Loading...
2024-277-Resolution No. 2024-045 Recorded 9/27/2024REVIEWED Recorded in Deschutes County C.�2a24®�%% Steve Dennison, County Clerk LEGAL COUNSEL Commissioners' ,lournal 09/27/2024 9:35:59 AM 1 FS - 2024-277 BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON A Resolution Amending the Deschutes County 2024-2025 Fee Schedule RESOLUTION NO. 2024-045 WHEREAS, various departments of Deschutes County charge fees for services and permits; and WHEREAS, it is necessary to amend the Deschutes County Fee Schedule and to adopt the revised Community Development, Health Services and Information Technology Fees to include new and revised fees, now, therefore, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON, as follows: Section 1. That the fees set forth in Exhibit "A", attached hereto and, by this reference, incorporated herein, are hereby amended in the 2024-2025 fees and charges of Deschutes County, Oregon. Section 2. The fees and charges for services and permits adopted in Exhibit "A" of this Resolution are effective by dates as shown on Exhibit "A". Section 3. All fees and charges for services and permits in effect prior to the effective date on Exhibit "A" are hereby continued or superseded as provided herein. Dated this of , 2024 AT EST: Recording Secretary BOARD OF COUNTY COMMISSIONERS OF ESCHUTES COUNTY, OREGON A-���� PATTI ADAIR, Vice Chair ANTHONY DeBONE, Chair PHIL CHANG, C mmissioner PAGE 1 of I — RESOLUTION NO.2024-045 \>1u1 E S CO C, G � BOARD OF COMMISSIONERS MEETING DATE: September 25, 2024 SUBIECT: Public Hearing and Resolution amending the Deschutes County 2024-2025 Fee Schedule to add new and revised fees in Health Services, Information Technology and Community Development Departments RECOMMENDED MOTION: Following the public hearing, move approval of Resolution No. 2024-045 to amend the Deschutes County 2024-2025 Fee Schedule and adopt new and revised fees within Health Services, Information Technology and Community Development Departments. BACKGROUND AND POLICY IMPLICATIONS: At the September 16, 2024 Board of Commissioners work session, staff presented proposed fee schedule amendments. The Board expressed support for proceeding with a public hearing on proposed new or revised fees from three departments as listed below. Health Services proposes an 8% increase to Environmental Health fees, effective October 1, 2024, to cover approximately $116,000 in increased costs to the department. Information Technology (IT) proposes a new fee to cover staff time and resources used when assisting other cities and counties in developing technology solutions such as Dial, Community Justice dashboards, ROCS, dog licensing applications, and more. The department is frequently approached for assistance with the design, development, integration, deployment and support of databases and systems of other jurisdictions. With this fee, IT would be able to cover the associated costs of providing such assistance. Community Development Department proposes the fee increases listed below, which would generate an estimated $106,000 to cover increased costs to the department. These changes would be effective November 1, 2024. • Code Enforcement - .01 % • Electrical Permits - 2% • Onsite Wastewater Applications - 2% • Land Use Applications - 2% • Public Information Counter - .01 % • Advanced Planning - .01 % The proposed amended fee schedule is attached to this staff report. BUDGET IMPACTS: Anticipated additional revenue from new and revised fees listed. ATTENDANCE: Peter Gutowsky, Community Development Director Cheryl Smallman, Business Officer, Health Services Tania Mahood, Information Technology Director Laura Skundrick, Management Analyst ® ENACTMENT Proposed Proposed ITEM NO. DESCRIPTION FY 2025 FEE UNIT AUTHORITY Revised Fee Effective Date Community Development CDD 1 Refund request processing $ 40.00 No refunds if refund amount is less than $40.00. Other amounts may be deducted from refund for work already performed. CDD 2 Address Issuance $ 43.00 per dwelling New use with separate address (charged at time of building permit or site plan review, except CDD 3 revised site plan review) $ 43.00 v _ _ CDD 4 Site plan review $ 127.00 $ 130.00 11/1/2024 CDD 5 Advanced planning fee (supports long-range planning and regular code updates and review) $ 0.0043 of bldg valuation _ 0.0044 11/1/2024 Public Information fee (supports public information and assistance in Bend, Redmond and LaPine CDD 6 and allows for consolidated permit processing at one location) $ 0.0044 of bldg valuation 0.0045 11/1/2024 CDD 7 Code enforcement fee (supports code enforcement program) $ 0.0034 of bldg valuation 0.0035 11/1/2024 Circuit court or hearings officer CDD 8 Code enforcement court fine or fee ACS w determination CDD 9 Research/file review supervision $ 406.00 per hour CDD 10 Road Access Permit $ 93.00 CDD 11 Second Road Access Permit $ 46.00 µ CDD 12 Three or more Road Access Permits $ 23.00 each CDD 13 Consultation by CDD professional staff ACS CDD 14 Consultation by CDD building safety staff ACS CDD 15 Consultation by CDD electrical staff ACS CDD 16 Consultation by CDD code enforcement staff ACS CDD 17 Consultation by CDD onsite wastewater staff ACS CDD 18 Consultation by CDD current planning staff ACS CDD 19 Consultation by CDD long range planning staff ACS Policy Regarding Refunds: A 75% refund may be made after an application has been received. The 25% withheld covers work associated with the application, including zoning, septic and site plan review, file creation and staff assignment. An additional percentage will be withheld as each additional phase of the permitting process is completed (i.e. plan review, inspections, staff report preparation). Refunds must be requested within 180 days of application. In every case, the $40 refund request processing fee will be charged to cover the cost of refund check processing and issuance. CDD 20 Bend Park and Recreations SDC for Accessory Dwelling Unit (ADU) $ 4,867.00 CDD 21 Bend Park and Recreations SDC for Multi Family Average $ 7,661.00 CDD 22 Bend Park and Recreations SDC for Hotel/Motel, each unit $ 7,776.00 per room CDD 23 Bend Park and Recreations SDC for Single Family Home (< 600 sq ft) $ 8,066.00 CDD 24 Bend Park and Recreations SDC for Single Family Home (600-1,200 sq ft) $ 9,058.00 CDD 25 Bend Park and Recreations SDC for Single Family Home ( 1,201-1,600 sq ft) $ 10,004.00 _ CDD 26 Bend Park and Recreations SDC for Single Family Home (1,601 - 2,200 sq ft) $ 10,680.00� CDD 27 Bend Park and Recreations SDC for Single Family Home (2,201 - 3,000 sq ft) $ 11,311.00 CDD 28 Bend Park and Recreations SDC for Single Family Home (> 3,001 sq ft) $ 12,348.00 CDD 29 Bend Park and Recreation SDC for Manufactured/Mobile Home Placement Permit (in a Park) $ 10,184.00 CDD 30 Transportation SDCs - base rate $ 5,670.00 Per peak hour trip Per single family CDD 31 Transportation SDCs - Single Family Home _ $ 4,593,00 home CDD 32 System development charge payment plan administrative fee $ 300.00 _ CDD - Building Safety Division plus 10% of the total project building permit fee not to exceed $1,500.00 for each phase or portion of the CDBS 1 Phased Project Plan Review Fee - in addition to project plan review fees $ 604.75 project ca cu ate using the value of the deferred portion with a $250 CDBS 2 Deferred Submittal Plan Review Fee - in addition to project plan review fees 65% minimum 3 Expedited Review (optional program): in addition to bldg CDBS 4 Structures require engineer/architect stamped plans $ 461.50 permit fee in addition to bldg CDBS 5 All others $ 196.30 permit fee CDBS 6 Special Inspection - applies to all disciplines $ 125.00 or ACS CDBS 7 Agricultural building exemption fee $ 67.75 Building inspections outside of normal business hours (min charge - two hours) - applies to all CDBS 8 disciplines $ 187.50 per hour CDBS 9 Re -inspection fee - applies to all disciplines $ 125.00 each CDBS 10 Additional inspection above allowable - applies to all disciplines $ 125.00 CDBS 11 Reinstatement Fee - applies to all disciplines $ 150.50 CDBS 12 Structural Permit Extension Fee $ 100.00 W CDBS 13 Investigation Fee - applies to all disciplines _ $ 125,00 CDBS 14 Inspections for which no fee is specifically indicated (min charge - 1/2 hour) - applies to all disciplines $ 125.00 per hour Additional plan review required by changes, addition or revisions to approved plans (min charge - Y2 CDBS 15 hour) $ 125.00 per hour CDBS 16 Demolition permits $ 194.00w _ CDBS 17 Consultation fee (min 1 hour) $ 125.00 per hour— CDBS 18 Temporary certificate of occupancy - valid 180 days (commercial) $ 572.75 CDBS 19 Temporary certificate of occupancy -valid 180 days (residential) $ 161.25 ORS 455.020 & OAR 918-050- CDBS 20 Solar Building Permit - Prescriptive (includes plan review) $ 109.75 0180 Fee as perms Solar Building Permit- Non -Prescriptive Path System -valuation to include the solar panels, racking, Structural Permit mounting elements, rails and the cost of labor to install. Solar electrical equipment including Fee table by CDBS 21 collector panels and inverters shall be excluded from the Structural Permit valuation. valuation New construction and additions shall be calculated using the ICC Building Valuation Data Table current as of April 1 st of each year. CDD may charge the average or actual additional cost for an investigatition fee ensuring a building, structure or system is in conformance with state building code for work commenced prior to permit issuance. Residential Fire Suppression Residential Sprinklers 0-2000 sq ft, includes plan review, applies to standalone and OAR 918-050- CDBS 22 multipurpose/continuous loop (plumbing) $ 200.00 0140 Residential Sprinklers 2001-3600 sq ft, includes plan review, applies to standalone and OAR 918-050- CDBS 23 multipurpose/continuous loop (plumbing) $ 250.00 0140 Residential Sprinklers 3601-7200 sq ft, includes plan review, applies to standalone and OAR 918-050- CDBS 24 multipurpose/continuous loop (plumbing) $ 325.00 0140 Residential Sprinklers 7201 sq ft and greater, includes plan review, applies to standalone and _ OAR 918-050- CDBS 25 multipurpose/continuous loop (plumbing) $ 410.00 0140mmmm _ Commercial Fire Suppression = _ ___ See Structural Permit Fee table OAR 918-050- CDBS 26 Commercial Fire Suppression by valuation 0100 Re -inspection fee: A $125 re -inspection fee shall be charged for inspections of violations found by the division on or after the second inspection and for inspections requested but which cannot be CDBS 27 performed due to inability to get access to work to be inspected. $ 125.00 PLAN REVIEW: CDBS 28 Plan check fee 65% bldg permit fee CDBS 29 Plan check fee for electrical and mechanical systems of commercial/residential buildings 25% bldg permit fee CDBS 30 Plan check fee for plumbing of commercial/residential bldgs 30% bldg permit fee CDBS 31 Plan check fee for fire/life safety/over 4,000 sq ft 40% bldg permit fee CDBS 32 Plan check for manufactured dwelling/rec park plan review 65% permit fee The current State of Oregon surcharge is added to all fees, including reinstatement fees and excluding extension fees, in the Building Safety Division. Additional State fees may apply. Total valuation: CDBS 33 $1.00 to $500.00 $ 10.25 firs + for each additional $100 or fraction thereof, to and including CDBS 34 $501.00 to $2,000.00 $ 10.25 $2,000 first $2,000 +$6.50 for each additional $1,000 or fraction thereof, to and CDBS 35 1$2,001.00 to $25,000.00 $ 36.50 including $25,000 first $25,000 +$5.00 for each additional $1,000 or fraction thereof, to and CDBS 36 $25,001.00 to $50,000.00 $ 186.00 including $50,000 i rs +$4.50 for each additional $1,000 or fraction thereof, to and including CDBS 37 $50,001.00 to $100,000.00 $ 311.00 $100,000 first +$5.50 for each additional $1,000 or fraction CDBS 38 $100,001.00 and up $ 536.00 thereof CDBS 39 MinimumFee-Structural $ 150.00 Plumbing: includes one kitchen, first 100 feet each of site utilities, hose bibbs, icemakers, underfloor low -point drains, and rain drain packages that include the piping, gutters, downspouts, and perimeter system. Half bath counted as whole. CDBSPL 1 One and Two Family / 1 bath $ 371.25 CDBSPL 2 One and Two Family / 2 bath $ 477.25 CDBSPL 3 One and Two Family / 3 bath $ 530.50 CDBSPL 4 Baths greater than-4 3 $ 53.00 CDBSPL 5 One and two family/solar (when connected with potable water) $ 143.75 Residential and U1 plumbing: Fixtures: CDBSPL 6 Sink/basin/lavatory $ 29.50 CDBSPL 7 Water heater $ 29.50 CDBSPL 8 Garbage disposal $ 29.50 m CDBSPL 9 Water closet $ 29.50 CDBSPL 10 Catch basin or area drain $ 29.50 CDBSPL 11 Tub/shower/shower pan $ 29.50 CDBSPL 12 Absorption valve $ 29.50 CDBSPL 13 Clothes washer $ 29.50 CDBSPL 14 Backwater valve $ 29.50 CDBSPL 15 Other Plumbing $ 29.50 CDBSPL 16 Floor drain/floor sink/hub drain $ 29.50 CDBSPL 17 Backflow Preventer $ 29.50 CDBSPL 18 Urinal $ 29.50 CDBSPL 19 Hose bibs $ 29.50 CDBSPL 20 Dishwasher $ 29.50 CDBSPL 21 Drinking fountain $ 29.50 CDBSPL 22 Trench drain $ 29.50 CDBSPL 23 Ejectors/sump pump $ 29.50,._ CDBSPL 24 Expansion tank $ 29.50 CDBSPL 25 Fixture cap _ $ 29.50 CDBSPL 26 Ice maker $ 29.50 m CDBSPL 27 Primer $ 29.50 Water service/sanitary/storm sewer: CDBSPL 28 Water service (first 100 feet or fraction thereof) $ 101.50 CDBSPL 29 Water service (second 100 ft. or fraction thereof) $ 57.75 CDBSPL 30 Building sewer (first 100 feet or fraction thereof) $ 101.50 CDBSPL 31 rBuilding sewer (each additional 100 ft. or fraction thereof) $ 57.75 _ CDBSPL 32 Building storm sewer or rain drain (each 100 feet or fraction thereof) $ 101.50 CDBSPL 33 Storm or rain drain (each additional 100 feet or fraction thereof) $ 57.75 Alternate potable water heating system (coil, heat pumps, extractor, water treatment equipment, CDBSPL 34 etc.) $ 101.50 w Manufactured Homes: CDBSPL 35 M/H park sewer connection & water distribution system $ 101.50 per space Prefabricated structures site inspections (includes site development & connection of the CDBSPL 36 prefabricated structure) $ 101.50 Commercial Plumbing (all buildings other than R-3 & U-1): _ CDBSPL 37 Minimum Fee $ 149.25 CDBSPL 38 Fixture cap- commercial $ 29.50 CDBSPL 39 Backflow preventer $ 29.50 CDBSPL 40 Sink/basin/lavatory $ 29.50 CDBSPL 41 Absorption valve $ 29.50 CDBSPL 42 Tub/shower/shower pan $ 29.50 CDBSPL 43 Backwater valve $ 29.50 CDBSPL 44 Water closets _ $ 29.50 CDBSPL 45 Dishwashers $ 29.50 CDBSPL 46 Garbage disposal $ 29.50 CDBSPL 47 Clothes washer $ 29.50 CDBSPL 48 Water heater $ 29.50 CDBSPL 49 Urinal $ 29.50 CDBSPL 50 Hose bibs $ 29.50 CDBSPL 51 Trench drain $ 29.50 CDBSPL 52 Catch Basins or area drain $ 29.50 CDBSPL 53 Drinking fountain $ 29.50 CDBSPL 54 Expansion tank $ 29.50 CDBSPL 55 Interceptor/grease trap $ 29.50 CDBSPL 56 Floor drains/floor sink/hub drain $ 29.50 CDBSPL 57 Ejectors/sump pump $ 29,50 CDBSPL 58 Ice maker $ 29.50 CDBSPL 59 Primer $ 29.50 CDBSPL 60 Roof drain (commercial) $ 29.50 m CDBSPL 61 Storm drain - first 100 feet $ 63,25 CDBSPL 62 Storm drain - each additional 100 feet $ 29.50 CDBSPL 63 Swimming pool piping $ 96.75 CDBSPL 64 Solar $ 29.50 CDBSPL 65 Other - plumbing $ 29.50 CDBSPL 66 Water service - first 100 feet $ 101.50 _ CDBSPL 67 Water service (each additional 100 ft) - $ 57.75 CDBSPL 68 Sewer - first 100 feet _ $ 101.50 CDBSPL 69 Sewer -each additional 100 feet $ 57.75 Medical Gas - fee based on installation costs and system equipment, including but not limited to inlets, outlets, fixtures and appliances CDBSPL 70 Storm sewer - first 100 feet $ 101.50 CDBSPL 71 Storm sewer - each additional 100 feet $ 57.75 Valuation: CDBSPL 72 $0-$25,000 $ 142.50 $142.50 for the first $25,000 plus $3.25 for each additional $1,000 or fraction thereof, to and CDBSPL 73 $25,001 - $50,000 NvWw $ w142.50 including $50,000 first $50,000 plus $2.25 for each additional $1,000 or fraction thereof, to and including CDBSPL 74 $50,001 - $100,000 $ 223.75 $100,000 or e first $100,000 plus $1.25 for each additional $1,000 or fraction CDBSPL 75 $100,001 and above $ 336.25 thereof CDBSPL 76 M/H park sewer collection/water distribution system $ 96.75 per space CDBSPL 77 Alternative potable water heating systems (coils, extractors, heat pumps, etc.) $ 61,75 CDBSPL 78 M/H Park Installation Connecttion $ 78.00 Recreational Vehicle and Manufactured Dwelling Parks CDBSPL 79 Five or fewer spaces $ 308.75 plus $53.00 per CDBSPL 80 Six to 19 spaces $ 308.75 space plus $40.50 per CDBSPL 81 Twenty or more spaces _ $ 742.00 space _. MECHANICAL: CDBSM 1 1 Minimum Fee $ 87.75 each CDBSM 2 Furnace - up to 100,000 BTU $ 21.75 each CDBSM 3 Furnace -greater than 100,000 BTU $ 25.25 each CDBSM 4 Furnace/burner including duct work/vent/liner $ 21.75 CDBSM 5 Floor furnace, including vent $ 16.25 _ each CDBSM 6 Chimney/liner/flue/vent $ 16.25 CDBSM 7 Flue vent for water heater or gas fireplace $ 16.25 CDBSM 8 _ Installation or relocation of suspended heater, recessed wall heater or floor -mounted heater $ 16.25 each CDBSM 9 Water heater $ 16.25 CDBSM 10 Wood/pellet stove $ 32.00 CDBSM 11 Pool or spa heater, kiln $ 16.25 CDBSM 12 Appliance vent installation, reloation or replacement not included in an appliance permit $ 9.75 each CDBSM 13 Heat pump $ 21.75 each CDBSM 14 Air -handling unit up to 10,000 cubic feet per minute (cfm) $ 12.00 each CDBSM 15 Air -handling unit of 10,000 cfm and over $ 21.75 each CDBSM 16 Evaporative cooler other than portable $ 12.00 each CDBSM 17 Air conditioner $ 12.00 CDBSM 18 Attic/crawl space fans $ 12.00 CDBSM 19 Ventilation fan connected to single duct $ 10.00 each CDBSMj 201 Ductwork - no appliance/fixture $ 10.00 Ventilation system that is not a portion of any heating or air-conditioning system authorized by a CDBSM 21 permit $ 12.50 each CDBSM 22 Hood served by mechanical exhaust, including ducts for hood 12.50 each CDBSM 23 _'$ Range hood/other kitchen equipment $ 12.50 CDBSM 24 Clothes dryer exhaust $ 12.50m CDBSM 25 Other environment exhaust/ventilation _ $ 12.50 CDBSM 26 Gas or wood fireplace/insert $ 32.00 each CDBSM 27 Decorative gas fireplace $ 32.00 CDBSM 28 Other heating/cooling $ 32.00 each CDBSM 29 Other fuel appliance $ 12.50 each CDBSM 30 as fuel piping outlets $ 8.25 - _ per hour / 1/2 Additional plan review required by changes, additions or revisions to approved plans (min charge /2 hour minimum CDBSM 31 hour) $ 125.00 charge CDBSM 32 Hydronic hot water system $ 80,00 CDBSM 33 Fuel fired or electrical heat exchanger (to be used in a hydronic heating system) $ 30.75 CDBSM 34 Mini split system $ 41.50 OAR 918-050- Commercial Mechanical Permit Fee Table 100 Commercial and Multifamily New, Alterations, Additions, Repairs & Accessory Structures Total Valuation CDBSM 35 $1 to $2,000 $ 76.50 W first $2,000 plus 11.50 for each additional $1,000 or fraction thereof, to and CDBSM 1 36 $2001 to $25,000 $ 76.501 1 luding $25,000 first $25,000 plus 9.50 for each additional $1,000 or fraction thereof, to and CDBSM 37 $25,001 to $50,000 $ 341.00 including $50,000 first $50,000 plus 6.25 for each additional $1,000 or fraction thereof up to and including CDBSM 38 $50,001 to $100,000 $ 578.50 $100,000 first plus 4.25 for each additional $1,000 or fraction CDBSM 39 $100,001 and up $ 891.00 thereof ELECTRICAL: - # of inspections Residential - New 1 & 2 family dwellings or new multi -family per dwelling unit. per permit Service included, allowed CDBSE 1 1,000 square feet or less $ 359.25 4 _ $ 366.50 11/1/2024 CDBSE 2 Each additional 500 square feet, or portion thereof $ 61.00 $ 62.25 11/1/2024 Multi -family building containing three or more apartments; Determine fee for the largest unit using the sq. ftg. rates above, additional units are charged at 50%. 4 CDBSE l�3 Each manufactured home or modular dwelling service or feeder $ 167.25 2 � $ 170.75 11/1/2024 Service/feeders: installation, alteration or relocation: CDBSE 4 200 amps or less $ 204.00 2 $ 208.25 11/1/2024 CDBSE 5 201 amps to 400 amps $ 248.75 2 $ 253.75 11/1/2024 CDBSE 6 401 amps to 600 amps $ 406.25 2 $ 414.50 11/1/2024 CDBSE 7 601 amps to 1000 amps $ 507.00 2 $ 517.25 11/1/2024 CDBSE 8 Over 1000 amps or volts $ 1,230.75 2 $ 1,255.25 11/1/2024 CDBSE 9 Reconnect only _ $ 167;00 2 $ 170.25 11/1/2024 Temporary service or feeders - installation, alterations or relocation _ _ CDBSE 10 200 amps or less $ 167.00 2M $ 170.25 11/1/2024 CDBSE 11 201 amps to 400 amps $ 228.25 2 $ 233.00 11/1/2024 CDBSE 12 Over 401 amps to 600 amps o $ 303.25 _ 2 $ 309.50 11/1/2024 CDBSE 13 Over 601 amps to 1000 volts - see "service/feeders" (10 branch circuits included) above $ 393.50 $ 401.50 11/1/2024 CDBSE 14 Over 1,000 amps or volts $ 553.50 $ 564.75 11/1/2024 Branch circuits - new, alteration or extension per panel Fee for branch circuits with purchase of service or feeder fee CDBSE 15 Each branch circuit $ 16.00 w 2 $ 16.25 11/1/2024 Fee for branch circuits without purchase of service or feeder fee CDBSE 16 First branch circuit $ 156.50 2 $ 159.75 11/1/2024 CDBSE 17 Each additional branch circuit $ 16.00 2 $ 16.25 11/1/2024 - - -�� # of inspections per permit Miscellaneous (service or feeder not included) allowed CDBSE 18 Each water or sewage pump or irrigation circle $ 167.25 2 $ 170.75 11/1/2024 CDBSE 19 Each sign or outline lighting $ 167.25 2 $ 170.75 11/1/2024 CDBSE 20 Signal circuit(s) or a limited energy panel, alteration or extension - commercial use _ $ 667.25 2 $ 170.75 11/1/2024 Renewable Energy Systems OAR 918-309- CDBSE 21 1�5' KVA or less $ 79.00 maximum 2 0070 OAR 918-309- CDBSE 22 5.01 KVA to 15KVA $ 94.00 maximum 2 0070 OAR 918-309- CDBSE 23 15.01 KVA to 25 KVA $ 156.00 maximum 2 0070 2 per KVA / $7.50 per kva over 25 kva, $156.00 for first 25 kva - maximum fee at OAR 918-309- CDBSE 24 For solar generation systems in excess of 25 KVA and up to 100 KVA $ 7.50 maximum 100 kva 0070 Wind Generation Systems OAR 918-309- CDBSE 25 25.01 KVA to 50 KVA $ 204.00 maximum 0070 OAR 918-309- CDBSE 26 50.01KVAto 100 KVA $ 469.00 maximum 0070 Solar Farms OAR 918-309- CDBSE 27 The first 25 KVA $ 156.00 maximum 0070 2 per KVA /-$7.50 per kva over 25 kva, $156.00 for first 25 kva - maximum fee at OAR 918-309- CDBSE 28 For solar generation systems in excess of 25 KVA and up to 100 KVA $ 7.50 maximum 100 kva 0070 Limited energy - residential use CDBSE 29 One and two family _ $ 82.00 $ 83.75 11/1/2024 per floor; 2 inspections CDBSE 30 Multi -family limited energy and/or protective signaling $ 152.50 allowed per floor $ 155.75 11/1/2024 _ OAR 918-309- CDBSE 31 Master permit - renewed annually at no additional fee other than required annual inspections. $ 100.00 maximum 0100 CDBSE 32 Additional plan review required by changes, additions or revisions to approved plans $ 125.00 per hour MANUFACTURED DWELLINGS: per installation + a -W applicable state CDBSMF 1 Manufactured dwelling and cabana installation permit $ 798.75 fee(s) CDBSMF 2 Manufactured dwelling and cabana re -inspection fee $ 184.00 per re -inspection OAR 918-500- CDBSMF 3 State Cabana Fee $ 30.00 maximum 0105 New Manufactured Home Park Fee Schedule: The Area Development Permit ee to e calculated based on the valuations shown in Ta le 2 o OAR 918-600-0030 for Manufactured Dwelling/Mobile Home Parks and Table 2 of OAR 918-650-0030 for OAR 918-600- Recreational Park & Organizational Camp - and applying the valuation amount to Table 1 as 0030 & OAR referenced for each. maximum 918-650-0030 Additional plan review required by changes, additions or revisions to approved plans (min charge - CDBSMP 1 Y2 hour) $ 125.00 per hour State surcharge on manufactured home park permit fee is 12% of total Plan check fee for manufactured home park is 65% of building permit fee Prefabricated Structural Inspections (includes site development and connection of the prefabricated structure) CDBSMP 2 MH Park Installation connection $ 70.00 OAR 340-071- CDD - Onsite Wastewater Division 0140 Site evaluations, construction installation permits, renewal permits, alteration permits, authorization notices and existing system evaluation reports incur an additional $M $117 surcharge per OAR 340-071-0140 On -site sewage disposal systems: CDES 1 New site evaluation -single family dwelling $ 1,032.00 $ 1,053.00 11/1/2024 CDES 2 Site evaluation - springtime observation * _ $ 560.00 $ 571.25 11/1/2024� Commercial Facility Systems: CDES 3 First 1,000 gallons projected daily sewage flow $ 1,032.00 $ 1,053.00 11/1/2024 For each additional 500 gallons or part thereof above 1,000 gallons projected daily sewage flow up CDES 4 to 5,000 gallons $ 294.00 $ 300.00 11/1/2024 T-a—E5 tee paid tor a site eva uation report entit es t e app scant to as many site inspections on a single parcel or lot as are necessary to determine site suitability for a single system. The applicant may request additional site inspections within ninety (90) days of the initial site evaluation at no extra cost. Separate fees shall be required if site inspections are to determine site suitability for more than one (1) system on a single parcel or lot. *Not subject to surcharge Consultation Fee: based on loaded salary rate of staff performing the CDES 5 Onsite Wastewater staff in office ACS service based on loaded salary rate of staff performing the CDES 6 Onsite Wastewater staff in the field (one hour minimum) ACS service Construction installation permit: CDES 7 First 1,000 gallons projected daily sewage flow - standard on -site system $ 1,465.00 w $ 1,495.00 11/1/2024 CDES 8 For each additional S00 gallons or part thereof above 1,000 gallons m $�� 214.00 $ 218.00 11/1/2024 Alternative systems: CDES 9 Alternative Treatment Technology (ATT) System to Drain Field $ 2,063.00 $ 2,104.00 11/1/2024 CDES 10 iAlternative Treatment Technology (ATT) System to Sand Filter $ 2,358.00 $ 2,405.00 11/1/2024 CDES 11 Capping fill $ 2,063.00', $ 2,104.00 11/1/2024 CDES 12 Gray water waste disposal sump $ 635.00 $ 648.00 11/1/2024 CDES 13 Pressure distribution $ 1,879.00 $ 1,917.00 11/1/2024 CDES 14 Recirculating gravel filters $ 2,510.00 _ $ 2,560.00 11/1/2024 CDES 15 Sand filter $ 2,358.00 $ 2,405.00 11/1/2024 CDES 16 Seepage trench $ 1,465.00 $ 1,494.00 11/1/2024 CDES 17 Steep slope _ $ 1,465.00W $ 1,494.00 11/1/2024 CDES 18 Tile dewatering $ 3,977.00 $ 4,057.00 11/1/2024 t the cliscre0ion o t e ITartment, t o permittee maybe assesse a reinspection ee, not to exceed $230.00, when a precover inspection correction notice requires correction of improper construction and at a subsequent inspection, the Department finds system construction deficiencies have not been corrected. The Department may elect not to make further precover OAR 340-071- CDES 19 inspections until the reinspection fee is paid. $ 230.00 maximum 0170 (4) Commercial Facility Systems (includes ADU when combined with residential), Plan Review: For system with projected daily sewage flow of 600 gallons, but not more than 1,000 gallons CDES 20 projected daily sewage flow $ 500.00 $ 510.00 11/1/2024 For each additional 500 gallons or part thereof above 1,000 gallons to a maximum sewage flow limit CDES 21 of 5,000 gallons per day $ 96.00 $ 98.00 11/1/2024 Residential Systems Variance, Plan Review For system with projected daily sewage flow of less than 600 gallons and is designed by certified CDES 1 22 1professional. $ 500.00 $ 510.00 11/1/2024 Permit Transfer, Re -instatement or Renewal: CDES 23 Field visit required $ 500.00 $�510.0011/112024 CDES 24 No field visit required $ 331.00 $ 338.00 11/1/2024 Alteration Permit CDES 25 Major $ 1,326.00� $ 1,353.00 11/1/2024 CDES 26 Minor $ 662.00 $ 675.00 11/1/2024 Repair Permit - single family dwelling CDES 27 Major $ 662.00 $ 675.00 11/1/2024 CDES 1 28 IMinor $ 413.00 $ 421.00 11/1/2024 Authorization notice: _ CDES 29 Field visit required _ $ 796.00 $ 812.00 11/1/2024 CDES 30 No field visit required $ 383.00 $ 391.00 11/1/2024 Septic location approval: CDES 31 Site/system verification - Field visit required $ 413.00 $ 421.00 11/1/2024 CDES 32 No field visit required $ 109.00 $ 111.00 11/1/2024 CDES 33 Pumper truck inspection* $ 251.00 � $ 256.00 11/1/2024 CDES 34 Existing system evaluation report $ 663.00 $ 677.00 11/1/2024 CDES 35 Holding Tanks $ 1,260.00 $ 1,285.00 11/1/2024 Report Fees CDES 36 Holding Tanks _ $ 46.00 $ 47.00 11/1/2024 OAR 340-071- CDES 37 Other Alternative systems - Individual Customer and Service Providers $ 96.00 0130 (17) OAR 340-071- CDES 38 Other Alternative Systems - Compliance Recovery Fee, per each violation $ 125.00 0140 (7) CDES 39 Septic tank abandonment inspection $ 251.00 _ per site $ 256.00 11/1/2024 CDD may charge twice the established fee for a septic permit or approval as a compliance recovery OAR 340-071- fee. 0140 (7) (10) DEQ surcharge. (a) To offset a portion of the administrative and program oversight costs of the statewide onsite wastewater management program, DEQ and contract counties must levy a surcharge for each site evaluation, report permit and other activity for which an application is required in this division. The surcharge fee is listed in Table 9F as determined by DEQ. This surcharge does not apply to pumper truck inspections, annual report evaluation fees, or certification of installers or maintenance providers. Proceeds from surcharges collected by DEQ and contract counties must be accounted for separately. Each contract county must forward the proceeds to DEQ in accordance with its agreement with the DEQ. Activity Surcharge SUP alral-at:* UP fnr q- examined, based on a M . - --on, each __ projected 2024) CDES 48 CDES 41 B. to-2,000 gallons- Cl3€S 42 CD€S 4- n. 3,001 ton 000 gallnnc CDES 44 E. 4,001 galens �.� ✓rDF� 4- f'. RS4 rrin.,iRStallatiGR permit _ . CDES 46 .nt CDES 47 AlterPeFMit CD€S 48 C9€S 49 &Ast[ � ,item evaluation r ,-t Site evaluation, for each site examined, based on a projected flow of: (Effective beginning August 2024) CDES 50 IA. 1,000 gallons or less $ 117.00 CDES 51 B. to 2,000 gallons $ 117.00 CDES 52 C. 2,001 to 3,000 gallons $ 117.00 CDES 53 D. 3,001 to 4,000 gallons $ 117.00 CDES 54 E. 4,001 gallons or more $ 117.00 CDES 55 Construction - installation permit �� $ 117.00 NN pm CDES 56 Renewal permit $ 117.00 CDES 57 Alteration permit $ 117.00 CDES 58 Authorization notice $ 117.00 CDES 59 Existing system evaluation report $ 117.00 CDD - Planning Division _ A CDPN 1 Accessory Dwelling Unit Review $ 861.00 $ 878.00 11/1/2024 CDPN 2 Administrative determination with notice - Major $ 2,347.00 $ 2,394.00 11/1/2024 CDPN 3 Administrative determination with notice - Minor $ 1,503.00 $ 1,533.00 11/1/2024 CDPN 4 Administrative determination - EFU alteration of a dwelling; Historic ADU $ 784.00 $ 800.00 11/1/2024 ORS CDPN 5 Appeals -Administrative $ 250.00 maximum 215.416(11) +20% of original CDPN 6 Appeals to Board of Commissioners - Deposit $ 4,069.00 fee/Deposit/ ACS $ 4,150.00 11/1/2024 CDPN 7 Appeals to Board of Commissioners - not accepted ACS CDPN 8 Appeals - LUBA Remand Hearing $ 5,000.00 Deposit/ACS CDPN 9 Conditional Use (template dwelling) $ 4,272.00 $ 4,357.00 11/1/2024 Conditional Use (template dwelling proposed in Haner Park, Section 36, Skyline Subdivision, 1st CDPN 10 1 edition and a portion of Squaw Creek Canyon Recreational Estates, 1 st edition) $ 2,991.00 $ 3,051.00 11/1/2024 CDPN 11 1 Conditional Use (Home Occupation - Type 1 for EFU or F Zone) $ 1,533.00 $ 1,564.00 11/1/2024 CDPN 12 Conditional Use (Home Occupation -Type 2) $ 2,052.00 $ 2,093.00 11/1/2024 CDPN 13 Conditional Use (Home Occupation - Type 3) $ 4,177.00 $ 4,261.00 11/1/2024 CDPN 14 Conditional Use (new destination resort) $ 24,050.00 or ACS $ 24,531.00 11/1/2024 CDPN 15 Conditional Use (non -farm dwelling) $ 5,312.00 $ 5,418.00 11/1/2024 Conditional Use (non -farm dwelling proposed in Squaw Creek Canyon Recreational Estates, 1 st _ m CDPN 16 edition and Meadow Crest Acres) $ 3,719.00 $ 3,793.00 11/1/2024 CDPN 17 Conditional Use (power transmission line and communication tower or pole) $ 7,291.00 or ACS $ 7,437.00 11/1/2024 CDPN 18 Conditional Use (P.U.D. or cluster development) $ 8,842.00 $ 9,019.00 11/1/2024 CDPN 19 Conditional Use (schools with 100 students or more) $ 6,101.00 or ACS $ 6,223.00 11/1/2024 CDPN 20 Consultant Fee (for consultant or expert retained by County and paid for by applicant) ACS CDPN 1 21 Declaratory Ruling (status determined under Chap. 22.40) $ 2,308.00 _ EHE_ $ 2,354.00 11/1/2024 CDPN 1 22 IDeclaratory Ruling for Destination Resorts ACS CDPN 23 Destination Resort Overnight Lodging Tracking (Eagle Crest) $ 5,000.00 Deposit/ACS CDPN 24 Expedited Land Divisions $ 6,864,00 or ACS $ 7,001.00 11/1/2024 CDPN 25 Extension Request $ 563.00 $ 574.00 11/1/2024 CDPN 26 Filming Activities $ 4,976.00 $ 5,076.00 11/1/2024 plus $42-5 $127 CDPN 27 Final Plat Review (all plats) $ 203.00 per lot $ 207.00 11/1/2024 Historic Landmarks Commission Public Hearing and Review: CDPN 28 Add historic structure/site to Goal 5 Inventory $ 2,815.00 $ 2,871.00 11/1/2024 CDPN 29 _ Appeal of Landmarks Commission Decision to Board _ $ 1,322.00 $ 1,348.00 11/1/2024 CDPN 30 Exterior alteration - major $ 625.00 $ 637.00 11/1/2024 CDPN 31 Delete Historic Site/Building from Goal 5 Inventory $ 2,815.00 $ 2,871.00 11/1/2024 CDPN 32 Demolish a Historic Landmark Structure $ 2,815.00 $ 2,871.00 11/1/2024 CDPN 33 Moving a Historic Landmark Structure $ 625.00 $ 637.00 11/1/2024 Historic Administrative Review (Staff) ORS CDPN 34 Appeal of Administrative Decision $ 250.00 maximum 215.416(11) CDPN 35 Exterior Alteration - Pilot Butte Canal Historic District $ 139.00 � $ 142.00 11 /112 __../2024 CDPN 36 Exterior alteration - minor $ 438.00 $ 447.00 11/1/2024 37 Improvement Agreement - Modified d _ $ 2,290.00 $ 2,336.00 11/1/2024 38 Improvement Agreement - New $ 3,817.00 $ 3,893.00 11/1/2024 39 Land Use Verification Letter and/or Information Sheet _ $ 339.00 $ 346.00 11/1/2024 rDP 40 Landscape Management Review (not visible from road or stream) $ 861.00 $ 878.00 11/1/2024 41 Landscape Management Review (river) $ 2,033.00 $ 2,074.00 11/1/2024 42 Landscape Management Review (road)m $ 1,448.00 $ 1,477.00 11/1/2024 Landscape Management Review (property includes river frontage, applieds to non -conforming river CDPN 43 setbacks) $ 3,051,00 $ 3,112.00 11/1/2024 CDPN 44 Landscape Management Review (river setback exception) $ 3,945.00 $ 4,024.00 11/1/2024 CDPN 4S Landscape Management Review (and less than 50 feet from rimrock) $ 2,808.00 $ 2,864.00 11/1/2024 plus U9$39 per CDPN 46 Limited Land Use Decision $ 6,864.00 lot $ 7,001.00 11/l/2024 Limited Use Permit (Agri -tourism & other events in EFU zone) CDPN 47 Type 1 or Renewal of Type 1, 2 or 3 $ 784.00 $ 800.00 11/1/2024 CDPN 48 Type $ 1,533.00 $ 1,563.00 11/1/2024 CDPN 49 Type 3 $ 1,533.00 $ 1,563.00 11/1/2024 CDPN 50 Lot of Record Verification (each proposed lot) $ 1,411.00 $ 1,439.00 11/1/2024 CDPN 51 Major Code Change (applicant will be billed for M56 Notice) $ 17,994.00 _ plus ACS (Notice) $ 18,354.00 11/1/2024 CDPN 52 Master Plan (including final master plan for destination resort) $ 8,966.00 $ 9,145.00 11/1/2024 CDPN 53 Master Plan (ORS 197 - Skyline Forest) $ 31,296.00 $ 31,922.00 11/l/2024 CDPN 54 Minor code changes $ 9,038.00 $ 9,219.00 11/l/2024 CDPN 55 Modification of Conditions $ 2,347.00 $ 2,395.00 11/1/2024 CDPN 56 Modification of Submitted Application $ 1,503.00 $ 1,533.00 11/1/2024 No Shooting Zone $ 4,469.00 $ 4,558.00 11/1/2024 58 Noise Ordinance Variance/Permit $ 2,347.00 $ 2,394.00 11/1/2024 59 Noise Ordinance Variance Appeal $ 1,357,001,384.00 11/1/2024 rCDPN57 60 Non -Conforming Use Alteration (without prior verification) $ 3,098.00 $ 3,160.00 11/l/2024 61 Non -Conforming Use Verification $ 2,467.00 $ 2,516.00 11/1/2024 62 Non -Conforming Use Alteration (with prior verification) $ 2,467.00 $ 2,516.00 11/1/2024 63 Non -Conforming Use Verification (River/Wetland/Flood Plain) $ 4,565.00 $ 4,656.00 11/1/2024 CDPN 64 Outdoor Mass Gathering $ 4,469.00 $ 4,558.00 11/1/2024 CDPN 65 Outdoor Mass Gathering Renewal $ 555.00 $ 566.00 11/1/2024 CDPN 66 Extended Outdoor Mass Gathering $ 4,469.00 $ 4,558.00 11/1/2024 CDPN 67 Extended Outdoor Mass Gathering Renewal $ 806.00 $ 822.00 11/1/2024 �r plus$54$55 per CDPN 1 68 lPartition $ 4,976.00 lot $ 5,076.00 11/1/2024 CDPN 69 Petition for Incorporation $ 16,286.00 ORS 197,175 $ 16,612.00 11/1/2024 Permit sign -off for other agency (Role change, Land Use Compatibility Statement, DMV, Water Resources, etc.) CDPN 70 Land Use $ 2,347.00 $ 2,394.00 11/1/2024 CDPN 71 LUCS sign off $ 139.00 $ 142.00 11/1/2024 CDPN 72 Renewal $ 55.00 $ 56.00 11/1/2024 CDPN 73 Plan Amendment (without goal exception) $ 11,670.00 $ 11,903.00 11/1/2024 CDPN 74 Plan Amendment (including goal exception/UGB expansion) $ 16,286.00 or ACS $ 16,612.00 11/1/2024 CDPN 75 Planning Inspection Fee w $ 1,174.00 $ 1,197.00 11/1/2024 CDPN 76 Pre -application meeting ACS CDPN 77 Property Line Adjustment $ 861.00 $ 878.00 11/1/2024 CDPN 78 Property Line Adjustment with notice $ 1,503,00 � $ 1,533.00 11/1/2024 CDPN 79 _ Property Line Adjustment (consolidation) $ 657.00 $ 670.00 11/1/2024� CDPN 80 Reconsideration by Hearing Officer $ 1,863.00 $ 1,900.00 11/1/2024 CDPN 81 Recreational Vehicle Used for Residential Purposes $ 861.00 $ 878.00 11/1/2024 CDPN 82 Rimrock Setback Site Plan (within 50 feet of rim outside LM zone) $ 1,409.00 $ 1,437.00 11/1/2024 CDPN 83 Road Dedication $ 1,503.00 $ 1,533.00 11/1/2024 CDPN 84 Road Name Change` $ 1,409.00 $ 1,437.00 11/1/2024 CDPN 85 Road Vacation without public hearing $ 1,770.00 ORS 368.341(4) $ 1,805.00 11/1/2024 CDPN 86 Road Vacation with public hearing $ 3,540.00 ORS 368.341(4) $ 3,611.00 11/1/2024 CDPN 87 Sign Permit $806.00 $ 822.00 11/1/2024 CDPN 88 Sign Permit (change of approved sign) $ 242.00 $ 247.00 11/1/2024 CDPN 89 Sign Permit with Variance $ 1,987.00 $ 2,027.00 11/1/2024 CDPN 90 Similar Use Ruling $ 2,191.00 $ 2,235.00 11/1/2024 Site Plan: Alteration or Enlargement of 25% or less (in structural area or required parking)** if site conforms CDPN 91 with all existing standards $ 1,503.00 $ 1,533.00 11/1/2024 CDPN 92 Alteration or Enlargement, 26% to 100% (in structural area or required parking)** $ 3,592.00 $ 3,664.00 11/1/2024 CDPN 93 Alteration or Enlargement of over 100% (in structural area or required parking)** $ 4,976.00 $ 5,076.00 11/1/2024 Change of Use (no change in structural area or required parking) site conforms with all existing CDPN 94 standards $ 1,503.00 $ 1,533.00 11/1/2024 CDPN 95 Site Plan with New Development** (no previous site plan approval) _ $ 5,774.00 $ 5,889.00 11/1/2024 **All new site plans and major and minor alterations are subject to the following additional fees: CDPN 96 Per 1,000 sq. feet of structure $ 79.00 $ 81.00 11/1/2024 CDPN 97 Per developed acre (over 1 acre) $ 188.00 over 1 acre $ 192.00 11/1/2024 CDPN 98 Site Plan/Surface Mining $ 6,768.00 $ 6,903.00 11/l/2024 Site Plan/Surface Mining Combining Zone (SMIA): CDPN 99 1/4 mile from mining site and two dwellings closer $ 806.00 $ 822.00 11/1/2024 CDPN 100 250 feet to 1/4 mile from mining site $ 1,409.00 $ 1,437.00 11/1/2024 CDPN 101 Within 250 feet of mining site or special ESEE standards apply $ 2,456.00 $ 2,505.00 11/1/2024 CDPN 102 Site Plan/Wildlife Review $ 1,503.00 $ 1,533.00 11/1/2024 CDPN 103 Partition/subdivision SMIA review $ 1,566.00 $ 1,597.00 11/1/2024 CDPN 104 Solar Access Permit $ 1,260.00 $ 1,285.00 11/1/2024 CDPN 105 Solar Shade Exemption $ 2,458,00 $ 2,507.00 11/1/2024 CDPN 106 Solar Variance $ 1,503.00 $ 1,533.00 11/1/2024 CDPN 107 Special operating permit $ 3,529.00 $ 3,600.00 11/1/2024 CDPN 108 Subdivision Name Change $ 1,503.00 $ 1,533.00 11/1/2024 CDPN 109 Subdivision (cemetery) $ 3,826.00 $ 3,903.00 11/1/2024 plus $54$55 per CDPN 110 Subdivision Replat $ 3,960.00 lot $ 4,039.00 11/1/2024 plus$64 $65 per CDPN 111 Subdivision (Tentative Plat) $ 8,842.00 lot $ 9,019.00 11/1/2024 Temporary Use: CDPN 112 All other $ 1,503.00� $ 1,533.00 11/1/2024 CDPN 113 Land Use Permit $ 1,503.00 $ 1,533.00 11/1/2024 CDPN 114 Manufactured Home Storage $ 546.00 $ 557.00 11/1/2024 CDPN 115 Temporary Residence For Medical Condition Temporary Residence for Medical Condition/Hardship Dwelling EFU or Forest Zone $ 861.00 $ 1,363.00 $ 878.00 $ 1,390.00 11/1/2024 11/1/2024 CDPN 116 CDPN 117 RV as Temporary Residence $ 546.00 DCC 18.116.095 $ 557.00 11/1/2024 RV as Temporary Residence Renewal $ 173.00 DCC 18,116.095 $ 176.00 11/1/2024 119 Variance $ 4,224.00 $ 4,308.00 11/1/2024 LDP118 Variance Type II (variance from less than 25% of the standards in urban area/less than 10% of 120 standards in the county) $ 2,456.00 $ 2,505.00 11/1/2024 121 Zone Change $ 11,437,00 plus ACS (notice) $ 11,666.00 11/1/2024 Note: Where"ACS is noted, applicant may be required to pay an advance deposit reflecting the estimated cost of service. _ CDPN 122 Oregon Liquor and Cannabis Commission License - Original Application $ 100.00 maximum ORS 471.166 (8) CDPN 123 Oregon Liquor and Cannabis Commission License - Change in Ownership, Location or Privilege $ 75.00 maximum ORS 471,166 (8) CDPN 124 Oregon Liquor and Cannabis Commission License - Renewal or Temporary Application $ 35.00 maximum ORS 471.166 (8) Public Health - Environmental Health Division LICENSES: Food Service Note: A supplementary inspection charge equal to 50% of the annual license fee shall be assessed for each complete inspection required because of failure to meet applicable standards when such complete inspection is performed during the license period in addition to the two semi-annual inspections normally performed. Charges accrued and not paid during the current license period will be added to the license fee for the next license period and will be subject to the late penalties specified. New licensees will not be assessed any surcharges accrued by the previous license holder. Any licensed facility opened in Oct/Nov/Dec will be charged 1 /2 fee. Full service restaurant seating: EH 1 0 -15 $ 944.32 $ 1,020.00 10/1/2024 EH 2 16 - 50 $ 1,032.72 $ 1,116.00 10/1/2024 EH 3 51 -150 $ 1,237.60 $ 1,337.00 10/1/2024 EH 4 151 and over $ 1,399.84 $ 1,512.00 10/1/2024 EH 5 Commissary $ 380.64 $ 412.00 10/1/2024 EH 6 Warehouse $ 304.72 $ 330.00 10/1/2024 EH 7 Limited service $ 774.80 $ 837.00 10/1/2024 Government Entities - fee is 100% of full service restaurant fees, based on restaurant seating. Senate Bill 631 Mobile Unit Annual Operating License per OAR 333-162-0020 EH 8 Class 1 $ 341.00 $ 369.00 10/1/2024 EH 9 Class II $ 400.40 $ 433.00 10/1/2024 EH 10 Class III $ 571.20 $ 617.00 10/1/2024 EH 11 Class IV $ 742.30 $ 802.00 10/1/2024 Temporary Restaurant License $ - EH 12 Temporary Benevolent: Must show a valid I.R.S. tax exempt I.D. number to qualify $ 60.32 per event $ 66.00 10/1/2024 EH 13 Temporary for Profit $ 191.36 per event $ 207.00 10/1/2024 EH 14 Temporary Prior to Event: Temporary Restaurant Applications must be received at least 7 calendar days before the day the event starts. $ 122.72 per event $ 133.00 10/1/2024 EH 15 Temporary at Event (operating without a license) $ 304.72 per event $ 330.00 10/1/2024 EH 1 16 lTemporary Event - Events with five or more applicants (received 7 calendar days before the event) $ 106.08 per event $ 115.00 10/1/2024 EH Exempt Foods Agreement Form Fee - foods exempt from licensure but still requiring review $ 45.00 $ 49.00 10/1/2024 Seasonal or Intermittent Temporary Restaurant License EH 18 Seasonal/Intermittent Temporary Benevolent: Must show a valid I.R.S. tax exempt I.D. number to qualify $ 94.64 $ 103.00 10/1/2024 EH 19 Seven days or more before event start date (for profit) $ 191.36 $ 207.00 10/l/2024 EH 20 Less than seven days before event start date (for profit) $ 227.76 $ 246.00 10/1/2024 EH 21 Operational Review (for profit) $ 127.92 $ 139.00 10/1/2024 Operational Review Benevolent: Must show a valid I.R.S. tax exempt I.D. number to qualify EH 22 Re -check fee for Temporary Restaurant $ 127.92 $ 139.00 10/l/2024 School Cafeteria & Kitchens: EH 23 School Inspection (production kitchen) $ 304.72 $ 330.00 10/1/2024 EH 24 School Inspection (satellite branch) $ 227.76 $ 246.00 10/1/2024 EH 25 Bed and breakfast (food facility) $ 570.96 $ 617.00 10/1/2024 Vending machines (of potentially hazardous foods): EH 26 1 - 10 $ 183.04 $ 198.00 10/1/2024 EH 27 11 -20 $ 242.32 $ 262.00 10/1/2024 EH 28 21 -30 $ 304.72 $ 330.00 10/1/2024 EH 29 31 -40 $ 366.08 $ 396.00 10/1/2024 EH 30 41 - 50 $ 424.32 $ 459.00 10/1/2024 EH 31 Food handlers certification $ 10.00 $ 11.00 10/1/2024 EH 32 Certification card replacement $ 5.00 $ 6.00 10/1/2024 Plan Review -prior to construction EH 33 New (restaurant) $ 761.28 $ 823.00 10/1/2024 EH 34 Remodel (restaurant) $ 456.56 $ 494.00 10/1/2024 EH I 35 ISchool cafeteria plan review $ 761.28 $ 823.00 10/1/2024 EH 36 Childcare Plan Review $ 303.68 $ 328.00 10/1/2024 EH 37 Childcare Remodel Plan $ 114.40 $ 124.00 10/1/2024 EH 38 Commissary/Base of Operation $ 380.64 $ 412.00 10/1/2024 EH 39 Tourist Facility Plan review $ 304.72 $ 330.00 10/1/2024 EH 40 Non-profit organization plan review $ 380.64 $ 412.00 10/1/2024 Mobile Food Unit (review of mobile unit plan prior to construction) EH 41 Class 1 $ 327.60 $ 354.00 10/1/2024 EH 42 Class II $ 409.76 $ 443.00 10/1/2024 EH 43 Class III $ 570.96 $ 617.00 10/1/2024 EH 44 Class IV $ 606.32 $ 655.00 10/1/2024 Note: A penalty of $150.00 shall be added if payment is 30 days after the license expiration date. An additional penalty of $150.00 shall be added on the first day of each succeeding month of delinquency. Tourist facilities: EH 45 Organizational camp or picnic park $ 205.92 plus fee for each space $ 223.00 10/1/2024 Traveler's accommodation EH 46 1-25 units $ 364.80 $ 394.00 10/1/2024 EH 47 26-50 units $ 445.50 $ 482.00 10/1/2024 EH 48 51-75 units $ 538.50 $ 582.00 10/1/2024 EH 49 76-100 units $ 656.20 $ 709.00 10/1/2024 EH 50 101+units $ 656.20 plus $3.00/unit over100 $ 709.00 10/1/2024 Recreation park $ - 10/1/2024 EH 51 1-25 units $ 393.12 $ 425.00 10/1/2024 EH 52 26-50 units $ 517.92 $ 560.00 10/1/2024 EH 53 51-75units $ 615.68 $ 665.00 10/1/2024 EH 54 76-100 units $ 749.84 $ 810.00 10/1/2024 EH 55 101+ units $ 749.84 plus $2.00/unit over 100 $ 810.00 10/1/2024 Note: Any person initially licensed under ORA 446.310 to 446.350 tor engaging in the recreation park or travelers accommodation business who has failed to renew a license on or before the expiration date is delinquent. If delinquency extends 15 days past the expiration date, a penalty fee of 50% of the annual license fee shall be added. The penalty fee shall be increased by 50% of the license fee on the first day of each succeeding month of delinquency. Swimming Pools: EH 56 License (first public pool, spa, bathhouse) $ 875.68 $ 946.00 10/1/2024 EH 57 Second pool or spa (same location) $ 584.48 $ 632.00 10/1/2024 EH 58 Additional pools or spas (same location) $ 522.08 $ 564.00 10/1/2024 EH 59 Pool plan review fee $ 698.88 $ 755.00 10/1/2024 EH 60 Pool construction inspections $ 698.88 $ 755.00 10/1/2024 EH 61 Surcharges for pools, spas & tourist facilities will be based on the amount set forth by the Oregon Health Division for local govts.. Varies Miscellaneous: EH 62 Children's Service: Foster/Child Care Center Inspection $ 304.72 $ 330.00 10/1/2024 EH 63 Fee for licensed facility that requires +two re -check inspections / year $ 227.76 $ 246.00 10/1/2024 EH 64 Miscellaneous Inspection or Plan Review $ 304.72 $ 330.00 10/1/2024 EH 65 Limited Inspection or Plan Review ACS EH 66 Outdoor Mass Gathering $ 304.72 $ 330.00 10/1/2024 EH 67 Convenience/Handling Fee (On-line renewal of license) Varies 3.4% of transaction amount EH 68 Food Manager Training & Certification $ 125.00 EH 69 Food Manager Training (no book, no exam or missed class) $ 50.00 EH 70 Food Manager Training (paper or online exam only) $ 50.00 EH 71 Food Manager Training (class, exam, no book) $ 100.00 EH 72 Food Manager Training (book & exam):minimum 10 attendees $ 1,250.00 Plus $110.00 per student / over 10 Note: A penalty of $150.00 shall be added if payment is 30 days after the license expiration date. An additional penalty of $150.00 shall be added on the first day of each succeeding month of delinquency. Information Technology E1011120E24 NEW 1 Consultation by IT Staff $ JACS