BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON
An Order Setting a Temporary Speed Limit of
35 Miles Per Hour on Dickey Rd and Nelson
Rd
ORDER NO. 2024-012
WHEREAS, the Deschutes County Road Department is causing for the construction of a new
roundabout at the intersection of Powell Butte Highway and Butler Market Road located in Deschutes
County; and
WHEREAS, the construction of the roundabout will require the installation of a temporary detour
around the intersection via Dickey Road and Nelson Road to allow for continued access to Powell Butte
Highway from Butler Market Road; and
WHEREAS, the Deschutes County Road Department, pursuant to the provisions of ORS
810.180(8), has determined that the implementation of the temporary detour will alter the character of
the roadway to the extent that a temporary designated speed lower than the statutory speed is
necessary to protect the safety of the traveling public; now, therefore
THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON,
HEREBY ORDERS as follows:
Section 1. That the designated speed for the following roadways be as follows:
Road Name:
Dickey Rd
Nelson Rd
Designated Speed:
35 miles per hour
35 miles per hour
From:
Milepost 0.00
Milepost 0.00
To:
Milepost 0.50
Milepost 1.01
Section 2. That the Deschutes County Road Department or its contractor shall install
appropriate signs giving notice of the designated speed per ORS 810.180(8)(d).
Section 3. That the signs installed pursuant to this order comply with the provisions of ORS
810.210.
Section 4 That this speed zone will be in effect upon signature of the Board of County
Commissioners and will terminate upon final completion of the roundabout project.
Section 5. That this Order shall be recorded in the office of the Deschutes County Clerk.
PAGE 1 OF 2- ORDER No. 2024-012
DATED this day of
ATTEST:
-t &Ltg�l tzeCO4—
Recording Secretary
PAGE 2 of 2- ORDER No. 2024-012
2024.
BOARD OF COUNTY COMMISSIONERS
OF DESCHUTES COUNTY, OREGON
PATTI ADAIR, CHAIR
A THONY DEBONE, VICE CHAIR
PHIL CHANG, CO MISSIONER
LEGEND
Temporary Speed Zone
- = County Routes
Road Centerlines
Construction Site
,��3i ES C-aG��
f ROAD
DEPARTMENT
TEMPORARY SPEED ZONE
` N DICKEY RD and NELSON RD
Canals
DATE: I SCALE: I DRAFTER: R. PINKSTON
4/02/24 1 N.T.S. I REVIEWED BY: C. SMITH
i--� ES COG
�� BOARD OF
COMMISSIONERS
MEETING DATE: April 10, 2024
SUBJECT: Approval of Order No. 2024-012, Setting a temporary speed limit of 35 MPH on
portions of Dickey Road and Nelson Road
RECOMMENDED MOTION:
Move approval of Order No. 2024-012.
BACKGROUND AND POLICY IMPLICATIONS:
The Deschutes County Road Department is delivering the Powell Butte Highway/Butler
Market Road intersection improvement project, which includes construction of a
roundabout at the intersection. Construction of the roundabout requires closure of Butler
Market Road with a detour on Dickey Road and Nelson Road that will be in effect for up to
five months. Due to resident concerns and an alteration in the character of Dickey Road (a
collector road) and Nelson Road (a local road) by diverting Butler Market Road traffic to the
detour route, Road Department staff have determined that a temporary speed limit of 35
mph is prudent.
Pursuant to ORS 810.180(8), a road authority may establish by ordinance or order a
temporary designated speed for a highway that is lower than the statutory speed. The
Road Department is requesting that a temporary designated speed of 35 mph be
implemented on Dickey Road and Nelson Road along the detour route. The current
statutory speed on Dickey Road and Nelson Road along the detour route is 55 mph.
Adoption of Order No. 2024-012 will implement a temporary designated speed of 35 mph
on Dickey Road and Nelson Road along the detour route. The temporary designated speed
will be in effect for the duration of the intersection improvement project, which is presently
anticipated to be substantially completed by September 1, 2024.
BUDGET IMPACTS:
None
ATTENDANCE:
Cody Smith, County Engineer/Assistant Road Department Director