2011-3015-Minutes for Meeting August 10,2011 Recorded 9/22/2011COUNTY OFFICIAL
NANCYUBLANKENSHIP, COUNTY CLERKDS
COMMISSIONERS' JO RNAL 09/22/201108:07:26 AM
111111111111111111111111 I~ 11111
2 11 31115
Do not remove this page from original document.
Deschutes County Clerk
Certificate Page
-Ir 17 r..1
Deschutes County Board of Commissioners
1300 NW Wall St., Suite 200, Bend, OR 97701-1960
(541) 388-6570 - Fax (541) 385-3202 - www.deschutes.org
MINUTES OF ROAD STUDY GROUP
DESCHUTES COUNTY BOARD OF COMMISSIONERS
WEDNESDAY, AUGUST 10, 2011
Commissioners' Hearing Room - Administration Building - 1300 NW Wall St., Bend
Present for a portion of the meeting were Commissioners Tammy Baney and
Anthony DeBone. Present for the entire meeting were Commissioner Alan Unger;
Dave Kanner, County Administrator; and members of the committee: Todd Taylor,
Ben Gordon, George Kolb, Steven Runner, Clay Higuchi, Mike Williams, Andy
High, Bill Robie, Gordon Dukes, Tyler Deke, Jack Holt, and Conrad Ruel. Also in
attendance for part of the meeting was media representative Hillary Borrud of The
Bulletin.
Chair Todd Taylor opened the meeting at 4:05 p.m.
Todd Taylor explained that most members present met with the Board of
Commissioners at their July 27 work session, at which time they discussed the task
at hand, ideas to consider, how to get educated and make recommendations.
Mr. Taylor asked if the reclamation process involves adding cement, who decides
the method to be used, and if someone tracks the record of the process and the life
span of the work. Mr. Kolb replied that they have contacted other agencies who
are doing full-depth reclamation, and also refer to information in design books.
They do a fair amount of laboratory testing and use a company for this and for
tracking purposes.
Tyler Deke asked what else is outsourced. Mr. Kolb said that they outsource some
overlays, and the purchase of asphalt, base rock and concrete. Asphalt and
aggregate numbers are at about $7.6 million, and most of this is outsourced.
Minutes of Road Study Group Meeting Wednesday, August 10, 2011
Page 1 of 10 Pages
When asked about Road Department employees, Mr. Kolb stated they have two
part-time customer service employees, with the rest being full-time. The design
engineer position was eliminated when the County stopped taking in new local
improvement districts. They do not ramp up employee numbers in the summer,
but use temporary personnel as flaggers and try to keep everyone else busy year-
round.
Jack Holt asked if the surveyor's services are used by others. Mr. Kolb said that he
does work for all other local agencies.
Chris Doty asked if the employees are in various unions. Mr. Kolb replied that
most are in one union, along with employees of the Solid Waste Department.
Conrad Ruel asked if there is a list of future projects and whether they will be able
to do all of them. Mr. Kolb said that they have a five-year capital improvement
plan. The goal is to keep the roads in good condition for twenty years.
Andy High asked about the difference between maintenance and replacement. Mr.
Kolb said that you fix a pothole, but replace a deteriorated sidewalk. The
maintenance overlays run under two inches thick. Anything over that requires a
comparison through BOLI to show that the County can do it cheaper than going
out to bid. This is requires through Oregon Revised Statute. They could go
directly out to bid on the smaller projects.
Mr. Taylor referred to the organizational chart, and asked about capital
expenditures, maintenance and the utilization of tools and equipment. He asked
how many pieces of rolling stock belong to the department. Gordon Dukes gave
an overview of the vehicles, and said there are perhaps fifty pieces of equipment of
various types. Many have different uses and they have to allow for breakdowns,
etc.
Mr. Taylor asked what would be optimal. The budget comes down to a big portion
being labor and equipment. Mr. Kolb stated that he could put together some
numbers and determine how the equipment is charged back to the job. Mr. Taylor
noted that it does not matter if an entity is private or public; there is a cost to own
equipment, and there might be a point where it is not being utilized. He asked
about the hours the equipment is used, the number of miles, and so on.
Minutes of Road Study Group Meeting Wednesday, August 10, 2011
Page 2 of 10 Pages
Mr. Kolb said that an audit was done and this was discussed then. Mr. Dukes
added that the government can afford to sit on the sanders so that they are available
when needed. Most are old dump trucks that can be used for this purpose.
The group then discussed Road Department budgeting. Mr. Kolb said that the
funding issues are complicated. There are dedicated road funds that can only be
used for certain things. Most revenue comes through motor vehicle fees, but the
amount is not guaranteed and has been declining.
Mr. Deke asked if the amount went up when registration fees and gas taxes were
increased. Mr. Kolb answered that the amount actually went down because traffic
dropped. People are traveling less and are using more economical vehicles.
Forestry receipts, if not reauthorized, will go down significantly. STP funds can be
exchanged for 94 cents on the dollar and used for road maintenance. They got a
one-time forest highway grant of $600,000 for Cascade Lakes Highway. The
budget reflects internal services revenue, equipment repairs and things they do for
other departments. There is some external revenue from other agencies for road
striping and other work. A small amount of revenue comes from transportation
SDC's.
Jack Holt asked about the contingency amounts; and on the expense side, materials
and services, and administration. Mr. Kolb said they are required to have a certain
level of contingency dollars. Dave Kanner added that the total includes surveying,
weed control and other things, not just road maintenance. About half of the
employees work on the roads.
Mr. Taylor observed that there are thirteen people in the fleet department, with
twenty pieces of equipment. Mr. Dukes noted that they maintain the equipment
belonging to other departments as well. Mr. Kanner said that the funds go into a
vehicle replacement reserve, and when vehicles are needed they purchase through
the State's purchasing pool.
Mike Ryan asked if the department owns the equipment. Mr. Kanner replied that
the Road Department does not own the vehicles, but manage the equipment plus
charge the departments a fee to maintain those vehicles. The internal service
charge is significantly lower than it would be through an outside provider.
Minutes of Road Study Group Meeting Wednesday, August 10, 2011
Page 3 of 10 Pages
Clay Higuchi said that they need a definition of what constitutes services and
maintenance and the cost of doing this work. For instance, does it include the cost
of the supervisor, the building and other aspects. This has to be considered or they
will always show less than private enterprise.
Mr. Taylor said there are two different components. There are revenue
opportunities, and the cost component. They need to look at what can be done
differently. The total average cost of an employee, with benefits, is about $97,000.
That is a big number when compared to the private side.
There is a ratio between dollars coming in and going out. They need to know what
goes towards overhead, equipment and facilities, and how much actually gets to
the roadways. They need to benchmark how that compares to other counties.
Mr. Kolb stated that some road revenue can only be used for roads or certain work
on roads. Mr. Holt said that this will go down if everyone starts driving electric
cars.
Mr. Taylor said that there are other expenses above and beyond other things that
were not apparent five years ago, such as the noxious weed program. Mr. Kolb
stated that this is funded mostly through grants. Mr. Kanner added that this is a
very small cost. Deschutes County is a statutory weed control district. Road
money spent on the weed program has to be spent on county rights-of-way.
Mr. Holt said that some grants have requirements that are not a good idea. Mr.
Dukes stated that there is a big problem here with noxious weeds.
Mr. Taylor said that the forest receipts are at risk. He asked what else is at risk at
this time. Mr. Kolb said forest receipts may be at $600,000 in 2012. Mr. Kanner
added that this was the historical average prior to the law being put into place in
2001.
Mr. Kolb said there are grants, but they never know when they will get them.
Usually they take a long time and typically you have one shot at them. The STP is
about $500,000 and is fairly consistent.
Motor vehicle revenue is down due to electric or hybrid vehicles, and fewer people
are driving. Mr. Kanner said that the amount went up, but not at the rate of
inflation of oil and construction costs. It is consistently below ODOT projections.
Minutes of Road Study Group Meeting Wednesday, August 10, 2011
Page 4 of 10 Pages
The legislature increased the gas tax and registration fees, and ODOT raised the
rate, but they have consistently come in at 10% below that.
Steve Runner noted there is $20 million in revenue, but they leave $3 million in
beginning cash. Mr. Kanner explained that this is in reserves. The vehicle
replacement fund is an example. It is used when a vehicle needs to be purchased.
Expenditures have to match revenue. You have revenue minus contingency, minus
reserves.
Mr. Taylor asked about action items. Chris Doty asked about the pavement
condition index. Mr. Kolb said that it is at about 75%. The roads are in good
condition overall.
Mr. Taylo9r said they need a list of equipment, costs and utilization, what the
charges are and how they are transferred. He asked if the County ever subcontracts
engineering work to avoid the costs of carrying staff. Mr. Kolb replied that they
had a design engineer when they were working on local improvement districts.
Now they do designing in the winter months and projects in the summer. They
previously had two designers and two licensed engineers, but are now down to
bare bones.
Andy High asked if engineering calculations fail, do they have insurance to cover
this. Mr. Kanner replied that the County is self-insured and covers employees for
actions taken within the scope of their work. Mr. Kolb added that the only thing
they subcontract would be larger projects that require additional personnel. Mr.
Doty said they are able to maintain a 75% PCI. Mr. Kolb stated that if revenue
goes down, this will be hard to maintain. They have to look at the workload. They
could take out preservation and overlays, and may end up grinding inlay on those
roads. They are trying to get away from cinder bases that are failing.
Mr. Taylor asked about the bidding process. Mr. Kolb explained that the ORS
must be followed, along with the Oregon Revised Statutes and County Code. Most
work over $150,000 requires a formal bid process.
Mr. Deke asked if there were changes in legislation on the big process for
engineering services. Mr. Taylor said that he liked it when State and County
trucks came into his former business. This meant the highest profit margin for
them. You take advantage of the times you are in.
Minutes of Road Study Group Meeting Wednesday, August 10, 2011
Page 5 of 10 Pages
Mr. Kanner said that the fluctuations in the marketplace and economy have
become more rapid. For example, in 2007 they laid off and then the contractors
did not have staff or time for the work that came in. There is a big cost to rehire
and train. It costs about $100,000 to get someone fully up to speed. Mr. Kolb
added that some placed lay off people in the winter, but the County uses those
employees to snow plow and do other wintertime work.
Mr. Taylor stated that the group needs to challenge the status quo. Sometimes it
might not be advantageous to do things the same way.
Mr. Holt said that there is a disconnect here. He asked how much it costs to keep
people on the job. Mr. Kanner stated that the County can lay people off.
However, if work is currently provided by public employees, it is harder to
contract that work out. The legislature has made it difficult to do so. If there is
less revenue, they may have to lay off or do less. But the County cannot
summarily lay people off just to be able to contract the work out.
Mr. Taylor asked if it is cheaper to contract out, why not do so. Mr. Kanner
indicated he would provide a copy of the statute. They have to give the union an
opportunity to demonstrate they can do the work at the same cost, or cheaper.
State law requires a complicated and expensive analysis to prove this would save
money. They have to factor in unemployment insurance, COBRA coverage and
other aspects. This was put into place during labor-friendly legislative sessions, so
it is very difficult to change.
Ben Gordon said that they have to throw in the cost of overhead and internal fees
paid back to the County. Mr. Taylor stated that the private sector does not have a
set revenue stream. It is money in, money out, and overhead has to be factored in.
Mr. Doty asked about not doing overlays. Through attrition, they could cleave out
some maintenance services and then contract them out when needed. Mr. Kolb
said they look at positions when someone retires. There is still a cost for insurance
for retirees.
Mike Williams asked what happens when a project fails. The private sector would
have to be out redoing it. The taxpayers may or may not have to pay again. Mr.
Kolb said this has only come up on chip seal. They still cannot figure out what
happened with those particular projects. This cost will come out of the
maintenance fund. If an overlay comes apart in three years and it was contracted
out, the County ends up having to take care of that, too.
Minutes of Road Study Group Meeting Wednesday, August 10, 2011
Page 6 of 10 Pages
Mr. Taylor brought up shared services. Mr. Kolb said there are already some
programs in place through intergovernmental agreements with various counties,
cities and the State. Much depends on the equipment needed and the locations
involved. They also work with some road districts.
Mr. Taylor asked what the ORS allows, and what is meant by the `at cost' price;
and whether they mark up the cost to cover other expenses. Mr. Kolb replied that
they cannot do this to make a profit. They figure in wear and tear and employee
time, plus depreciation of the equipment.
Mr. Taylor asked if there is anything else that can be done from a maintenance
facility; whether separate facilities can be combined into one big shop instead. Mr.
Doty stated that there might be some opportunities for this, but they have to think
about utilization and location. It could be some equipment is being fully utilized at
certain times.
Mr. Kolb said that a central location has been analyzed. There is only so much one
entity can do. There are winter maintenance issues that have to be addressed by
specific agencies. Mr. Doty stated that the County does chip sealing and striping,
but other agencies may not be taking advantage of this.
Mr. Robie asked is this continues from year to year. Mr. Doty said that the IGA's
allow them to work together. They are not directly contracted. There are some
shared duties. They evaluate the chip seal work each year. The cities can and will
do some small projects themselves.
Mr. Taylor said that utilization needs to be maxed out. He asked about
opportunities for the use of equipment and talent. Maybe some equipment could
be kept in centralized locations. Mr. Kanner stated that they explored this several
years ago. The cities have facilities that are roughly the same size as the County's,
and neither can expand. This idea would require a new facility in one location, and
the cost could be in the millions. The question is, when would this result in
savings? It could take decades. They might be able to reduce the numbers of some
equipment, but it would have to be maintained and stored in the meantime.
Mr. Taylor said the County has six mchanics. Knife Rive had 450 pieces of
equipment and seven people in the shop. He asked if all the County mechanics are
busy all the time. Mr. Holt observed that when auto service is busy, dealerships
may have to stay open until 11 at night.
Minutes of Road Study Group Meeting Wednesday, August 10, 2011
Page 7 of 10 Pages
Mr. Doty said that the County has to take care of more than just roads. There are
waterways, parks and other areas. There might be efficiencies gained in
purchasing products or combining bids. The striping rig is not used every day but
needs to be available when scheduled.
Mr. Taylor listed action items, such as different entities combining services and
benchmarking what is now being done. Mr. Holt added that there should be an
inventory on mechanics and equipment, and how they are being utilized.
Mr. Taylor asked if they do double shifts. Mr. Kolb said that some come in at 3 or
4 AM, others later. Commissioner Unger said that there is also specialized
equipment repair needed, such as police vehicles, fire trucks and so on.
Mr. Taylor said the other information needed is the classification of roadways
based on road usage. Mr. Kolb said much of this is already in the transportation
system plan update. Mr. Taylor stated they need to figure out the utilization of
roadways. If some are going back to gravel, how would they determine which
ones. Would this be based on the vehicle count or number of residents? How do
they prioritize which roads to maintain at what level? Mr. Kolb said there is no
formal rating system. Much has to do with the number of vehicles and the road
speeds. They have a plan for five years of overlays, PCI and ADT ratings.
Mr. Doty stated that there must be an industry standard of what is acceptable for
gravel roads, like a lower volume of vehicles, the speed and curves in the road.
Mr. Kolb said there are local imprudent districts where people paid $5,000 or more
to pave their roads and have the County maintain them. Those traffic counts might
be low.
Mr. Runner said the higher count is more important. Mr. Kolb stated they could
maintain an average PCI, using the same weight based on beneficial use.
However, even gravel roads need some level of maintenance.
Mr. Holt said that they need to use the common sense standard. It seems this
should be when the road needs work. Mr. Taylor stated he is confused; it appears
that the roads are in decent shape now and not in arrears. They have opportunities
to find different revenue, and this will take a while. He asked if an SDC is an
option.
Minutes of Road Study Group Meeting Wednesday, August 10, 2011
Page 8 of 10 Pages
Mr. Kanner said there could be a bicycle sales and rental tax. Mr. Gordon added
that there is a loss of gas tax overall, so they need to be prepared.
Mr. Kanner stated that they need to look at cutting costs instead of trying to find
revenue. He said they should let the local roads return to gravel. There are 280
miles, much of it low volume, with 95 built through LID's. They will not get there
by consolidating services or bidding out more. They need millions of dollars.
Mr. Gordon asked what the savings would be by not working on those roads. Mr.
Kanner said that the amount varies, but could be about $2 million annual savings.
The cost is in equipment and materials. They will not save enough money but
cutting people.
Mr. Taylor said that if you add in that and other things, you get more savings. He
asked if there are other ways to go besides letting the roads go. They will have to
obtain some revenue enhancement.
Mr. Deke stated that several options were already presented, all allowed under
State statute. Mr. Kanner said that almost anything the County does has to go to a
vote, and he is not sure any of them would pass.
Mr. Kolb noted that some of them would have to be dedicated to specific road
uses. Most funding is dedicated to established roads built at County standards. A
countywide tax for road repair might require the County to work on dirt roads. He
gets many calls from citizens complaining that their road needs to be fixed even if
it is not a County road.
Mr. Doty said that you cannot remain at a certain level; things have to be indexed
for inflation. Now they cannot keep up. The funding sources should have been
indexed.
Mr. Taylor said the overall objective is to figure out where the money is spent; the
bidding process; mutual aid; and how to gauge the use of roads. Mr. Robie stated
some of this is part of the twenty-year plan. Mr. Taylor said that they relied too
much on certain funding.
In regard to construction design and PCI standards, he is indifferent. He said they
look at best standards. Going to concrete is not feasible at this time; just PCI
standards and how they apply. They need to review what is being done; chip seal,
overlay and gravel; and the cost and equipment.
Minutes of Road Study Group Meeting Wednesday, August 10, 2011
Page 9 of 10 Pages
Mr. Gordon said that oil mat might be good in places where the soil is softer. Mr.
Kolb stated that they have a lot of problems with this now because of the cinder
base used previously. It does not hold up.
Mr. Taylor wants to look at standards for gravel roads and their maintenance. The
next level would be chip seal; then asphalt, with a skin overlay.
Mr. Kolb pointed out that they are not building any more roads right now. Mr.
Taylor asked if a road is declining, can they do gravel and chip seal. Mr. Kolb said
that they would have to grind it up. There are options: chip seal; oil mat over full
depth; overlay; and full depth. They need the cost of creation and maintenance,
including dust control.
Mr. Kanner said they did an on-line survey, but one question did not work. No one
liked any of the revenue raising ideas except transient lodging tax, which failed at
the ballot. The gas tax question did not work properly. The survey is not
statistically valid, but gives some ideas.
Commissioner Unger stated that there are expectations to grow the economy and
tourism, and some of that means you have to have decent roads. The money goes
into restaurants and motels, but none of this helps the infrastructure. Mr. Kanner
added that there is a moratorium on local gas taxes until 2014.
Mr. Taylor asked if there is any way to capture local gas taxes from visitors. It
seems the best answer may be a sales tax dedicated to certain uses.
The group will meet again on Wednesday, September 14 at 4:00 p.m., same
location.
Being no further discussion, the meeting adjourned at 6:20 p.m.
Respectfully submitted,
(J~~ A'61~
Bonnie Baker
Recording Secretary
Minutes of Road Study Group Meeting Wednesday, August 10, 2011
Page 10 of 10 Pages
N
~
L
y
®
of
IZ C
N
GO
Q
E
s
N
V
o7
f m
l M
U
Q
or
VO ~ C~
c
bo
~
M
I
1lM
SV~
I
~
IL
Cal-
•
~
\
O
~
~ "
I i
~I
09
I
h
i L
C
~ 1 _ I
i
i
s
I
I
b
o! ~ ,
. I ,
'c'
vv I
J
L
1
S
~
73
7
w
~•Y c~
I
~ j
~
~
~
I
'
~I
VII
~ ~
!
~✓i !
T
v i
lj
v
i is
Road Department Tom Blust, Director
Total Budget: $18,762,093
Budget Change: -4.70
Total Staff: 60.50 FTE
Staff Change: -1.00 FTE
Department Overview
Resources
Beginning
Interfund Other Capital
Charges 10%
6%
sr"GaJPmts
u%
FederalGov
Pmts
12%
• County Surveyor's Office - provides for the
review and filing of all land surveys within the
County and the preservation of public land
corners.
Mission Statement
Provide public works services that promote
public safety, support local economic
opportunities, and benefit the residents of
Deschutes County
The Road Department is responsible for the
development, operation, and maintenance of the
County road system, consisting of 900 miles of
roadway. The Road Department's services include
routine road maintenance (e.g. chip sealing,
pothole patching), snow and ice control, roadside
vegetation management, traffic signing and
striping, bridge maintenance, and emergency
response to roadway hazards. Additionally,
engineering and administration services are
provided for contract management of pavement
preservation and capital improvement projects,
regulation of work within the public road right of
way, and review of countywide planning and land
use issues related to transportation. The purchase
and maintenance of fleet and heavy equipment
needed to perform road maintenance functions are
also the responsibility of the Road Department.
Other responsibilities of the Road Department
include a number of non-road services that are
funded outside of dedicated road funds such as:
• Countywide Noxious Weed Control -
operates under the authority of the Deschutes
County Weed District.
■ Fleet and Heavy Equipment Services - purchasing and maintenance of vehicles for all
County departments (except the Sheriffs Office).
■ Services for Other Agencies - provides a variety of maintenance services (e.g. chip
sealing and paint striping) to cities, other counties, the Forest Service, and the BLM.
Document Reproduces Poorly
(Archived)
Fleet and Equipment Services
Road Department
61150 SE 27th St. • Bend, Oregon 97702
(541) 388-6581 • FAX (541) 388-2719
The Deschutes County Fleet and Equipment Services provides:
• Purchasing of fleet cars, pickups, and equipment for the County fleet with the
exception of the Sherriff vehicles.
• Performing, tracking, and recording the preventative maintenance and repairs of
the fleet vehicles and equipment.
• Review of outside repairs and purchase invoices.
• Administration and tracking of warranty repairs.
• Shop is open from 4:00am to 5:30pm without use of overtime under normal
circumstances. Most repairs are complete before the start of road maintenance
operations.
• Preparation of regular and special equipment for seasonal use including winter
maintenance and special road maintenance applications including the paint
striping truck, asphalt distributor trucks, chip spreader, sanders, plows, chemical
application equipment (weed spray), and snow blowing equipment.
• Manage and store winter and summer tire inventories. Swap tires on a seasonal
basis.
• 24 hour on-call field service with immediate response to our high priority needs.
• Perform major fleet and equipment repair in house. Personnel have a strong
dealership background in automotive, truck, and equipment repair.
• Maintain parts inventory. Keep inventory at as low as possible while still
supporting necessary equipment and staying efficient.
• Purchases parts, shop supplies, tools, fuel, oil, and road maintenance supplies.
• Manage repair orders and fuel billing.
• Maintain underground tank system for fuel and diesel at or above DEQ
requirements.
• Maintain equipment and car wash stations that support the County fleet including
Sheriff vehicles.
• Maintain hazmat building for weed spray chemicals and Sheriff Department
contraband storage.
CADocuments and Settings\Kolb\My DocumentsMORD\Budget\Fleet and Equip Services.docx Page 1 o
8/9/2011
GK
o A"'W XVA
Fleet and Equipment Services Personnel
Randy McCulley- Fleet and Equipment Manager
Road Department
61150 SE 27th St. - Bend, Oregon 97702
(541) 388-6581 - FAX (541) 388-2719
Greg Dawley- Senior Store Clerk
• Maintains parts inventory
• Purchases parts, shop supplies, tools, fuel, oil, and road maintenance supplies
• Enters technician time cards
• Processes invoices and purchase orders to send to accounting
• Picks up parts as needed
Tony Bohren- Equipment Mechanic
• Strong background in truck repair
• Early shift. Starts at 4:00am to make repairs from the end of the day before and
have trucks ready to go at start time.
• Has strong knowledge of specialized asphalt distributor and crack seal equipment.
This knowledge is a huge value due to the lack of dealer support in Central
Oregon.
• Knows winter road maintenance equipment setup and preventative maintenance
• Repairs all equipment as needed
Larry Griggs- Equipment Mechanic
• Strong background in truck repair
• Early shift. Starts at 4:00am to make repairs from the end of the day before and
have trucks ready to go at start time.
• Has strong knowledge of specialized asphalt distributor and crack seal equipment
• Knows winter road maintenance equipment setup and preventative maintenance
• Repairs all equipment as needed
Scott Jacob- Equipment Mechanic
• Strong background in equipment repair
• Qualified welder and fabricator. Fabricates and repairs steel, aluminum, and
stainless steel.
• Highly qualified to make major repairs on heavy equipment. Has experience as
dealer field technician.
• Has truck experience and knowledge
C:\Documents and Settings\Kolb\My Documents\WORD\Budget\Fleet and Equip Services.docx Page 2 o
8/9/2011
GK
E
Road Department
61150 SE 27th St. - Bend, Oregon 97702
(541) 388-6581 - FAX (541) 388-2719
Clarence Lamping- Equipment Mechanic
• Welder and fabricator
• Has good knowledge of our fleet and the annual pre-season needs
• Maintains the paint truck to keep good striping quality and maximum up time
• Strong knowledge of chip spreading equipment
• Repairs and maintains a wide variety of the County fleet
• Strong knowledge of winter road maintenance fleet needs
Ian Jergenson- Automotive Mechanic
• Maintains and repairs the cars and trucks of the County fleet
• Schedules and works directly with departments to communicate repairs
• Strong automotive dealership background
• Helps with equipment repairs when needed
Troy Thompson- Automotive Mechanic
• Maintains and repairs the cars and trucks of the County fleet
• Schedules and works directly with departments to communicate repairs
• Strong automotive dealership background
Helps with equipment repairs when needed
Terry Brown- Equipment Servicer
• Schedules and performs in shop and field PM maintenance on the County
equipment fleet
• Provides mobile fueling service for remote Road Department jobs and the Solid
Waste Department
• Strong knowledge of repair history on the County fleet
• Makes repairs as necessary during PM maintenance
Kevin Trent- Automotive Servicer
• Assists automotive shop with PM repairs as needed
• Maintains the tire inventory for the County fleet and equipment. Makes repairs in
the shop and in the field
• Performs seasonal tire swaps
• Performs minor building maintenance repairs as needed in the Road Department
shop
C:\Documents and Settings\KolbWy Documents\WORD\Budget\Fleet and Equip Services.docx Page 3 o
8/9/2011
GK
Deschutes County Road Department
Information Services Division - A brief overview
The Information Services Division provides information Technology, Geographic Information Systems,
Accounting, Office Support, and Customer Services for the department. The division is managed by the
Information Systems Manager.
Information Technology - The Road Department is highly dependent on information technology and
has many specialized technological needs including Computer Aided Road Design, Geographic
Information Systems, Cost Accounting, Fleet and Equipment Management, Road Information
Management, Fuel System Management, and Digital Document Management. The Information
Technology staff, comprised of the Information Systems Manager and the Applications
Analyst/Programmer, ensures that these needs are met.
Geographic Information Systems - Maps are an essential tool when it comes to maintaining,
planning and building roads. The GIS Analyst/Programmer provides custom maps for the department as
well as other departments. The GIS Analyst is also responsible for ensuring the road information
database is maintained and that road location information is accurate.
Accounting - The state requires that counties keep accurate records of our costs of road maintenance
and preservation activities as well as capital improvement projects. The department uses a
computerized cost accounting system to track these costs. Two Accounting Clerks are charged with the
task of entering data and producing reports that satisfy the state's requirements. The accounting staff
also handles our Accounts Payable and Accounts Receivable needs and work closely with the Finance
Department.
Office Support - The Administrative Secretary handles our personnel needs and is our liaison to the
Personnel Department. This position is a key member of the Safety Committee and works closely with
the Safety Representative. The Administrative Secretary also ensures office procedures are followed,
schedules office conference rooms and maintains adequate levels of office supplies. The Records
Specialist is responsible for creating and maintaining our growing digital document libraries including
road establishment documents and engineering/surveying documents. In addition, the Records
Specialist is our Contract Manager; preparing documents for projects that are put out for bid.
Customer Service - The department has three Customer Service Clerks (2.5 FTE). Duties include
reception, filing of surveys and other documents, receiving monies, word processing and transcribing
dictation, photocopying, processing mail and assisting the Accounting staff and Records Specialist.
JralY
U~
N
W
ti
JS~a
cu
4-1
N
cu
2)
C\l
Ir-
C)
N
0
Sr-
T-
N
W
li
LO
O
I
cu
C)
CD
Ch
CD
J~TY
0 s
w .
r
7
S3O
e
Y
U O
y
N
W
+
N
E
O J
0
•c
x P
N
C
N
I
r
'
y
Q ,
,
O
O O
m
U
A
'O
C
co
c
E
N E d
NC'C
0 CL ' I
O r
> m > n Z LO
? is
N d
•C V
'EO N
Q
a.
m
d a
c
m Y
C
W
20
C N
7
O
U
i
C
d
Es ~
Gl
(V C
c
d
LL
A
7
N
C
7
O
U
-O
m
N N
°
N
c
N
o
Q
m
O
Co i
d Y
0
E
~
.N
CL
O
N
N
.
cU
cc
U
M
Y ?
C
x
N
f0
a
y
00
Y_
a
i. E
W E f0
4
CL
-,P___~
i~
00
O N
w
c
lr0 N
V d
Q v i
Q
_
rnv
c
-
N
L=
O
N
L
r
c
0
c
LL
(D
.y. f
t0
S)o
W fNl~
C'
m
C
y
0
V
N
Q
Y
C
Lu w
m
_
C7
c
.
O
'
.
~
C O
O
f0
C
U
'
N
~
N
_
yyV
2
c
N C
J
c
W Q
O
d
F
m
m _ 01
O
I-
U)
LL
I
0
iu)
V
y
ar
y
'c
c
c
(D
d
V
_
c
N
a
aci
c
'a
E
O
a
0
d
c
3
Z
y
E
D
d
CO
Ui
a)
E
O I
c
m
d
H-
y
N
C
p
:0
D
c
t
~
d
E
O
c
-E
C.D
E
~
H
c
x
N
U
L
W
t
Q
O
O)
N
N O
C ~
0
V ~
CL
Q
J
V
e `O
6f y
AZ
`0 a
BN
V
c O
w y
S2
g a
7
to N li
m
3
I
m
c
a
I m
U
r
U
_J
V
m
a
c
ca
W
r
d d
d E
d y r
N
W
N
v
CD
O
ffc
pp
$
a`5
c
U
.0
0
°
m
d
N
=
N
E
U
a
C
y
c
C
C
d
O
Q
E
U
_
°
J
U)
c
c
o
U
c
c
o
Ze
a
m
O
c
t
°
l
o
-
E
c~
o
m
Q`0
o
m
W
m
0:
'
W
O
R
N
N
.
.
cc
4)
c
0
N
c
d
m
~
w
N
C
O
'O
Y
rC
d
d
co
7
CA
Y
e
c
m
E
>
c
:
N
c
•5
>
a
LL
n
2
U)
o
0:
m
J
N
2
0
cc
U)
.
a
Q
w
c C C
O d
E R a
m I
R
c
>~I
tlJ
C
1 Cr
ti Q
George Kolb
From:
George Kolb
Sent:
Friday, August 05, 2011 2:41 PM
To:
'Todd Taylor'
Cc:
Dave Kanner
Subject:
RE: Meeting
Todd;
I just talked to Dave and he feels it is the Board's decision on who should be on the committee so I think we should
come up with a list of additional people and get that to the Board on Monday or Tuesday for them to look at prior the
Wednesday meeting. As far as an agenda, I was thinking of going with the four topics Dave had sent out in his July 27th
e-mail:
1. Road Dept. Overview - How are we organized and what do we do
2. Department Budget -Where does the money come from and how is it appropriated
3. Bidding Process- How does our bidding process work and what do we bid out?
4. Mutual aid and shared services -What are we already doing with other jurisdictions.
i am wide open Monday morning and we can sit down and go over the information I have put together to address the
above items. Let me know a time that works for you. Thanks - George
George Kolb, PE
Interim Department Director
Deschutes County Road Department
georgek anco.deschutes.or. us
541-322-7113
From: Todd Taylor [mailto:tmtataylornw.coml
Sent: Friday, August 05, 20112:37 PM
To: George Kolb
Subject: RE: Meeting
Thanks
From: George Kolb [mailto:George. KolWdeschutes.orgl
Sent: Friday, August 05, 20112:19 PM
To: Todd Taylor
Subject: RE: Meeting
I think it would be a good idea but let me run it by Dave and get back to you. George
From: Todd Taylor fmailto:tmt@taylornw.com]
Sent: Friday, August 05, 20112:20 PM
To: George Kolb
Subject: Meeting
Would you have time to meet Monday morning to discuss the agenda and the committee members? Todd
BIDDING PROCESS
The Road Department is governed by several documents when bidding out work. They
are as follows:
1. Deschutes County Code 2.37: Public Contracting Code
2. Oregon Revised Statutes: Chapters 279A, 27913, and 279C
3. Oregon Administrative Rules: OAR 137 divisions 46, 47, 48 and 49.
All contracts are awarded to the low bidder unless there is an issue with the low bid not
meeting the applicable specifications.
We will also get quotes from area contractors to use materials such as asphalt pavement
and aggregate base to use on maintenance activities in different areas of the County. We
also use the quote process for small construction projects such as the Sunriver inlets and
Wickiup Junction Park and Ride expansion
All work that is not maintenance in nature is bid out to contractors. On several chip seals
this year that we only chipped the travel lane, we worked with private contractors to
provide the materials and equipment to slurry seal the paved shoulders.
j l
George Kolb
From: Roger Olson
Sent: Monday, August 08, 2011 9:15 AM
To: George Kolb
Subject: RE: Bidding for County goods
Fill dirt
Shoulder rock
Base rock
Chip seal rock
Reject rock
Drain rock
Select backfill
Flow fill
Redi-mix concrete
CTB
Concrete barriers
Concrete pavers
Culvert pipe
Guard rails and parts
Guard rail installation
Trucking
Rental equipment
Rental tools
Mailbox post assemblies
Fence post s and materials
Cattle guards
Sight posts
Snow poles
Temporary pavement markers
Traffic line paint
Thermoplastic pavement markings
Glass beads
Crack fill material
Asphalt for tack
Asphalt for chip seal
Asphalt for fog seal
Cold mix asphalt
Hot mix asphalt
Chain saws, weed-eaters, misc. hand tools
Dust palliatives
Sanding cinders
Snow removal services
Anti-ice chemicals
Weed control chemicals
Just to name a few. We quote everything, usually by phone, especially if we think it is a material we will want again.
Several big -ticket materials such as sign materials, asphalts for chip seals, and fog seals and anti-ice chemicals are bid at
ODOT and offered through ORPIN by price agreement. We use those when we can. We also, as much as possible,
purchase through ODOT or the cities things that we both use such as sanding cinders and thermoplastic pavement
markings.
1
o,
~ N
c M
C N
O M
~
Ln
G1 r-4
Qj C of
U U
Lr~
a
W
` j O 01
tk„ T a M
%
-
O N tD
\ E to
O > tD
to O
V/
CL O
E
d
A,
W
d
C'
Z
x
N
W
N
LU
V
=
a°
o
K
3
co
W
V/
Lj
M
W
.
tt Ln
O4
0 w
U O
0
aQ
r
V
O
N
W
~
O
r
Tom
Ft
LL
.
I
a„
~ C o
v M
H
v
O ~ O
to a°
0 tD
co
C
t6
~
~
G1
s
O
DESCHUTES COUNTY ROAD DEPARTMENT
AnnPTFn RI tnf.FT 9011-2012
I
HTE
11-12
ADOPTED
ACTUAL
BUDGET
ROAD DEPARTMENT FUND 325
PAYROLL
PERSONNEL SERVICES:
325-5000431-1008
COUNTY SURVEYOR
88,097
325-6000.431-1010
PUBLIC WORKS DIRECTOR
130,521
325-5000431-1311
COMPUTER ANALYST / PROGRAMER
72,915
325.5000431-1399
COUNTY ENGINEER
116,300
325-5000431-1405
ENGINEERING ASSOCIATE
113,449
325-5000431-1406
ENGINEERING ASSOCIATE III
164,925
3254400.431-1414
SENIOR ENGINEERING ASSOCI
72,419
3254000431-1421
SURVEY RECORDS TECHNICIAN
56,211
3254000431-1430
GIS SPECIALIST II ANALYST / PROGRAMER
72,195
325-5000431-1432
PW GIS ANALYST
57,877
3254000431-1498
OPERATIONS MANAGER
105,057
3254000431-1546
EQUIPMENT OPERATOR
1,301,150
3254000431-1547
EQUIPMENT MECHANIC II
390,280
325-5000431-1508
AUTOMOTIVE SERVICE WORKER
46,078
3254000431-1511
ROAD MAINTENANCE SUPERVISOR
147,991
3254000431-1516
TRAFFIC DEVICE SPECIALIST II
104,412
325-5000431-1524
WEED OUTREACH & MGMT SPEC
73,075
325.5000-431-1805
INFORMATION SYSTEMS MGR
99,967
3254000431-1814
FLEET & EQUIPMENT MANAGER
66,637
3254000431-1830
SENIOR STORE CLERK
52,119
325-5000.431-1663
CALL BACK
325.5000431-1872
TIME MANAGEMENT EXP
49,000
325-5000431-1875
EXTRA HELP
70,000
325-5000431-1876
OVERTIME
70,000
3254000431-1877
ON-CALL
17,000
325.5000431-1879
CUSTOMER SERVICE CLERK
101,431
325-55000-431-1883
ACCOUNTING TECHNICIAN
107,972
3254000431-1864
SR ADMIN SECRETARY (14J)
56,474
325.5000.431-1915
CELL PHONE ALLOWANCE
4,260
**********SALARY SUBTOTAL*********
3,807,812
3254000431-2110
PR LIFE & DISABILITY INSURANCE
26,923
325 soon-431-2150
HEALTH/DENTAL INSURANCE
842,011
3254000431-2160
DEPT EMPLOYEE HEALTH CO-PAY
325-5000431-2201
FICA/MEDICARE
285,626
3254000431-2301
PERS - EMPLOYEE/EMPLOYER
467,115
3254000431-2350
PERS - FUND 135 FOR D/S
0
325-5000431-2355
PERS - RESERVE FOR FUTURE
0
3254000431-23%
UAUSURPLUS AMORT (135)
0
3254000431-2501
UNEMPLOYMENT INSURANCE
17,385
325-5000-431-2601
WORKERS COMPENSATION
76,223
325-5000431-2901
RETIREE HEALTH INSURANCE
91,436
325-5000431-2908
ADMIN FEES - SECTION 125
792
**********INSURANCE SUBTOTAL******
1,807,511
TOTAL PERSONNEL SERVICES
5,615,323
Prepared by: K Putschler
8/4/2011 3:35 PM
DESCHUTES COUNTY ROAD DINAR I MIN I
ennDTCn n Ir)r,FT )n11-gn1q
HTE
-
11-12
ADOPTED
i ACTUAL
BUDGET
j
ROAD DEPARTMENT FUND 325
EXPENSE
MATERIALS & SERVICES:
PROFESSIONAL SERVICES
325-SOM431-3333
Drug Testing - on going employees
500
325-5000431-3355
Engineering
15,000
325-5000-431-3375
Medical Hearing
700
TECHNICAL SERVICES
325-5000431-W7
Testing Services (DMV)
200
325-5000.431-34M
Microfilming / Imaging
1,500
325.0000-4313415
Auctioneering
325.50004313417
Dispute Resolution
325-5000-4313420
Temporary Help - Admin
2,000
325-50004313425
Temporary Help-Labor
320,000
325-5000-4313426
Education Providers
325-5000-431-3443
Surveying
325-50004313447
Vehicle Tow
2,000
INTERFUND SERVICES
325-5000-4313505
Archive Fees
111
325.50004313530
CDD Charge (Transportation Planning)
54,226
325-6000.3313662
GIS (Geri)
24,851
325-50004313567
Sheriff Services (radio)
39,136
325.5000-4313620
Building Services Charge
87,599
3255000-4313625
Administrative Services
110,659
325-5000-431-3626
BOCC
45,283
325-5000-431-3630
Finance Service Charge
103,898
326-5000431-3640
Legal Counsel
25,242
325-50004313650
Personnel Services Charge
55,569
325-'000-431-3M
Information Services Charge
111,340
3255000-4313661
IT Server Charge - (Tech Reserve)
15,812
UTILITY SERVICES
325-6000431-4110
Water & Sewer
20,000
325-5000-4314120
Portable Toilet
1,000
325-5000-431-4210
Garbage
500
325-50004314220
Cleaning Service - Custodial Janitorial
2,500
325-5000.4314260
Cleaning Service - Uniforms
6,000
3255000.4314260
Cleaning Service - Off Site Maintenance
REPAIRS & MAINTENANCE
325-5000.4314310
Computer Repairs/Software Maint Agreement
42,000
325-5000-4314315
Computer Repairs/Maintenance
8,000
325.50004314320
Bldg Repairs & Maintenance
20,000
3255000-4314330
Equipment Repairs/Maintenance
60,000
00
Equipment Repairs/Maint Supplies -
05
Accidents - Risk Management -
07
Solid Waste Repairs -
08
County Fair Grounds -
325-50004313335
Security & Radio Maintenance
1,000
3255000 431-4340
Repairs/Maint Office Equipment
325-5000-431-4345
Maintenance Agreements / Office
2,000
Prepared by: K Putschler
8/4/2011 3:35 PM
DESCHUTES COUNTY RUAU ULVAK I MtN I
Anr)PTi=n RI inr.FT gn11-9n1q
HTE
- - -
11-72
a
ADOPTED
ACTUAL
BUDGET
ROAD DEPARTMENT FUND 325
RENTALS
325-5000-4314410
Copy Machine Rental
9,600
325-5000.4314420
Other Office Equipment Rental
1,600
325-5000-431.4440
Equipment RentaVLease - Heavy Equipment
50,000
325-50004314461
1nterfund Bldg Rent - new add to project fund
37,089
OTHER SERVICES
325-50004315010
Membership/Dues
2,000
325-5000431-solo
Professional License & Fees
1,000
325-6004031-6030
Conferences & Seminars
15,000
325-5000-431-5040
Education & Training
17,000
325-5000431-5070
Software Licenses
7,000
FEES AND PERMITS
325-50004315110
Permits & Fees
500
INSURANCES OTHER THAN EMPLOYEE BENEFITS
3255000.4315210
General Liability Insurance Charge
37,109
325-50004315220
Property Damage Insurance Charge
42,305
325-50004315230
Vehicle Insurance Charge
20,295
COMMUNICATIONS
325-5ooo-431531o
Telephone
4,500
325-50004315330
Cellular
5,500
ADVERTISING
325-50004315401
Advertising
500
32550004315402
Advertising - direct charges
PRINTING
3255000-4314610
Printing Expense
1,000
TRAVEL
325-50004315620
Meals
4,000
325-50004315=
Accommodations
14,000
325-50004315640
Airfare
1,500
325-5000431-5850
Ground Transportation - parking fees
100
325-5000431-5670
Mileage Reimbursement
1,200
GRANTS, LEANS AND REIMBURSEMENTS
325-5000.431-5906
Commute Options
8,000
325-50004315998
Refunds & Adjustments
SUPPLIES
3265000.431.6104
Computer Supplies
6,000
3255000.431.6110
Custodial Supplies
325-5000.431-6122
Educational Supplies
325-5000-431-6131
Engineering Supplies
4,000
325-5000-431-6132
Equipment Repairs/Maintenance - Supplies
275,000
oo
Shop -
o5
Accidents - risk Management -
07
Solid Waste Repairs -
08
County Fair Grounds -
325-5000431-6134
General Supplies
5,000
325-5000.4315140
Lube
23,000
325-50004315155
Office Supplies & Copy Machine Supplies
6,000
325-5000-431.6161 '
Postage & Freight
2,000
32560004316171
Building/Grounds R&M Supplies
2,000
3256000-4315172
Radio R/M Supplies
1,000
325-5000431.6173
Road Maintenance Supplies
8,000,
3256000-4316176
Road Striping Supplies
4,000
Prepared by: K Putschler
8/4/2011 3:35 PM
DESC_HUTES CUUN I Y KUHU Utr-Mll i nnC1'11
AnOPTFD RUDGET 2011-2012
NTE
11-12
ADOPTED
ACTUAL
BUDGET
ROAD DEPARTMENT FUND 325
325.5000431-6179
Safety Supplies
8,000
325-5000-431-6183
Shop Supplies
33,000
325-5000-431-6189
Surveying Supplies
6,000
325-5000431-6194
Tires
60,000
325-5000-431-6195
Traffic Safety Supplies
5,000
325-5000-431-6196
Vegetation Supplies
1,000
ENERGY
325-5000-431-6210
Electricity
58,000
325-5000.431-6215
Direct Electricity
7,000
325-50044314220
Gas & Diesel
900,000
325-5000431-6230
Heating OiVPropane Gas
2,000
325-5000-431-6240
Natural Gas
55,000
FOOD
3255000-431.6320
Meeting Supplies
250
BOOKS & PERIODICALS
3254000431-6410
Subscriptions
500
325-5000431-6420
Books
500
ROAD
3254000431-6501
Contract Road Services
50,000
325-5000-431-6510
Asphalt & Aggregate
3,600,000
325-5000-431.6515
Herbicide Chemical (Weed)
120,000
325-5000.431-6x20
Culvert Pipe
20,000
325-50004316530
Signs
45,000
3255000431-6535
Road Striping
450,000
325-50004316540
Bridge & Guard Rail
25,000
325-5000-431-8598
Preservation Services / Overlays
2,800,000
01
Millican -
02
Miscellaneous
MINOR EQUIPMENT
3254000431-6620
Storage Units
325-5000431.6650
Minor Tools & Equipment
30,000
3254000431-6654
Construction Signs
10,000
325-5000431-6658
Radios
55,000
325-5000431-6660
Minor Office Furniture & Fixtures
10,000
325-5000431-6665
Minor Office Equipment
1,000
325-5000-431-6670
Computers & Peripherals
25,000
TOTAL MATERIALS & SERVICES
10,172,674,
Prepared by: K Putschler
8/4/2011 3:35 PM
DESCHUTES COUN-1 Y KUP1U UtVAM 1 MtN 1
nnnpTGn Rl lnr,FT qnl l-gnlq
HTE
11-12
ADOPTED
ACTUAL
BUDGET
ROAD DEPARTMENT FUND 325
MRCIP PROJECTS:
325-9000431-9120
R of W Acquisition
40,000
325-500043,-9320
Transportation system
11181,691
01
Deschutes Junction - Phase 2
02
Millican Road - 50,000
Burgess Park-n-Ride - 25,000
Sunriver Drainage -10,000
19th St Construction Reserve(+ $1,096,691 stp fund)
325-5000-431-9321
City Projects -
325-5000-431-9330
Traffic Safety
15,000
325-5000-431-9335
Bridges
325-5000431-9340
Special Construction Projects
325-5000.431-9430
Furniture & Fixtures
TOTAL CAPITAL PROJECTS
1,236,691
TRANSFER
325-5000-491-9631
Bldg & Equipment - Fund 330
600,000
TOTAL TRANSFER
600,000
325-5000.501-9701
OPERATING CONTINGENCY
2,019,152
9eoo
UNAPROPRIATED BALANCE
TOTAL EXPENSE ROAD FUND(325)
19,643,840
0
10.28°x6
Prepared by: K Putschler
8/4/2011 3:35 PM
j:.
Q)
00
CU N
O
NO
7 O
t o N -~T
1 M
DESCHUTES COUNTY ROAD DEPARTMENT
ADOPTED BUDGET 2011-2012
r~
HTE
I
I
j 11-12
ADOPTED
ACTUAL
BUDGET
ROAD DEPARTMENT FUND 325
325-0000-301-0000
j
BEGINNING CASH BALANCE _
2,834,720
$ 3,349,254
REVENUE
I
_
325-0000-322-2500
i
System Development Charge (Fund 336)
325-0000-331-0100
I Federal Grants - (EECBG Grant Burgess Park-N-Ride)
20,000
Federal Receipts
325-0000-332-1000
_
Federal Reimbursements (Forest Hwy Road maint- Cascade Lakes)
600,000
325-0000-332-1300
Mineral Lease Royalties
40,000
325-0000-332-1400
Forest Receipts
1,311,162
~State Grants
325-0000-334-1200
STP -
325-0000-335-1100
_
I State Miscellaneous
500,041
325-0000-335-4200
'
Motor Vehicle Revenue
11,340,000
325-0000-338-1200
325-0000-338-1300
325-0000-335-1400
;
;
City of Bend
City of Redmond
City of Sisters
275,000
350,000
10,000
325-0000.338-1500
_
City of La Pine
10,000
325-0000-301-1900
Sale Map Photo or Copies - GIS Services
325-0000-341-2800
Admin Recovery (SDC)
1,000
325-0000-343-1300
Miscellaneous
20,000
02
Traffic Permits - $10,000
03
Access - Engineering Fees - $10,000
325-0000-348-1400
Road Vacations
1,000
325-0000-361-1100
Interest
20,000
325.0000-361-1300
Other Bank - LGIP Interest
325-0000-363-1300
Parking Fee - State of OR space on compound
144
-
:J
REVENUE FOR INTERNAL SERVICES (INSIDEDESCHCNTY)
325-0000-370.1000
_
Interfund Contract - survey/comer fund
730,000
325-0000-370-1200
Equipment Repairs
200,000
04
Equipment Repairs -
07
Solid Waste Repairs -
05
Accidents - Risk Management -
325-0000-370-3000
Miscellaneous Fee - Servicing/Repair Fund 340
90,000
325-0000-370-3100
Engineering Services - LID Fund 430
10,000
325-0000-370-3300
Vegetation Management - Fund 326
71,500
325-0000-370-3800
Forester - Fund 326
25,000
325-0000-370-3900
Car Washes
3,500
325-0000-370-4000
Car Rental
3254000-370-4500
Signage
2,000
325 0000 370-5-000
Fuel
450,000
I
REVENUE FOR INTERNAL TRANSFERS (INSIDE DESCH CNTY)
325-0000-391-3500
;
Fr Solid Waste (610)
285,773
325-0000-3914100
Transportation SDC (336)
250,000
325-0000-391-0000
Rd Improve Reserve Fund 335 - Rd 45 STP
12,000
REVENUE FOR EXTERNAL SERVICES (OUTSIDE DESCH CNTY)
325-0000-392-1200
Sale of Material & Services
325-0000-392-1201
Fuel (Gasoline & Diesel)
3250000 392,202 ;
Striping - (crook & jefferson cnty)
175,000
325-0000-392-1204
' Weed Spray
2,000
325-0000-392-1206
GIS Sales
1,500,
325-0000-392-1207
Survey Equipment & Materials
Prepared by: K Putschler
8/4/2011 3:35 PM
DESCHUTES COUNTY ROAD DEPARTMEN I
nnnoTCn Q r) AFT )nil--miq
iJ
F- HTE
-
11'12
*
ADOPTED
ACTUAL
BUDGET
ROAD DEPARTMENT FUND 325
3254000-392-1208
Hay Testing
2,500
325-MO-392-1300
Sale Public Lands
,
325-0000-392-5000
Sale of Reportable Assets
REVENUE
16,809,120
1
TOTAL ROAD FUND INCOME
19,643,840
Prepared by: K Putschier
8/4/2011 3:35 PM
Deschutes County Road Department
Shared Services with Outside Agencies
The Road Department partners with numerous public agencies at the local, state, and federal
levels in an effort to provide more cost effective services. The County has entered into formal
IGA's for the sharing of maintenance services with the City of Bend, City of Redmond, City of
La Pine, Jefferson County, and Crook County. The county is also a partner in a state-wide IGA
for the sharing of equipment and personnel in response to emergencies.
Some examples of our shared services:
The County chip seals roads for the Cities of Bend, Redmond and Sisters. The cities are billed
for the service at our cost (includes overhead). This is beneficial for all agencies as it provides
better utilization of the county's equipment and maintains the city streets at a lower cost than
they would otherwise be able to achieve.
The County provides pavement striping for numerous other agencies including: The City of
Redmond, City of Sisters, Crook County, Jefferson County, City of Madras, and USFS. This
provides striping to other jurisdictions at a reasonable cost while providing us with better
utilization of an expensive and specialized piece of equipment.
The Road Department and the cities share equipment for numerous other work activities
throughout the year. Both Redmond and Bend provide the County with street sweeping in our
public works compound and other areas where our sweepers lack the capacity to pick up loose
material. The City also provides the use of their vac-truck to regularly clean out the sump in our
vehicle wash bay.
The Road Department has agreements with both the USFS and BLM for cooperative road
maintenance. We exchange services in a number of activities, primarily grading roads in areas
where it is more convenient for one jurisdiction or the other to maintain (for example: we grade
Darlene Way, which is a BLM road in the La Pine area, and the BLM blades a number of gravel
County roads out in the desert for us).
USFS and BLM provide rock and cinder sources for county use (fees are typically waived in
exchange for in-kind work).
The Road Department and ODOT have worked together to assist the City of La Pine in graveling
some of their city streets. The City of La Pine contracts out snowplowing of city streets and
provides plowing on a number of county maintained local roads under their contract.
ODOT and the County work cooperatively to provide winter maintenance on River Summit
Drive (Sunriver to Mt. Bachelor). ODOT provides their snowblower on the upper section of the
road as needed and the County provides plowing for the state run sno-park area near Edison
Butte. This arrangement has saved the county the huge expense of buying a new snowblower
and has better utilized the equipment that ODOT already has working in the area.
The County also cooperates with other local, state, and federal agencies in emergency situations.
We have provided equipment, and personnel to assist in emergency road closures, wildfire
fighting assistance, winter storm response, and flooding. (e.g. in 2008 we assisted the City of
Vernonia and Columbia County with clean-up efforts after the severe winter storms and
flooding).
The County recently entered into an agreement with DEQ to provide an air quality sampling site
at the Road Department complex. This arrangement saved the DEQ the expense of having to site
the facility on private land.
The County cooperates with a number of agencies to provide noxious weed control. The sharing
of the county's expertise and specialized spraying equipment has been a great benefit for all
Central Oregon government agencies.
Pagel of 3
279B.030 Demonstration that procurement will cost less than performing service or that
performing service is not feasible; exemptions. (1) Except as provided in ORS 279B.036, before
conducting a procurement for services with an estimated contract price that exceeds $250,000, a
contracting agency shall:
(a) Demonstrate, by means of a written cost analysis in accordance with ORS 279B.033, that the
contracting agency would incur less cost in conducting the procurement than in performing the services
with the contracting agency's own personnel and resources; or
(b) Demonstrate, in accordance with ORS 279B.036, that performing the services with the
contracting agency's own personnel and resources is not feasible.
(2) If a local contracting agency authorizes a department, bureau, office or other subdivision of the
local contracting agency to conduct a procurement on behalf of another department, bureau, office or
subdivision of the local contracting agency, the department, bureau, office or subdivision on whose
behalf the procurement is conducted shall comply with the requirement set forth in subsection (1) of this
section.
(3) Subsection (1) of this section does not apply to:
(a) A local contracting agency or a local contract review board for a city that has a population of not
more than 15,000 or a county that has a population of not more than 30,000;
(b) A community college that enrolls not more than 1,000 full-time equivalent students, as defined in
ORS 341.005;
(c) A special district, as defined in ORS 198.010, a diking district formed under ORS chapter 551
and a soil and water conservation district organized under ORS 568.210 to 568.808;
(d) The Port of Portland; or
(e) Procurements for client services, as defined in OAR 125-246-0110. [2009 c.880 §2]
279B.033 Contents of cost analysis; conditions under which procurement may proceed;
exceptions. (1) In the cost analysis required under ORS 279B.030, a contracting agency shall:
(a) Estimate the contracting agency's cost of performing the services, including:
(A) Salary or wage and benefit costs for contracting agency employees who are directly involved in
performing the services, including employees who inspect, supervise or monitor the performance of the
services.
(B) Material costs, including costs for space, energy, transportation, storage, raw and finished
materials, equipment and supplies.
(C) Costs incurred in planning for, training for, starting up, implementing, transporting and
delivering the services and costs related to stopping and dismantling a project or operation because the
contracting agency intends to procure a limited quantity of services or procure the services within a
defined or limited period of time.
(D) Miscellaneous costs related to performing the services. The contracting agency may not include
in the cost analysis the contracting agency's indirect overhead costs for existing salaries or wages and
benefits for administrators or for rent, equipment, utilities and materials except to the extent that the
costs are attributable solely to performing the services and would not exist unless the contracting agency
performs the services.
(b) Estimate the cost a potential contractor would incur in performing the services, including:
(A) Average or actual salary or wage and benefit costs for contractors and employees who:
(i) Work in the industry or business most closely involved in performing the services that the
contracting agency intends to procure; and
(ii) Would be necessary and directly involved in performing the services or who would inspect,
supervise or monitor the performance of the services;
(B) Material costs, including costs for space, energy, transportation, storage, raw and finished
materials, equipment and supplies; and
(C) Miscellaneous costs related to performing the services, including but not limited to reasonably
foreseeable fluctuations in the costs for the items identified in this subsection over the expected duration
http://www.leg.state.or.us/ors/279b.htinl 8/10/2011
Page 2 of 3
of the procurement.
(2)(a) After comparing the difference between the costs estimated as provided in subsection (1)(a) of
this section with the costs estimated as provided in subsection (1)(b) of this section, except as provided
in paragraph (b) of this subsection, the contracting agency may proceed with the procurement only if the
contracting agency would incur more cost in performing the services with the contracting agency's own
personnel and resources than the contracting agency would incur in procuring the services from a
contractor. The contracting agency may not proceed with the procurement if the sole reason that the
costs estimated in subsection (1)(b) of this section are lower than the costs estimated in subsection (1)(a)
of this section is because the costs estimated in subsection (1)(b)(A) of this section are lower than the
costs estimated in subsection (1)(a)(A) of this section.
(b) A contracting agency may proceed with a procurement even if the contracting agency determines
that the contracting agency would incur less cost in providing the services with the contracting agency's
own personnel and resources if at the time the contracting agency intends to conduct a procurement, the
contracting agency lacks personnel and resources that are necessary to perform the services within the
time in which the services are required. If the contracting agency conducts a procurement under the
conditions described in this paragraph, the contracting agency shall:
(A) Keep a record of the cost analysis and findings that the contracting agency makes for each
procurement the contracting agency conducts under this section, along with the basis for the contracting
agency's decision to proceed with the procurement; and
(B) Collect and provide copies of the records described in subparagraph (A) of this paragraph each
calendar quarter to the local contract review board, if the contracting agency is a local contracting
agency, or to the Emergency Board, if the contracting agency is a state contracting agency.
(c) If the contracting agency is a state contracting agency, in addition to complying with the
provisions of paragraph (b) of this subsection the contracting agency shall prepare a request to the
Governor for an appropriation and any authority that is necessary for the contracting agency to hire
personnel and obtain resources necessary to perform the services that the contracting agency procured
under the conditions described in paragraph (b) of this subsection. The request must include a copy of
the records that the contracting agency provided to the Emergency Board under paragraph (b)(B) of this
subsection.
(3) A cost analysis, record, documentation or determination made under this section is a public
record. [2009 c.880 §3]
279B.036 Determination of feasibility of procurement. (1) Notwithstanding the provisions of
ORS 27913.033 (2)(a), a contracting agency may proceed with a procurement if the contracting agency
reasonably determines in writing that using the contracting agency's own personnel or resources to
perform the services that the contracting agency intends to procure is not feasible. The contracting
agency may make the determination described in this subsection without conducting a cost analysis
under ORS 279B.033 if the contracting agency finds that:
(a) The contracting agency lacks the specialized capabilities, experience or technical or other
expertise necessary to perform the services. In making the finding, the contracting agency shall compare
the contracting agency's capability, experience or expertise in the field most closely involved in
performing the services with a potential contractor's capability, experience or expertise in the same or a
similar field.
(b) Special circumstances require the contracting agency to procure the services by contract. Special
circumstances may include, but are not limited to, circumstances in which:
(A) The terms under which the contracting agency receives a grant or other funds for use in a
procurement require the contracting agency to obtain services through an independent contractor;
(B) Other state or federal law requires the contracting agency to procure services through an
independent contractor;
(C) The procurement is for services that are incidental to a contract for purchasing or leasing real or
personal property, including service and maintenance agreements for equipment that is leased or rented;
http://www.leg.state.or.us/ors/279b.html 8/10/2011
Page 3 of 3
(D) The contracting agency cannot accomplish policy, administrative or legal goals, including but
not limited to avoiding conflicts of interest or ensuring independent or unbiased findings in cases when
using the contracting agency's existing personnel or persons the contracting agency could hire through a
regular or ordinary process would not be suitable;
(E) The procurement is for services to which the provisions of ORS 279B.080 apply;
(F) The procurement is for services, the need for which is so urgent, temporary or occasional that
attempting to perform the services with the contracting agency's own personnel or resources would
cause a delay that would frustrate the purpose for obtaining the services; or
(G) The services that the contracting agency intends to procure will be completed within six months
after the date on which the contract for the services is executed.
(2) A finding or determination and supporting documentation for a finding or determination made
under this section is a public record. [2009 c.880 §4]
Note: Section 4a, chapter 880, Oregon Laws 2009, provides:
Sec. 4a. (1) The Oregon Department of Administrative Services, in consultation with contracting
agencies and representatives of employees of contracting agencies that are subject to sections 2
[279B.030], 3 [279B.033] and 4 [279B.036] of this 2009 Act, shall evaluate the extent to which the
provisions of sections 2, 3 and 4 of this 2009 Act aided the contracting agency in making a
determination as to whether to procure services or to perform services with the contracting agency's
own personnel and resources.
(2) The department shall report the results of the consultation and evaluation to the Legislative
Assembly on January 10, 2011. [2009 c.880 §4a]
http://www.leg.state.or.us/ors/279b.html 8/10/2011