2019-260-Resolution No. 2019-032 Recorded 6/28/2019Recorded in Deschutes County CJ2019-260
Nancy Blankenship, County Clerk
Commissioners' Journal 06/28/2019 9:44:21 AM
1111111111111111111111111 I 1111
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON
A RESOLUTION APPROVING THE FIRST
AMENDMENT TO THE JUNIPER RIDGE
URBAN RENEWAL PLAN
RESOLUTION NO. 2019-032
WHEREAS, the Bend Urban Renewal Agency ("BURA"), as the duly authorized and acting urban
renewal agency of the City of Bend, Oregon, is authorized to undertake certain redevelopment activities in
designated areas within the City of Bend pursuant to ORS Chapter 457; and
WHEREAS, the Bend City Council adopted the Juniper Ridge Urban Renewal Plan (Plan) on August
29, 2005; and
WHEREAS, Section XI of the Plan provides for council -approved amendments through approval by
BURA of a resolution considering the amendment and approval of the City Council by resolution; and
WHEREAS, City of Bend staff has reviewed and proposes changes to the boundary, project and
finances of the Plan (the proposed plan is attached as Exhibit A); and
WHEREAS, the boundary expansion includes land outside the city limits of Bend, on the rights of way
for Cooley Road and Hunnell Road, as shown on the attached map, Exhibit B; and
WHEREAS, when any portion of the area of a proposed urban renewal plan extends beyond the
boundaries of the municipality proposing the urban renewal area into any other municipality, ORS 457.105
provides that the governing body of the other municipality may approve the plan by resolution; now therefore,
BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES
COUNTY AS FOLLOWS:
SECTION 1. Deschutes County approves the Juniper Ridge Urban Renewal Plan First Amendment and
its inclusion of land within Deschutes County and outside the city limits of Bend.
1
RESOLUTION 2019-032
SECTION 2. Effective Date. This Resolution shall be effective upon adoption.
Dated this of 2019
RESOLUTION 2019-032
BOARD OF COUNTY COMMISSIONERS
OF DESCHUTES COUNTY, OREGON
for
PHILIP G. ENDERSON, Chair
PA'ITI ADAIR, Vice Chair
ANTHONY DEBONE, Commissioner
2
EXHIBIT A
This is a Council -Approved Amendment to the Juniper Ridge Urban Renewal Plan
(Amendment). Council -Approved Amendments consist solely of the following amendments:
• Material changes to the goals and objectives of the Plan.
• Addition or expansion of a project, which adds a cost in 2005 dollars of more than
$500,000 and which is materially different from projects previously authorized in
the Plan.
Council -Approved Amendments require approval by the Agency by resolution and by the
City Council, which may approve the amendment by resolution. This amendment adds projects
with a cost in excess of $500,000 in 2005 dollars and are materially different from projects
previously authorized in the Plan.
When any portion of the area of a proposed urban renewal plan extends beyond the boundaries of
the municipality proposing the urban renewal area into any other municipality, ORS 457.105
provides that the governing body of the other municipality may approve the plan by resolution.
All deletions proposed in this Amendment are shown by strikeout. Additions are shown in
italics. The Urban Renewal Projects section and maps showing those projects has been updated
in this Amendment. Additional property has been added to the urban renewal area. Some of the
changes are merely re -numbering of the projects to incorporate project numbering provided in
the transportation sub -section of the Projects section. The Report on the Amendment, a separate
document, has also been updated to reflect an updated financial analysis.
III. Map and Legal Description of the Urban Renewal Area
Figure 1, the existing map of the Juniper Ridge Urban Renewal Area (Area) is deleted and
replaced by the maps below. The first map shown below, Map 1 identifies the property to be
added to the Area in brown, right of way on Cooley Road and Hunnell Road. The second map
shows the urban renewal area with the added property. The second map, now labelled as Map 2
will be labelled Figure 1 in the amended Juniper Ridge Urban Renewal Plan and will replace
the existing Figure 1. The legal description is also updated to reflect these additions.
1
Map 1 — Area to be Added
—6801FY RD
� v
// '.-- d,. 'V
\� I rY�/ NE... Pc.�l.2
/T / " ^: tl het,
{t,„ "
- Highway
- Arterial
— Collector
Canals
Urban Renewal Districts
Proposed Urban Renewal Area Expansion
Local Street
Source: City of Bend
® Urban Growth Boudnary
Taxlots
0.125 0.25
Miles
0.5
0
2
Map 2 — Juniper Ridge Urban Renewal Boundary (will be Figure 1 of
Amended Plan)
_ -1 Anr cdc Bo
I
((
J
\ t I
/‘'''''"1"'''.1'
i1 ' _--/
,4
Otr
•
® Urban Growth Soudnary — Highway Proposed Urban Renewal Area Expansion
Canals - Arterial I Taxlots
- Collector
Local Street
0
0.25
0.5
Miles
1
Source: City of Bend
IV. Urban Renewal Projects
Urban renewal projects authorized by the Plan are described below and are shown in Figure 2.
A. Public Improvements
Public improvements identified in the Public Facilities Plan and authorized under the
Plan include the design and construction of new sewer and transportation infrastructure,
such as arterial, collector and local roads and new connections with Highway 97 as well
as street extensions, widening and realignment projects that will increase access to the
Area and facilitate the development of vacant sites. As shown in the Report, urban
renewal funds will be combined with existing and other future sources of funding to
finance project costs.
Sub -Area A Projects
Projects in Sub -Area A that may be undertaken under the Plan are:
3
4,-Transportatien
a) Highway 97 Interchange and Intersection Improvements
The Highway 97 Interchange and Intersection Improvements project will increase access
to the Area through the provision of new interchanges an associated intersection
improvements on both sides of Highway 97. The interchanges, which may be developed
at Cooley Road/Highway 97 or other locations along US 97, will provide separate lanes
and grades for turning movements to and from Highway 97 to accommodate the trips
generated by anticipated development in Juniper Ridge and the broader Area.
b) Burlington Northern Santa Fe (BNSF) Railroad Grade Separation (Cooley Road)
This project consists of the design and construction of a new railroad bridge where the
BSNF railroad intersects with Cooley Road.
c) Cooley Road Widening, Realignment and Improvements
widening Cooley Road to 1 lanes and realigning the existing roadway to connect it to the
planned southwest entrance to Juniper Ridge. Additional project components include turn
d) Roundaboutslt on Cooley
The design and construction of new roundabouts at two intersection of Cooley Road is
intended to calm traffic and create a safe environment for multi modal commuters. The
roundabout will feature landscaping and public art.
c) Cooley Road Extension
The Cooley Road Extension project extends the existing Cooley Road east from
Roundabout ttl to Deschutes Market Road. Additional project components include the
pedestrian crossings as well as utilities and lighting.
.0 -Mk -Street Extension
The 18th -Street Extension project extends 1 S Street, an existing north/south arterial, from
sidewalks and pedestrian crossings as well as underground utilities and lighting.
g) New Collector Roads
The design and construction of an anticipated eight new collector roads in Sub Area A
will promote multimodal circulation and safety by collecting and distributing traffic from
local roads to arterials.
h) New Local Roads
The provision of new local roads will facilitate direct access to properties in Juniper
allowed under the Plan.
4
1. Transportation
The transportation projects are summarized in the table below. Detailed descriptions of
the projects are provided after the table and correspond to the Map Code in the next to
last column of the table.
Project From To Description Map Former
Code Project
Code
US97/Cooley Improvements to the Al A, F
improvements US97/Cooley Road
intersection consistent with
the US97 Bend North
Corridor Project
Cooley Road Hunters Boyd Roundabout, medians, turn A2 B
Circle Acres lanes, pedestrian crossings,
Road sidewalks, bike lanes,
landscaping, lighting
Cooley Road Existing Eastern Extend Cooley Road from A3 D
extension eastern urban existing terminus to eastern
terminus renewal urban renewal area
area boundary
boundary +1 RAB as proposed in
Special Area Plan
18th Street NE North Medians, turn lanes, A4 C, D, E
extension Talus Urban pedestrian crossings,
Place Renewal sidewalks, bike lanes,
Boundary landscaping, lighting +2
RAB
New collector Various Within Construction of new A5 G
roads Juniper collector roads within
Ridge Sub Juniper Ridge
Area A
5
Al. US97 and Cooley Road Intersection Improvements
The intersection improvements at Highway 97 and Cooley Road will
increase access to the Area through the provision of intersection improvements on both
sides of Highway 97. The improvements, which may be developed at Cooley
Road/Highway 97 or other locations along US 97, will provide separate lanes and
grades for turning movements to and from Highway 97 to accommodate the trips
generated by anticipated development in Juniper Ridge and the broader Area.
A2. Cooley Road Improvements
Improvements to Cooley Road may include construction of intersection improvements
which may be a roundabout at Boyd Acres Road. Additional project components
between Hunters Circle and Boyd Acres road could include turn lanes, medians,
sidewalks, bike lanes, lighting, landscaping and pedestrian crossings.
A3. Cooley Road Extension
The Cooley Road Extension project extends the existing Cooley Road east from its
current terminus to the Juniper Ridge urban renewal boundary. Additional project
components may include the design and construction of intersection improvements,
medians, turn lanes, bike lanes, sidewalks and pedestrian crossings, utilities and
lighting.
A4. 18`h Street Extension
The 18`h Street Extension project extends 18`h Street, an existing north/south arterial,
from NE Ta l u s P1 a c e to the Central Oregon Irrigation District (COID) canal.
Additional project components may include the design and construction of a median,
turn lanes, bike lanes, sidewalks and pedestrian crossings, utilities and lighting.
A5. New Collector Roads
The design and construction of new collector roads in Sub -Area A will promote
multimodal circulation and safety by collecting and distributing traffic from local roads
to arterials.
A6. New Local Roads
The provision of new local roads will facilitate direct access to properties in Juniper
Ridge. While local roads will be funded by developers, participation in such costs is
allowed under the Plan.
2. Sewer
a)A 7. South Sewer Trunk Line Extensions
Concurrent with the development of planned arterial and collector roads, this project will
provide new sewer main extensions for the purpose of providing and connecting service
6
to the future North Interceptor.
b)A8. Sewer Trunk Line Extensions
6outh along the area's eastern boundary.
E)A8. Sewer Pump Stations
Concurrent with the phased development of Sub -Area A, this project consists of the
construction of new sewer pump stations as necessary for private development.
A9. North Interceptor
Construction of a portion of the new large diameter trunk line that extends from the
water reclamation facility west to Highway 97. This facility provides additional sewer
conveyance capacity for the entire north area and will allow for the decommission of the
Juniper Ridge Lift Station. This is shown on Map 3/Figure 2.
7
Map 3 — Map 1 of North Sewer Interceptor Phase Plan (will be Figure 2 in the Amended Plan)
CC
AMH a.u.ne 113MOd
ti
as A3HDia
(13) ?IOid3ON31NI 1SV3
aa xaa6fi
d
ALFALFA MKT RD
w
ON IAN S3111H
1p HLSL
cn
1S Hia 3N
di
oi K
6 Z
w w
a.
ILI
----
s ..-.. '4'9-4'19 3N < Z d
oa w
w Z
IS HjV 3N u�j
1S 11V
w Z
-I NOlsima �" .._
My74,
w
H
x
O.
Source: City of Bend
M.r WpSNINCTO^, O�
E 5
LO
0
N
0
0
ENGINEERING
8
Map 4 — Map 2 of North Sewer Interceptor Capital Improvement Program (will be Figure 3 in
the Amended Plan)
Existing Inl,00I,uctule Lift Slnlion
Easton lin 0101m -I, Capacity and Conation Vow I toy
- gn- Exs`ng honk I; Capacity sod Cood5o00001010 10
cl�le n i Existing Capauty aril Condrt000 Year 11:020
Improvements * 00 0 0 0 011 0 01r t to 5
a• n P3xux pe""''''''" tg
0l0010 ts
* 000001, Year 5 to 10
of aGE Eapxnsicn 'x Co00000 Year i1 10 20
to Convoy Im{.rcte
cams Condition Nor m Dacc.nms,Mn
tq 0000 -1000,00
murraysmith
City of Bend
Collection System
Public Faclllitles Plan Update
Figure 13
Capital Improvement
Program Overview
Source: City of Bend
CSMP — improvements identified in the Collection System Master Plan for growth within the existing UGB
Expansion — improvements identified in the UGB expansion study for growth in the expanded UGB (outside of the
existing UGB)
Shared — improvements identified in the Collection System Master Plan for growth within the existing UGB and will
also serve growth in the expanded UGB. The North Interceptor is identified separately, but is also a shared
improvement.
9
3. Water
a}A11. Water Trunk Line Connections and Hydrants
As planned arterial and collector roads and sewer improvements are constructed, this
project will provide water and trunk line connections and fire and water flow hydrants.
Anticipated water infrastructure projects may include, but are not limited to, new water
main extensions along the Cooley Road and 18th Street extensions to Roundabouts #1 and
#2 and the COID Canal.
13-)Al2. Piping of COID Canal and Irrigation Systems
This project consists of the piping and/or lining of the COID canal, which may be carried
out as a regional water conservation measure. Irrigation water systems, including
reservoirs, conveyance and watering devices, may also be constructed throughout Juniper
Ridge.
4. Stormwater
a}A13. Stormwater Controls and Irrigation Ponds
This project provides for the construction of irrigation ponds and other storm water
controls to be located near the planned entrance to Juniper Ridge and other on-site
locations.
5. Parks and Open Space
4A14. Public Open Space Areas
Currently, there are no formal parks and open space within Juniper Ridge. This project
calls for the development of public open space at key areas identified in the Public
Facilities Plan. These areas include the southwest corner of Juniper Ridge, an area
adjacent to the North Point Neighborhood, and an area near the location of the waterfall
along the COID canal.
b}A1 5. Linear Trail/Greenway Network
Develop a linear trail/greenway network that interconnects public open space uses.
Specific project components may include pedestrian pathways, recreational trails and
greenway buggers along the area's western edge, which will protect lands along the
COID canal.
10
Sub -Area B Projects
Projects in Sub -Area B that may be undertaken under the Plan are:
1. Transportation
a) Hunnell Road Extension
to the Urban Reserve Boundary. The extension, which will be classified as a collector,
will serve as a frontage road for developing commercial properties in Sub Area B. A new
intersection and traffic roundabout will be constructed at Cooley Road and the terminus
of the existing roadway.
b) Cooley Road Upgrade
In conjunction with the proposed widening of Cooley Road in Sub Area A, this project
calls for the upgrade of the existing Cooley Read to a 1 lane minor arterial between
Highway 20 and the western boundary of Sub Area A.
c) Sub Area B Bicycle Lane Improvements
Complete planned bike lanes within Sub Area B. Planned bike lanes will be developed on
Cooley Road (Hwy 20 to Highway 97), Hunnell Road (Robal Lane to Cooley Road) and
Robal Lane (Hwy 20 to Highway 97).
d) Sub Ara B Sewer Extensions
Proposed sewer extensions within Sub Area B may include a new north south sewer line
along the proposed Hunnell Road Extension and an east west line along Loco Road.
c) Sub Arca B Water Extensions
along the proposed Hunnell Road Extension and a 12 inch water line along Cooley Road.
11
1. Transportation
The transportation projects are summarized in the table below. Detailed descriptions of
the projects are provided below the table.
Project From To Description Map Former
Code Project
Code
Hunnell Rd Cooley UGB Reconstruct and extend BI Q, S
extension Road boundary Hunnell Road from Cooley
Road to the urban growth
boundary
Cooley Road US20 Hunnell Reconstruct roadway, B2 R, S
improvements Road construct a roundabout at
Cooley Rd/Hunnell Rd,
construct sidewalks, bike
lanes, and medians
Cooley Roundabout or traffic signal B3 R, S
Road/US20
intersection
improvements
Robal Roundabout or traffic signal B4
Road/US20 upgrade
intersection
improvements
US20 Cooley Robal Widen US20 between Cooley B5
widening Road Road Road and Robal Road to 4
lanes, including the
construction of medians, bike
lanes, sidewalks,
landscaping, and lighting
12
B 1 . Hunnell Road Extension
The Hunnell Road Extension project will reconstruct and extend Hunnell Road north
from Cooley Road to the Urban Growth Boundary. The extension, which will be
classified as a collector, will serve as a frontage road for developing commercial
properties in Sub -Area B. A new intersection and roundabout may be constructed at
Cooley Road and the terminus of the existing roadway.
B2. Cooley Road Improvements
Reconstruct the existing segment of Cooley Road between Highway 20 and
Hunnell Road, including the potential construction of a roundabout at the intersection
of Cooley Road and Hunnell Road. Additional project components m ay include the
design and construction of a median, turn lanes, bike lanes, sidewalks and pedestrian
crossings, utilities and lighting. The project may also include the construction of
sidewalks along Cooley Road from Hunnell Road to US97.
B3. Cooley Road/US20 intersection improvements
Improve the Cooley Road/US20 intersection to include a roundabout or traffic signal.
Additional improvements could include the design and construction or reconstruction
of the approach roads, medians, bike lanes, sidewalks, pedestrian crossings,
landscaping, utilities and lighting.
B4. Robal Road/US20 intersection improvements
Improve the Robal Road/US20 intersection to include a roundabout or upgrade the
traffic signal. Additional improvements could include the design and construction or
reconstruction of the approach roads, medians, bike lanes, sidewalks, pedestrian
crossings, landscaping, utilities and lighting.
B5. US20 widening
Widen US20 between Cooley Road and Robal Road to 4 lanes, including the potential
construction of medians, bike lanes, sidewalks, landscaping, utilities and lighting.
B6. Sub -Area B Sewer Extensions
Proposed sewer extensions within Sub -Area B may include a new north -south sewer
line along the proposed Hunnell Road Extension and an east -west line along Loco
Road.
B7. Sub -Area B Water Extensions
Proposed water extensions within Sub -Area B may include a new north -south water
line along the proposed Hunnell Road Extension and a 12 -inch water line along Cooley
Road.
13
Map 4 — Map of Projects (will be Figure 4 in the Amended Plan)
Bend Juniper Ridge Urban Renewal Transportation Projects
B3
82
000LE
Al A2
Legend
Interchange/RR Over Crossing ® Al: Interchange/RR Over Crossing p.: 81: Hunnell Extension
New Roundabout rwsmss A2: Cooley Widening =maw 82: Cooley Road Improvements
® Intersection Improvement wwww. A3: Cooley Extension hmsswe B4: Robe! Road1US 20 Improvements
hwham A4'. 18th Street Extension v 85: US20 Widening
AS: New Collector Urban Renewal District
Urban Growth Boundary
Source: City of Bend
C. Administrative Activities
The Board may utilize revenues to retain the services of City personnel as well as other
independent professional people or organizations to provide administrative, technical,
and/or project management services deemed necessary to implement and consistent with
the Plan, such as:
a. General staffing, and office/overhead expenses;
b. The management and oversight of an appointed advisory board;
c. Preparation of market feasibility, transportation impact analyses, or other
technical/economic studies;
d. Preparation of design, architectural, engineering, environmental, landscape
architectural, planning, platting, or other documents/studies related to
development;
14
e. Providing special rehabilitation, restoration or renovation feasibility and cost
analysis studies;
f Providing property acquisition and/or disposition appraisals;
g. Evaluating the Plan and the success of its activities;
h. Providing legal, debt issuance, accounting or audit services;
i. Assisting in the preparation of the annual financial report required by this
Plan and ORS Chapter 457; and
Any other powers granted by ORS Chapter 457 in connection with the
implementation of this Plan.
J•
XII. Exhibit A — Legal Description of Renewal Area Boundary
The legal description is deleted in its entirely and replaced with the following legal description.
15
EXHIBIT B
Deschutes County Board of Commissioners
1300 NW Wall St, Bend, OR 97703
(541) 388-6570 - Fax (541) 385-3202 - https://www.deschutes.org/
AGENDA REQUEST & STAFF REPORT
For Board of Commissioners BOCC Wednesday Meeting of June 26, 2019
DATE: June 18, 2019
FROM: Tom Anderson, Administrative Services, 541-388-6565
TITLE OF AGENDA ITEM:
Consideration of Board Signature of Resolution No. 2019-032, Approving the First
Amendment to the Juniper Ridge Urban Renewal Plan
RECOMMENDATION & ACTION REQUESTED:
Approval and signature of Resolution No. 2019-032
BACKGROUND AND POLICY IMPLICATIONS:
Resolution 2019-032 will amend the Juniper Ridge Urban Renewal Plan by allowing the
expansion of the district boundaries to include the full rights of way of Cooley Rd and Hunnell
Rd within the Bend UGB. Board action is necessary as the area to be included in the Urban
Renewal District, while within the UGB, is outside of current Bend city limits. The City intends
to then undertake public improvements to Cooley and Hunnell Roads in order to increase
access to the area and facilitate development of vacant sites.
FISCAL IMPLICATIONS: None
ATTENDANCE: Matt Stuart, Bend Urban Renewal Project Manager