is to include review of a Systems Development Charge. The County shall conduct a review of systems development charges for areas outside the urban growth boundary by January 1, 1995. FINDING: This policy does not apply. 2. Utilities. a. Utility companies shall be offered an opportunity to comment on their ability to serve proposed developments. b. New development shall not be located so as to overload existing or planned facilities, and developers or purchasers should be made aware of potentially inadequate power facilities in rural areas. C. When feasible all utility lines and facilities shall be located on or adjacent to existing public or private rights-of-way so as to avoid dividing existing farm units, and transmission lines should be located within existing corridors as much as possible. d. Power generation sites shall be landscaped and the site plan reviewed as part of the conditional use applications. e. Electrical substations shall be a permitted use in all appropriate zones with final approval based upon County Planning Department acceptance of a detailed site plan. Minimum lot sizes shall not apply to substations, but adequate PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 36 area for equipment, storage, buffer and potential expansion shall be required. f. All new development shall be consistent with adopted sewage plans, and new community systems in urban areas shall be designed to fit into the municipal system. Also, in urban areas, where connection to a sewer system is not appropriate now but will be required in the future, dry sewer lines may be required for future use (this does not apply in larger lot subdivisions where no future sewers are anticipated). FINDING: No new development or utility facilities are included as part of the applications. These policies do not apply. g. Mutual agreements between the County and the cities shall assure sewer and water systems are extended in a planned manner. FINDING: As noted previously, the City and DNF have reached an agreement for connection to City sewer service. Additionally, Avion Water has indicated an ability to serve the property. h. Sewage treatment plants offer both problems and opportunities. To decrease the impact of noise and odor a large buffer area shall be required. The treated sewage (both septic tank sludge and municipal water) should be used as a resource and drill hole disposal discouraged. i. Well marked recreational vehicle dump stations are needed locally and the County shall encourage such facilities in parks, service stations and other appropriate locations. FINDING: No new development or utility facilities are included as part of the applications. These policies do not apply. The capability for County land to be annexed into a city shall depend upon the availability of adequate services, such as water. FINDING: As detailed in the foregoing findings, adequate public services are available. k. Metering of existing and future water systems shall be fostered. 1. Oregon Water Wonderland Unit 2 Sewer District. Through County file nos. PA-02-5 and ZC-02-3, the Board of County Commissioners approved a zone change for certain property in Section 25 of Township 20 South, Range 10 E.W.M. to Rural Residential with a Limited Use Combining Zone. The Board adopted the Limited Use Combining Zone to limit the uses that PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 37 could be established on the subject property to those approved through its written decision dated March 28, 2003 and listed as follows: a sewage treatment facility, effluent ponds, ground application of treated effluent, agricultural use, and propagation and harvesting of a forest product. FINDING: These policies do not apply. G. Bend Area General Plan 1. Preface to the Bend Area General Plan Format of the Plan At the end of each chapter are policies that address issues discussed in the chapter. The policies in the General Plan are statements of public policy, and are used to evaluate any proposed changes to the General Plan. Often these statements are expressed in mandatory fashion using the word "shall". These statements of policy shall be interpreted to recognize that the actual implementation of the policies will be accomplished by land use regulations such as the city's zoning ordinance, subdivision ordinance and the like... FINDING: Based on the above language, it is not necessary to analyze specific Bend Area General Plan policies because those policies are implemented by the City of Bend's zoning ordinance. IV. CONCLUSION AND RECOMMENDATION: Based on the record and the Findings of Fact and Conclusions of Law set forth above, I find that the proposal complies with the applicable Statewide Planning Goals, Oregon Revised Statutes, Oregon Administrative Rules, the Bend Area General Plan, and the Deschutes County Zoning Ordinance and Comprehensive Plan. Kenneth D. Helm, Hearings Officer A DECISION BY THE HEARINGS OFFICER BECOMES FINAL TWELVE (12) DAYS AFTER THE DATE OF MAILING, UNLESS APPEALED BY A PARTY OF INTEREST. Dated this 23th day of May, 2011 PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 38 Mailed this day of May, 2011 PA-11-1, ZC-10-1, MA-11-3 Deschutes National Forest 39