Loading...
2017-585-Order No. 2017-033 Recorded 9/18/2017 Recorded in Deschutes County CJ2017-585 Nancy Blankenship, County Clerk Commissioners'Journal 09/18/2017 3:14:53 PM rite"o { tLIJIlIIIIUlIIIIlU11111III -585 Do not removethis page from original document. Deschutes County Clerk Certificate Page r IEWED Deschutes County Official Records 2017_37409 arm/' V Nancy Blankenship, County Clerk LEGAL COUNSEL IIIIIUhI IIIIIIIIIIIII II I II III IIIIIIIII I II III NO FEE 01136121201700374090080084 09118!2017 03:07:43 PM D-IPPS Cnt=1 Stn=2 JS This is a no fee document For Recording Stamp Only BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON In the Matter of Repealing and Amending Covenants, Conditions and Restrictions for * ORDER NO. 2017-033 Industrial Land in La Pine, OR * WHEREAS, Deschutes County owned (owns), developed and sold industrially zoned land in La Pine, Oregon; and WHEREAS, Deschutes County, as the owner and developer of the industrially zoned land in La Pine had the authority to create and apply Covenants, Conditions and Restrictions (CCR"S) to such lands to guide development prior to the incorporation of the City of La Pine; and, WHEREAS, the current applicable land use regulations adopted and administered by the City of La Pine are duplicative of the CCR's and are appropriate to now govern land development; and, WHEREAS, the CCR's for the La Pine Industrial Park (recorded with the Deschutes County Clerk at Vol. 321, Page 1574) and the Newberry Business Park (recorded with the Deschutes County Clerk at 2002-08641) were subject to a vote of the owners as specified therein for repeal and amendment respectively, saving the architectural requirements for the Newberry Business Park; and, WHEREAS, the result of the vote was in favor of the proposed repeal and amendments; and, WHEREAS, the architectural review standards for the Newberry Business Park shall continue to apply as amended; and, WHEREAS, a subcommittee of the Sunriver La Pine Economic Development board will act as the architectural review committee (ARC) for the Newberry Business Park; and, WHEREAS, upon adoption of architectural review regulations by the City of La Pine for the industrially zoned lands within the Newberry Business Park the architectural standards applicable through the CCR's shall automatically expire; now, therefore, THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON, HEREBY ORDERS as follows: Section 1. The CCR's for the La Pine Industrial Park (recorded with the Deschutes County Clerk at Vol. 321, Page 1574) are repealed in entirety. Section 2. The CCR's for the Newberry Business Park (recorded with the Deschutes County Clerk at 2002-08641) are amended to include only those architectural review, enforcement and administrative requirements as included in Exhibit A, attached hereto. PAGE 1 OF 2 ORDER NO 2017-033 Section 3. A 3-member subcommittee of the Sunriver La Pine Economic Development Board, as appointed from within, will serve as the Architectural Review Committee for the architectural standards applicable to the Newberry Business Park. Section 4. The CCR's applicable to the Newberry Business Park as contained in Exhibit A attached hereto shall automatically expire upon adoption of architectural regulations for industrially zoned lands by the City' of La Pine. DATED this 13 day of September, 2017. BOARD OF COUNTY COMMISSIONERS OF D CH TES COUNTY, OREGON f TAMMY AN Y, Ch at" ATTEST: ANTH• Y DEBONE, Vice it 1 G--- - r, —Recording SecretaryPHILIP G. HE it ERS , Commissioner PAGE 2 OF 2 ORDER NO 2017-033 Exhibit A to Order#2017-033 AMENDED DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS NEWBERRY BUSINESS PARK PURPOSE AND INTENT The purpose and intent of these Restrictive Covenants as adopted and imposed by the Declarant (Deschutes County) is to provide guidance for the architectural design of new construction in the Newberry Business Park, also known as the La Pine Industrial Site Phase III, which is depicted and described in Exhibit A. Except where this Declaration conflicts with any applicable government regulations, this Declaration shall be binding upon all owners, lessees, licensees, occupants and users of the property subject to this Declaration and their successors in interest as set forth herein. DESIGN PHILOSOPHY Newberry Business Park is being developed to foster the creation of family wage jobs in the La Pine Area by providing improved sites for smaller users within the overall La Pine Industrial Park. However, it is also the purpose of the Declarant to provide a business environment that will enhance La Pine's image as a business location in Deschutes County. The Architectural Controls included herein are intended to establish, preserve and protect a quality environment for its tenants and the La Pine community. It is the intent of the Declarant to ensure strict conformance with these Restrictive Covenants in order to adhere to this design philosophy. SECTION 1. DEFINITIONS 1.1 Block: The term Block shall mean those areas designated as Blocks on subdivision or partition maps according to the records of Deschutes County. 1.2 Declarant: The term Declarant shall mean Deschutes County. 1.3 Declaration: The Declaration shall mean this Amended Declaration of Covenants, Conditions and Restrictions for Newberry Business Park. 1.4 Design Review Committee: The Design Review Committee is that committee established at the sole discretion of and by Order of the Deschutes County Board of Commissioners. 1.5 Earth Tones: Subdued colors which are generally found in the surrounding landscape. 1.6 Improvements: The term improvements shall include but is not limited to, any buildings, outbuildings, fences and barriers, retaining walls, stairs, decks and all other structures above the land surface. 1.7 Lot: The term Lot shall mean the fractional part of the Blocks as divided and subdivided on subdivision or partition maps according to the records of Deschutes County. 1.8 Owner: Owner shall mean and refer to all holders of fee title to any Lot. 1 SECTION 2. PROPERTY SUBJECT TO THE COVENANTS, CONDITIONS AND RESTRICTIONS FOR NEWBERRY BUSINESS PARK 2.1 General Declaration Creating Newberry Business Park: Declarant hereby declares that all of the real property located in Deschutes County, Oregon, described in Exhibit A is and shall be hypothecated, encumbered, leased, occupied, built upon, or otherwise used, improved or transferred in whole or part subject to this Declaration. All of said Restrictions are declared and agreed to be in furtherance of the general plans of the subdivision and are established with the purpose of protecting the desirability and attractiveness of said real property and every part thereof. All of the Covenants, Conditions and Restrictions of Newberry Business Park run with all of said property for all purposes and shall be binding upon and inure to the benefit of Declarant and all Owners and their successors in interest as set forth in this Declaration. SECTION 3. ARCHITECTURAL CONTROLS 3.1 Design Review Committee: Declarant directs the creation of a Design Review Committee for the purpose of applying architectural controls within the Newberry Business Park. Such Design Review Committee shall be comprised of three members of which all three members shall be members of the city or any contracted agency's economic development advisory board. Upon the adoption of an architectural or design review committee by the City of La Pine, the Design Review Committee shall disband and transfer all responsibilities to the City of La Pine's Architectural or Design Review Committee. 3.2 Approval Required: No improvements shall be erected on any land subject to this Declaration until plans or specifications have been submitted to and approved in writing by the Design Review Committee. 3.3 Procedure: Prior to erecting or expanding any permanent structure on any land subject to this Declaration, any entity proposing to construct any improvements within Newberry Business Park shall follow the procedures and be subject to the approvals required by Paragraphs 3.4 through 3.8. Failure to follow such procedures or obtain such approvals as required by Paragraphs 3.4 through 3.8 below shall be deemed a breach of this Declaration. 3.4 Required Documents: Any owner proposing to utilize, improve, or develop real property within the Newberry Business Park shall submit to the Design Review Committee the following items for review: (A) A full set of stamped architectural plans including building elevation drawing 3.5 Review: All plans and drawings identified in Paragraph 3.4 above shall be submitted to the Design Review Committee for review prior to construction of any permanent structure. The Design Review Committee shall review the plans and shall inform the owner of the proposed facility in writing whether the plans conform to Design Review Committee standards. Those plans that are professionally executed better aid the Design Review Committee in determining the conformity of the plans. In the event owner is not notified as to the conformity of the plans within the 30-day review period, the plans are conclusively presumed to be approved as submitted. In the event any aspect of any 2 of the development plans does not conform to the Design Review Committee standards, the owner shall resubmit those non-conforming portions of the plans for review in accordance with the procedures outlined in Paragraph 3.4 above, and this Paragraph. No permanent structures may be constructed unless and until all aspects of all plans required under Paragraph 3.4 above have been approved by the Design Review Committee. 3.6 Architectural Guidelines: The development concept for the Newberry Business Park shall be determined by the Design Review Committee in accordance with applicable statutes, ordinances, regulations, zoning and other governmental land use controls. In an effort to maintain architectural integrity of the Newberry Business Park, the Design Review committee shall require any new construction in the Newberry Business Park to comply with the following six architectural guidelines: 1. All building exteriors shall be in an earth tone color scheme. 2. Raw materials shall not be visibly stored between the road and new building. 3. If process design allows, Public Entrance to new facilities may not be on North side of the building for winter safety. 4. All buildings shall have covered public entryways. 5. All buildings shall 2 foot eaves visible from the road. Special consideration will be given to any building pursuing LEED certification. Architectural guidelines setting forth various aspects of the development concept, in addition to this Declaration, may be published from time to time by the Design Review Committee, but the Design Review Committee shall not be required to do so. The Design Review Committee shall have the right to alter, rescind, or amend any published guidelines without prior notice to any party; provided however, that once approval has been given pursuant to Paragraph 3.5 above, work may proceed in accordance with the approved plans and drawings, notwithstanding any changes in the development concept. All such guidelines shall be in general conformity with this Declaration. 3.7 Inspection: All work related to any building, structure, or facility within the Newberry Business Park shall be performed in conformity with the plans and drawings approved under Paragraph 3.5 above. The Design Review Committee shall have the right to inspect any such work to determine its conformity with the approved plans and drawings. In the event that it is determined in good faith by the Design Review Committee that certain work is non-conforming, the Design Review Committee may require the Owner to correct all non-conforming work specified in the notice before full operations commence at the facility. Commencement of full operations without correction of any such non- conforming items shall be deemed a breach of this Declaration. The Design Review Committee or officer, director, employee, agent, or servant of Declarant shall not be responsible for damages, loss, delay, cost or legal expense occasioned through an order given in good faith if it is ultimately determined that such work was in conformity with the approved plans and drawings. 3.8 Waiver: Any condition or provision of Paragraphs 3.3 through 3.7 above may be waived by the Design Review Committee in their exclusive discretion. Any waiver shall be in general conformity with the development concept and development standards for the Newberry Business Park. Any such waiver shall not be deemed a general waiver of any aspect of the development concept or the required procedures and approvals specified under Paragraphs 3.3 through 3.7. The granting of a waiver as to one Owner shall not 3 automatically entitle any other Owner to the waiver of the same or similar conditions or provisions. No waiver shall be valid unless it is in writing signed by an authorized representative of the Design Review Committee and delivered by certified mail to the party claiming the benefit of such waiver. 3.9 Control by the Design Review Committee: The Design Review Committee, as established by Order of the Deschutes County Board of Commissioners (Declarant), shall exclusively exercise all architectural controls prescribed under this Declaration, until such time as the Declarant terminates it's interest (by ownership or otherwise) in any and all property in Newberry Business Park. 3.10 Duration: The Covenants, Conditions and Restrictions of Newberry Business Park shall continue to remain in full force and effect at all times with respect to all property, and each part thereof, now or hereafter made subject to (subject however to the right to amend and repeal as provided herein) for a period of fifteen (15) years from the date this Amended Declaration is recorded. However, unless within one (1) year from the date of said termination there shall be recorded an instrument directing the termination of this Declaration signed by the Owners of not less than two-thirds (2/3) of the property then subject to this Declaration, based on the number of lots subject to these Restrictions (excluding dedicated streets) this Declaration, as in effect immediately prior to the expiration date, shall be continued automatically without further notice for an additional period of ten (10) years and thereafter for successive periods of ten (10) years unless within one year prior to the expiration of such period the Covenants, Conditions and Restrictions for Newberry Business Park are terminated as set forth above in this Section. 3.11 Amendment: This Declaration or any provision thereof, of any Covenant, Condition or Restriction contained herein, may be terminated, extended, modified or amended, as to the whole of said property or any part thereof with a written consent of the Owners of two-thirds (2/3) of the property subject to these Restrictions based on the number of lots owned as compared to0 the total number of Lots subject to these Restrictions (excluding dedicated streets). Provided, however, that as long as Declarant owns at least twenty five percent (25%) of the property subject to these Restrictions, no such termination, extension, modification or amendment shall be effective without written approval of the Declarant. 3.12 Recordation: Any amendment, deletion or repeal of this Declaration shall not become effective until recorded in the Official Records of Deschutes County. 3.13 Enforcement: This Declaration shall be specifically enforceable by the Declarant and its designated Design Review Committee, or by any Owner of any Lot in Newberry Business Park. However, enforcement of the Declaration shall not be mandatory or obligatory of the Declarant and its designated Design Review Committee, or by any Owner of any Lot in Newberry Business Park. Any breach of this Declaration shall subject the breaching party to any and all legal remedies, including damages. In the event that legal suit or legal action is instituted for the enforcement of this Declaration or for any remedy for the breach of this Declaration, the prevailing party shall recover that party's reasonable attorney fees incurred in such suit or action (or any appeal therefrom) as adjusted by the trial of the appellate court. 3.14 Nonqualifying Improvements and Violation of General Protective Covenants: 4 (A) Suit or Action. (B) Attorney Fees. SECTION 4. EFFECT OF DECLARATION The Covenants, Conditions and Restrictions of this Declaration shall run with the land included within the Newberry Business Park and shall bind, benefit and burden each Lot within Newberry Business Park. The terms of this Declaration shall inure to the benefit and shall bind Declarant, along with all their successors, assigns, heirs, administrators, executors, mortgagees, lessees, invitees or any other party claiming or deriving any right, title or interest or use in or to any real property in Newberry Business Park. The regulations set forth herein shall be binding upon all Owners, lessees, licensees, occupants and users of the property known as Newberry Business park and their successors in interest as set forth in this Declaration, including any person who holds such interest as security for payment of an obligation including any mortgages or other security holder in actual possession of any Lot by foreclosure or otherwise and any other person taking title from such security holder. DECLARANT: DATED this day of .-ATI LY' BOARD OF COUNTY COMMISSIONERS I OF DESCHUTES COUNTY, OREGON 7✓ti- TAMMY BA EY, Cri ATTEST: AN717r BONE, Vice V-ir Recording Secretary PHILIP G. HEN ERS N, Commissioner STATE OF OREGON ) ) ss. County of Deschutes ) Before me, a Notary Public, personally appeared TAMMY BANEY, ANTHONY DEBONE and PHILIP G. HENDERSON the above-named Board of County Commissioners of Deschutes County, Oregon and acknowledged the foregoing instrument on behalf of Deschutes County, Oregon. DATED this /3 day of ---4A` LA My Commission Expires: Jt'S' Notary Public for Oregon ` T. OFFICIAL STAMP �` •'$' SHARON RENEE ROSS f NOTARY PUBLIC-OREGON O COMMISSION NO.928178 MY COMMISSION EXPIRES MAY 04,2018 5 MORN /MY ILE910.01.1.011,., EM ZO IRE;; II IIlj�!VIII 0 m F-(p B+ur ON.S 01RU100201:12:10 21 WRIER CONN TO SW.6REaeesEaBE6R6 Th.��•n 140E..�..SL son,eeve'er.51.15 51. 5SEIPP E.DT.•CP AIJ SUBDIVISION PLAT NO. MS.COWER TOE sTU C.. E WTNCaeERT0 SECTwcww FILE NUMBER:.A.91.vF.9i.N4.6..van x SO:Mb3lN'EAST.1/5563• 5011_553lE'EMT.MIX �•B,,N� u� -. REED*DAD a.RD DN,1w _ o-• -.,- __.--_--NORTH 815316":ESi 118900-,NORT,18153'16'LLEST ...cow: 4 aN1n6JYiD SR,n [NIIIAL POINT \. 4E COMMEGT.TT EOMMOM EYEn BC4PONOBt CORER 30;0'• and"4 N md• __.too • • -.- - me oEScutEs wavy Blip now SURE BIN alIIJO09RrET and md' and and aDd NM jI �--�_•`� c�� m 2 OT 13. LOT 2 LOT 3 LOT 4 LOT 5 LOT 34 LOT 35 Be Be' sin e �AGO GONERµ3M51 C��q°'a EEO m a OR. LOT 36 LOT 54 LOT 55 LOT 56 c1 LOT 51 PLAra®RaD-cvd551 FINAL SUBDIVISION PLAT LPD W 253395 25155 26$593$ 24616 Y 244/385 24139 SF 240205 27BZOS' 5193 555 653 Ne vxNra=Iw,AREA 4$ XI a .. R a *MERRY BUSINESS PARK PER La MlOEH4 i 1 a !?ii $ WI PORTION CF TRACT'E'LARNE NDUSTRIAL SITE REM. 4ALMS MKS . h JANUARRYY n.1oe2 t�QIARiER SECTION 14 gRLo •.I T.12 5,R I0 E,WM. NARRATIVE: ° a nom nom mm' nom m mar mar m war' 6006' • um' L LAPS.51ROL ter&RAY FOR: SAGE NC BY DESCRUTES COINTY LI DE WE a BE.4.410.11. o A ASSEMBLY UTAY • LAPS Ja P.h.. Fa.VUE105 CONS.a eE SE COO. p NORTi-89'09'00'2851,125940' :OSE.LRCOI9��M CLOS MY.aErr.N nOa OREGON Cf 58194 N OCT ITER D..COW. %MII..116eE.SRvff E. 1181 nom woo ' mar now note SURVEYORS CERTIFICATE: --- LP0N6LS.Wr4PEsWHYe4EBWnE • mar mm mar mar note 411-7-°,.'9 1100 Ea SEC.N. 1.0556 DODGE 1154401.6PR1E510TLLAO SIRETCR_FIE STATE RORLR! H ITE Eh..SW E.drill,OMB LOT 1 LOT LOT8 I LOT9 I .*Ter CERT.MAT 1 RASE CORRECTLY 51.50®00 H4pE0064 MSS WD DBGSPOON,CV 11633.41 CY 0,61 $ a]L'BIR,ITE LMW 6651034 di llK FLAT TO ITE MOW s1a0Y0aCHE3 CymuN,,nE H.41 CE 5RhT1�RND 6'86335 w 0,"69 RR 18,1695 -15,1693 e. LOTS .LOT 31 . LOT 38 I LOT 39 LOT 58 LOT 59 LOT 604 LOT 61 $ y5 FIBTESSJ6Y LM04MEFERS ERACTD.NITE STATE CP OTECOL 5AD LED BE. 1R?4RD Or OBOIRES DEWY PBX NCxi ET 'V 601695 :60693 151693 x15,253 SF .1100E 9'81635 +•'51655Ft, 156025„ POE P6RTEILARY DESCRBED 6.5 FOLIC* LITE PAYE 0505 bME1[E.TO EOM B r ? 41O DF ITE SifNEEliYN6P4Ra5 'r1' • IN L BEGIN.AT ITE WON OJWIER•LRE¢55.111.N.ICOMP IT 50.1614.44,E 0i.,, i m • • I sl WIO 3001 SY. NOCE5.I 31 E6r 6 DS.Sa9m EEL _._ '_ Com' w➢' �T�4DOOM LEE 3 MINCE 4E'n14.VL'0105 44016 09110 KR.6.6.511.1.'A]P * I OHW NS N nb SIME6A,A 561.[9 mm mar' mm WOO Com A nom' EMT.1{11....nro£i->nE 1.0.58t•NBL BT Pet b'FSW inI£.[BO. f " - - _ __ EO mm 0- Com • mm __ IY _ - --- ,wl 6J TE.BitB/5 LED N1165MET x• LEGEND: E3E A 4x6 OPT E.P.M BT MO k o LOT II n LOT 12 LOT O LOT 4 1 LOT 5 LOT 40 LOT 41 LOT 42 LOT 62 LOT 63 LOT 64 :LOT 65 0 MIT:" n7ruENT Kv0 a i SIE AFO"AS NOTED SEt SB'x30'TROD BBB fBEro 56313 ..;‘,6,x1633 511636 ;81693 81693 15191693 9 81693 A 11633 5 x,1695 $x1695 b 19'633 w 81133 z o 514001WNAS084' e CALCLL4IED PoS!flCl BBB 4EWEB1F6 WERg4nsa (i � � STkfi'E7'NGE AC' CM Bram DI ITE 9BECi Wawlr. N 5 ."� '4 w 58758'430 TRW „1 5'._ffresi i01RE CORER 61(8169$PLASM LAP 5mN*01 MT�T ISE tfe CI 3D • mm' mm nom0000 MM.55.00.r "4 'R mm BOX WAY mm nom • mm • mm • nom • 1553' CT. � >r :g at �D 45W.WR6505ial � Ir APPROVALS:- TE 1.11.16.5E®1 • NORTH 69'09'00'IlESi,R60B5' ( 44yyy! IRS Cur 4x5 BM 8x4589110 8r. ACCEPTED.DE 6610 9a • , nom now• • mm now mar nom ' mm • mar mar mm •' VW i0 €E u 031649/0011030 S ' i SYN4NE a 6040 GF 410000 1043551011EIIE5 44 BY TIE -2- CONEYa ANT DEDKATIC*HODS IEIEN TO TIE RELIC CUM DATA--- s 14T,316, I'Loin •, QR414• Lc R/DLLS i Diel"---i-' b LOT 18 LOTH 5 LOT 20 : LOT 43 5 LOT 44 = LOT 45 5 LOT 66 5 LOT 61 5 LOT 68 W LOT 69I ce 3 cobT1 smEYaRa464533E833555 ,,4Wt4a 81,1.9318,1695E1'695 81693 0.1695 8,1695 ',*8;495 0,1695 81695 161695 a 1$145 j!O 44TH'• a' MIF' MAST0 66361.E a' MM 9565,. 1 -u 4438040 a' 1150 MN]!' nom nom I nom' nom wm� nom mar w • F9-4 Sa DM555 E � ///l/, ..l _I�JY.158'16 50735,.E B• MOs' mow Q w V--. - __. ---}-_ o-.-�__, mm mmnom o BeyC 467867E a Mtl x1'16 usji," I--. 1'113 aP DEYWIES corm FI.: OECTCR.._.•4,-� L-2JCS CI N 615ff II a MN' M0M' m I 1 6 544 d'• 3 Moa 951553 '^ • 3 N 61JST E ' MM MXer m LOT 21 ,ti LOT 22 LOT 23 LOT 24 LOT 25 LOT 46 LOT 41 LOT 48 LOT 10 LOT 11 LOT 12 • LOT 13 �'' u ce C 11.eaNrr DIRECTOR._�V i•LYmen_ Ca CI 3 Ne61E a Mtl a MO s,n 9 ® 816315 5 1895 *1,1695 l 11693 38.1695 . 1,1655 151,16330 1.1695 81698 a,8.1695E .•81058 •,1.9855 f1BLL5 /�'/ CO B6YH1103.�N a' nn' 5.55... ` F. i' 1 I'S 8 c �. r: • '^.I y 16x1 //8561485 CaNiY 43834* L. /-ss.mn CB 54611501 a' MW Mb. III R 05 2 3 p[� a vD'E B' no taw C z Im DEFACES cam lAx CCLECt �.Y 7Q Ft+.2mt T-- -.I � TN' . mm' mm Cy mar �m nom b mm I mm c mar nom COY CP• r7 `A SURVEYOR y DILLON WAY o o O DEWS COILS wrERIA51ER /-23.1•x3 NGRiH 69'479'00'REST,46230' �( WYE MEAL FEE DNIRCr / j A 0/�y/y $ , 3- m nom woe tam•woe•e5m•14nom 65 ,'4 ar nom' rote u' bo !�� ^•a03 �� LOT 21 p 1 65ar war um s6m pJa m $ - orEoOei 9rar 5 LOT 281LOT 29 LOT 30 LOT 31 1 LOT 321 LOT 331 LOT 49 LOT 50 L.0151 ILOi 52 LOT 531< 1 xNw 4I 1ERWY Br 1385E BRE moans:aw-638x15 a ITE SOW LOT 1!ILOi 15 LOT 16 LOT 11 Loi 18' a rNs R.br.COs cw.�sao LbE6 m eE 51*ErSD.YD rrED x11 PallasaroFla-c :"LOT 26�.. ,,,,,,,,,LOT 0/a 5 Spm 5 9006 5-9160 3 90mt 9$06 519mO S 9000 5 9[00 5 9006 5 90895 LOT l9 ,N RUSE B DCJbC3E 90065.90105 90605 96105 9bm5 RLN*a WY 49 SHOW al Iib FLIT.N1/OCFS4483 CEDKAIE 7013E R81K 560 REa05 _- 91495� 99tt „�961.5 � aWr,405BM1 IFPRO+4 OJO 549 5891.51/3 for. $ ''$ .. �$ $� 06819$ $ $ $ $ $ $w$ $I $ $ $ '! e 3z 6� 30_ 1114 '8 8 8 8 8 8 3 1 3 8 8 8- 8 8 8 5i 9 8 R 8 8 g$ 31' - ��.J� -z p. Be.6011_ 11.�- m w u, 6014.,A411„.„) m 8 6 aT \I ---------------2---4,..,-, _ 0= O�6Op0O'=>�60m;.5 e0m 1 C (o4 y6ar�6600 653 _ m '' ' NIP T6 InOIXPPE44ORM NMnw--7 �'� of s MNd E 663E FRT0,64.6t 08 110 FATE RSl01 U.01F0 oJ1'SPIN P,* _ FO3D t-Yl', LA B!N CORER -� EJ L61Rp Mr ICY Q El.IMT Ci DESONEs1 .- 1 51.44 ECM 6W6W ORM --.-. _._NORTf.89'09'00'REST.1292.90'(CALL)- GME*AC/•E 1.4 CCM o�,,- -5 RDE 4RCR3130T ENGINEERS SORVE1018,4 P1.NNERS 'CCM P4RL85 .---._I 485.0153'0.1292)1)05.01941) Fa,or PFE axemum. Len...KOWA 3rSN w ....I .s f84eo :X�4eT."w.a.sr o-r-- 4C696 PAWS 6.030036ms 61.6]6'IntSM.T OI YI4 CER MAD CE PPS CORER `aj" M .. 4[CE55 PAWS D'N'A.'16003 LOWED 091'S3Ma0. `• tt3.y 5s•1Ro 16.61.- -o, mra5+51nR>r�ES y E-,(Hr.sevir 4