2015-126-Resolution No. 2015-015 Recorded 4/13/2015 DESCHUTES
BLANKENSHIP, COUNTY CLERK
�d �+��1Z6
NANCY
REVIEWED COMMISSIONERS' JOURNAL 04/13/2015 08;08.54 AM
0 - 11 II 1 1111111111111111111
LEGAL COUNSEL Z 1
For Recording Stamp Only
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON
A Resolution Initiating Proceedings to *
Legalize a portion of Tetherow Road, in * RESOLUTION NO. 2015-015
Deschutes County, Oregon.
WHEREAS, ORS 368.201 established County authority to initiate road legalization
proceedings; and
WHEREAS, a portion of Tetherow Road in Deschutes County, Oregon has been traveled
and used for more than 10 years in a way which does not conform to its location as described in
the County records; and
WHEREAS, the Board of County Commissioners seeks to legalize a portion of Tetherow
Road according to the process established by ORS 368.201 to 368.221; now, therefore,
BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS FOR DESCHUTES
COUNTY, OREGON, as follows:
Section 1. Proceedings for legalization of a portion of Tetherow Road beginning 75 feet
westerly of the east line of the Central Oregon Park and Recreation Districts "Tetherow Crossing
Park" and ending at the north property line of Tax Lot 141236D000400 in Deschutes County,
Oregon, as shown in Exhibit "A" attached hereto and incorporated herein, are hereby initiated
pursuant to ORS 368.201.
DATED this C" .:.: day of r, CL- L. � ..... , 2015.
BOARD OF COUNTY COMMISSIONERS
OF DESCHUTES COUNTY, OREGON
0
ANTHONY DEBONE, CHAIR
ATTEST: aLVIL /
ir
ALAN UNGER, VIC AIR
Recording Secretary I 1:1�s2
TAMMY NEY, MISSIONER
PAGE 1 OF 1 --RESOLUTION NO.2015-015
Exhibit "A"
1 of 2
Legal Description for the 2015 Legalization of
A Portion of Tetherow Road
A 60.00 foot wide strip of land for roadway and utility purposes located in the Southwest
one-quarter of the Northeast one-quarter (SW1/4 NE1/4), the Southeast one-quarter of
the Northeast one-quarter (SE1/4 NE1/4) and the Northeast one-quarter of the
Southeast one-quarter (NE1/4 SE1/4) of Section 36, Township 14 South, Range 12 East
of the Willamette Meridian, Deschutes County, Oregon, lying 30.00 feet on either side of
the following described centerline:
Commencing at the 5/8" rebar monumenting the Southwest Corner of Lot
9, Block 2, Tetherow Crossing Phase II; thence along the north right-of-
way line of Yucca Avenue N86°21'18"E a distance of 595.17 feet to a 5/8"
rebar monumenting the Southeast Corner of Lot 7, Block 2, Tetherow
Crossing Phase II; thence leaving said Yucca Avenue right-of-way line,
S87°16'05"E a distance of 1136.35 feet to a point at the centerline of the
1892 Barnett Road identified as Point "B" on the survey filed at the
Deschutes County Surveyor's Office as CS18696 titled "2014 Right-of-
Way Map For the Legalization of a Portion of Tetherow Road", said Point
"B" being Engineer's Station 30+00.00 and the Point of Beginning of this
2015 centerline description; thence S88°41'11"E a distance of 24.66 feet
to Engineer's Station 30+24.66 P.I; thence S64°42'32"E a distance of
148.40 feet to Engineer's Station 31+73.06 P.C.; thence 106.97 feet along
the arc of a 631.87 foot radius curve to the left, the long chord of which
bears S69°33'32"E a distance of 106.84 feet to Engineer's Station
32+80.03 P.T.; thence S74°24'31"E a distance of 81.02 feet to Engineer's
Station 33+61.05 P.C.; thence 219.69 feet along the arc of a 413.18 foot
radius curve to the right, the long chord of which bears S59°10'35"E a
distance of 217.11 feet to Engineer's Station 35+08.74 P.T.; thence
S43°56'39"E a distance of 213.41 feet to Engineer's Station 37+94.15
P.C.; thence 65.53 feet along the arc of a 335.12 foot radius curve to the
left, the long chord of which bears S49°32'45"E a distance of 65.42 feet to
Engineer's Station 38+59.68 P.T.; thence S55°08'50"E a distance of 23.51
feet to Engineer's Station 38+83.19 P.C.; thence 65.00 feet along the arc
of a 160.00 foot radius curve to the left, the long chord of which bears
S66°47'08" E a distance of 64.55 feet to Engineer's Station 39+48.19
P.C.C.; thence 84.84 feet along the arc of a 80.00 foot radius compound
curve to the left, the long chord of which bears N 71°11'45"E a distance of
80.92 feet to Engineer's Station 40+33.03 P.T.; thence N40°48'55"E a
distance of 61.24 feet to Engineer's Station 40+94.27 P.C.; thence 250.64
feet along the arc of a 2470.37 foot radius curve to the left, the long chord
of which bears N 37°54'31" E250.54 feet to Engineer's Station 43+44.92
P.T.; thence N35°00'07"E a distance of 104.67 feet to Engineer's Station
44+49.58 P.C.; thence 8.29 feet along the arc of a 320.17 foot radius
curve to the right, the long chord of which bears N35°44'37"E 8.29 feet to
Engineer's Station 44+57.87 P.O.C., at the east-west centerline of said
Section 36, being the easterly Terminus Point of this centerline
description, from which the 3" diameter aluminum Deschutes County
Surveyors Office cap stamped "L.S. 804" marking the east one-quarter
corner of said Section 36 bears S89°34'45"E a distance of 347.23 feet
J:\CAD\Projects\W660-1ETHEROW-SLIDE\DOC\Tetherow Road Legalization 2015-IgIdocx Page I of 2
3/3/2015
rr)
o
/\ tit M
M :w CO ° �v,,_. \ O t7
0
? ¢ ¢in M w�O ¢ ° Q.)M I-
W m N)a cn 15
o w ¢ \ • u ¢ >,_ o 0
CC O U 0 o \ • . C? J J ° (n
\ � ° '"� , or, I-
0 (0 zm'V) am
�' o °o ♦1 -1 1- f: 0(
a
•�1
z• � Z 0� COO NI- o � N �
CC m(n J �. COs' �1 0 n a ad Ni w
31- \ WV)Z X 10 N1- OpcVcO0
3wZ� Z�0 �"� ^ gJ '''.... _
f-�• O \ � Q /�. le* J W W W W w W CU Et
ap¢ o= Q s I— m Cr r- N .- CO cc) N
cc)Li �x '4111 i �� < r�] N N Lt-) o W U. z
N�ZQ \ UWC? I G°c •• 9 11. J W N d- •I N VI 0 Y _ ❑
� QO N r 11 J_ Q ,��1 I Z CO coo 1- n re) O in ,., H CO L U)Z I �M w • bp' • / 7 cn CO i z z Z w
_
zZCOO Z¢W¢J 41 \ 10Q I Cr' •X • C". 47 , Z Lu
J J J J O C�
O r2 I--- � • OD• _I
.x < U
oo=wo w� I o G"'� N Ill in
d ¢mN zo Q :'c _ J o•I ¢ pr] • ��O 00• _ � � Ntom Q rn
J IxM v ��O Z ``'Q O• NcOcO4 ,n0o 111 `M
N
p I 0
HN /'`(('' Q Q 3�Q W w w w J ¢ 3
CC N N_ R a W
Wz .<1.
J ci_ ~J 2 N in LO CO In ! M U
Q � o T. < \n< U r� rri * Q � rr) ^ Q \ 0
h- Q Up .t� W W a W r) O M '- * * 0 m
LA W
LL ° I ry sX J I- ,1 J M t '0 w co
�� oQ C_) 8 Q� 0) � rncor- r, in z • 3
C.,o_ U I 0 >_. 1-Z W c0 in cO rr) m O •0
¢ �cD I 5t 7 X00 W V) Z Z in U
�� �U1-ro / f S (c% WJL- ° Nk in Qr - O p0
o mZ v I ~ . '� pC' �J1-6 7 05 / 10 I- _ ccnn W N cv r r � N w ` a o 0
z)m w `' W W >Z n m Q ,- N (QD in r.-- I z Q w rn
Q N¢ N> �' / � zC'w0= III � LN
O Fw °r� I U ¢ � i ? U� ¢ co ccooa)a) . ~ \.Q 00
o cv in
z0WZ IN. y W QI.,.I < ~ rn rN M r ° W ccAw
W F 0 I w wO..N i 0 CO w w =�..
¢ W 0m rn� 7 j n 00 n_I 0 0 1� O Q Li
=1 c°oQ \ v. I / ' zzCOw D ° 37: picriOC7I° O N ` C 0
W p T U ¢ r%7
(¢,�¢ W 4 a V)o (t (0 r`) ,- 03 d• r)) c cD
,,I Q w 30+24.66 P.I. 3 0 0 W° -- N LL.I 1- n i
Jo✓ �o= 0+00.00. P.0.6.W1 . � Y oQ �zQ n ' i� O4b - zw °, 3 di Wes¢ F.-0 ce Z cnai � QDO � N ,1- 1-x a'
�� W 0_ N F-- W C] c0 c0 0D to 00 `¢ O
W c �U / �ZV)ZW J .- N N 0. q' -
¢? WVZ � azu)
W
r w • J m••• co > •- N rv) in cO N -T 0
ago UUUUUUUU Ia1 � I- w
in ~I� 111 /� - F= ry s
in 3 in ter--- I •aZl MON3M131 `t i) LU L w N
° Z o) T .-. ,c;, 0, __j LJ ..., o_
W LLI E, cei Li \ u 01 M��'aoOw n, a�i NOZ= ca W '~'=�1`:��w ` ° �° o
ZNzmNO � Q QUoUW�cw � Q �� ' �_ ¢
Q]GV)dD0 Si? I U I 0010¢ CC Z U w
QpOa0n 0 V/)QCOH00 Cl- �:1j a))
wwCC 0W 00 y J'� p. se_..dit
_U V)mUHJ V) m 1 ! i
uaTcn
■_. ‘,.,.__?.-
a ...rc'�" ••• . - . w� -:eron „ '444'At .i Hsi U 0 w O
v
vi -d
_... �' C
6r2rnrrnz:a.raarvaN(Ca i'ial,is'arnz 3,zII,QZOON �
Z '070 SNIVN7 0Y HlaON - w Q
O z '
a I
2
I—. g fit .•
0 .t r
V
Li 1• a o
Z 60 co 9
o a y
O.: W i 4 1 N .'4 1 rt.
,1 W },, } i 2 a
—.1 , OZh 4 K Le k ti■ �V
`•'lave �W "* � 2 A 4 � �IV
•L q q
�e e w
11 1 0 IA { x
C t "
'0 cr) • A ! ''. § 'ai r • ;
C5, S N aid a . 4, ,t... k
L.) -.. -, ", -,, \ i .
h (/Y),Fn•9Y9L 3,60,id,0AN(40 4.,M1,zr'9r9z 3,0i,rZ00N y 1 y
N VI vI
ti
rs
Lj .
A.
h 4, t (r0,9%•Maz,o0.00s p
}4 W 407,11: ...$ i t 4 „fi n qi
• .l �. �p0T71' "' i 44 701;
Ow • NA „».w ���_. ...�...._........... aii �3 7 ....,..._fit ,'^ .,-,▪ ;»• fi
+ 33
(rv1,[n•rrad$s0,rL00N(a1,z0YFaz-J„r[,rd:aoN
P
EXHIBIT B-3
NOTICE OF PUBLIC HEARING
BY THE BOARD OF COUNTY COMMISSIONERS
OF DESCHUTES COUNTY, OREGON
On April 22, 2015, at 10:00 a.m.,the Deschutes County Board of Commissioners will hold a
public hearing to consider a petition for annexation of certain property owned by Cameron and
Hodge Kerr into the Deschutes County Rural Fire Protection District#2. This hearing will be
held in the Board of County Commissioners' Hearing Room, First Floor, 1300 NW Wall Street,
Bend, Oregon. All interested persons may appear and be heard.
The property Petitioner proposes to annex is comprised of 219.4 acres, and is identified as 59700
Scalehouse Rd, Bend, OR 97702, Deschutes County, Oregon. To view a map and legal
description of the boundaries of the proposed annexation, contact the Deschutes County
Counsel's Office at 388-6624. The purpose of the proposed annexation is to provide vector
control and management services to the property proposed for annexation.
Deschutes County encourages persons with disabilities to participate in all programs and
activities. This event/location is accessible to people with disabilities. If you need
accommodations to make participation possible, please call (541) 388-6572, or send an e-mail to
bonnie.baker@deschutes.org.
Page 1 of 1 -EXHIBIT "2" - ORDER NO. 2015-019