Loading...
HomeMy WebLinkAboutSurvey 20631LINE TABLE LINE LENGTH DIRECTION L1 50.06' N89'59'13"E L2 49.88' S89'59'46"E L3 75.09' N 89'59'13"E L4 55.07' N89'59'13"E L5 70.09' N89'59'13"E L6 50.06' N89'59'13"E L7 50.06' N89'59'13"E L8 49.53' N89'59'13"E L9 74.82' S89'59'46"E L10 55.27' S89'59'46"E L11 70.34' S89'59'46"E L12 49.88' S89'59'46"E L13 49.88' S89'59'46"E L14 49.88' S89'59'46"E L15 60.00' S00'01'08"W L16 60.00' Soo'00'50"W L17 60.00' S89'5946"E L18 15.00' Soo'01'08"W L19 50.00' S89'57'02"W L20 49.95' S89'57'02"W L21 15.00' S00'02'00"E L22 50.00' S89'57'027W HELD LOCATION, CEDAR FENCE POST LIES AT ACTUAL CORNER BOUNDARY SURVEY LEGEND I I a LOT 4, BLOCK 299 NORTHWEST TOWNSITE CO'S SECOND ADDITION LOCATED IN THE SW 1 /4 OF THE NE 1 /4 OF SECTION • FOUND MONUMENT AS NOTED O SET 5/8" REBAR WITH YELLOW PLASTIC CAP STAMPED "TYE ENGINEERING." UNLESS NOTED OTHERWISE X CALCULATED POSITION 31, TOWNSHIP 17 SOUTH, RANGE 12 EAST, W.M., � C�it.Dl"ES C0U� SURVEYOR CITY OF BEND, D ESCH U TES COUNTY, OR EGON FILED t 0 t tioZi 6Y: r NW KINGSTON AVE. N: 386408.41 EAST 400.16'(R6) E:3287210.64(M) EAST 400.00'(R1) N: 386408.41 " 9 E:3287210.68 N89 58 20 E 400. I f 3/4 IRON 1 18 19 1 PIPE z I I oz o 00 CO J { { con OD : NORTHWEST TOWNSITE SECOND Imo ADDITION, LOTS 1-8, BLOCK 24 bi) v 1 /2" PIPE °% . I I I SCALE. 1 "=50' j 1 17 L21 ALLEY 00 NORTH - - - - - - --- --- - �i CE 15'(R1) 1 N ul 16 13 N OD LO { 00 I 5/8" REBAR, N o 0 0 BROKEN CAP N 00 z �N N NORTHWEST TOWNSITE SECOND I ADDITION, LOTS 9-16, BLOCK 24 LO o z z 5/8" REBAR, { O WITH YPC 13coo. MARKED "LS2257" F-( W N89053'08"E 140.37' O �- N89'59'13"E 250.33' 14 N89'59'13"E 149.64' 0 1 /2" REBAR, NO CAP w J NW JACKSONVILLE AVE. S00.02'08"W 60.00' w I NORTH 60.00 (R3) u7Lo N89'59'13"E 350.43' 20 _j o o - - - 0 o - - -1 12 0 L5 L4 L3 L1 L6 L7 21 0 L8 V) S59-02-51 "E-____._ 28.48' (FROM HELD TO HELD) 28.48' (R2) 0 S89'59'46"E 50.02' 5/8" REBAR WITH BROKEN CAP, PROPERTY OWNER SAYS DE CORNER WAS REMOVED AND HE RESET IT SCALE: 1 "=20' (NOT HELD) N46'25'48"W 0.61' N 58'41'33"W 27.92' (FROM FOUND TO FOUND) -- N58'29'13"W 28.48'(R2) 0 S6T23'09"E 0.24' WEST 70'(R8) WEST 55'(R8) WEST 75'(R8) WEST 5/8" REBAR, N 50'(R1) M NORTHWEST TOWNSITE SECOND NO CAP o NORTHWEST TOWNSITE SECOND zz N � ADDITION, BLOCK 29 O LOT 4 6 , ADDITION, N '- LOTS 1-3, BLOCK I 29 I N00'11'06"E 1.80' FROM CALCULATED POSITION b LOT 8 LOT 7 LOT 6 LOT 5 0 o BLOCK 29, o ,'°o oo 13 C14 I o N NORTHWEST 3 cj z o { (n TOWNSITE to 0o (rnX Iq� CO'SND ow to O N N O O SECO p Z _ -+ N N ADDITION O(n Sri N W (D1) ((n o m w WEST No `� o Z 50'(R1) 0 G WEST 70 (R8) w0 WEST 55 (R8) (AWEST 75 (R8) L11 L10 L9 L2 0 - - -' o 1 O um., 7 o - - - - - S89'S9'46"E 99.87' - S89'59'46"E 240.08' 5 5/8- REBAR �/ WEST 240.10'(R2) WITH YPC MARKED o "TYE ENGINEERING" 50.02' Sri I(3 1 N LOT 3 LOT 2 INN N LOT 1 1r nF 100 �_ � O z (n :- Z 0 V) o L18 O NORTH L12 L13 ALLEY 1 /2" REBAR, NO CAP U23 ' 15'(R1) L14 L17 � WEST 59.99'(R2) EAST 60.09'(R3) WEST 50.00'(Ri) SEE DETAIL 3 � WEST 50.02'(R2) I FOUND 3/4 PIPE LO N MOVED 0.6 SOUTHWEST 00' FROM 2006 SURVEY (R2) NORTHWEST TOWNSITE SECOND o (NOT HELD) ADDITION, LOTS 9-16, BLOCK 29 in ST 50.02'(R2)WEST 50.02'(R2)WEST 50.02'(R2) WEST 50'(R1) WEST 50'(R1) WEST 50'(R1) O L19 �� 5/8" REBAR, - 0 L22 L20 Q o BROKEN CAP 5/8" REBAR, NW ITHICA AVE. WITH YPC MARKED "TYE ENGINEERING" 5/8" REBAR, NO CAP N: 385957.71 E: 3287210.54(M) N: 385957.72 E: 3287210.44(R7) (R1) NORTHWEST TOWNSITE SECOND ADDITION, BY ROBERT GOULD, PLS 00632, RECORDED 11 /06/1912, CS08508 (R2) NORTHWEST TOWNSITE SECOND ADDITION BLOCK 29 LOTS 10 & 11 , BY LINDA L. MILLER, PLS 02513, FILED 7/19/2006, CS16965 (R3) NORTHWEST TOWNSITE SECOND ADDITION BLOCK 29 LOTS 14 & 15, BY RAYMOND E. OMAN, PLS 00702, FILED 10/9/1990, CS08541 (R4) NORTHWEST TOWNSITE SECOND ADDITION BLOCK 24 LOT 14, BY RUSSEL M. KARL, PLS 02257, FILED 10/25/1992, CS11272 (R5) NORTHWEST TOWNSITE SECOND ADDITION BLOCK 24 LOTS 9 & 10, BY RAYMOND E. OMAN, PLS 00702, FILED 7/26/1990, CS02960 (R6) NORTHWEST TOWNSITE SECOND ADDITION BLOCK 24 LOTS 3 & 4, BY DAVID A. CLONINGER, PLS 79343, FILED 11 /10/2015, CS18985 (R7) PROPERTY MONUMENT RECOVERY SURVEY 14TH STREET RECONSTRUCTION PHASE 1, BY JAMES E. SWENSON, PLS 02596, FILED 10/11 /2018, CS19772 (R8) NORTHWEST TOWNSITE SECOND ADDITION BLOCK 29 LOTS 5-8 , BY JOHN H. EATON, PLS 00252, FILED 9/24/1976, CS08539 (D1) DEED 2014-39791 ® LOCATION NUMBERS (M) MEASURED SURVEYOR'S NARRATIVE: THE PURPOSE OF THIS SURVEY IS TO SET ALL CORNERS FOR LOT 4, BLOCK 29 OF NORTHWEST TOWNSITE CO'S SECOND ADDITION (R1). MOST LOT CORNERS WERE MISSING FOR BLOCK 29. WE CALCULATED THE SW CORNER OF BLOCK 29 SHOWN AS LOCATION 4 BY EXTENDING THE LINE FROM LOCATION 1, 2 AND 3 50.00 FEET PER (R1). FOR THE WEST LINE OF BLOCK 29 WE USED LOCATION 4 TO LOCATION 13. FOR THE NORTH RIGHT OF WAY LINE OF JACKSONVILLE AVENUE, WE HELD LOCATION 13 TO LOCATION 15. THIS LINE WAS OFFSET 60.00 FEET TO THE SOUTH TO ESTABLISH THE NORTH LINE OF BLOCK 29. FOR THE EAST LINE OF BLOCK 29, WE HELD A LINE BETWEEN LOCATION 9 AND LOCATION 19. LOCATION 19 WAS FOUND IN R6 AND R7 BUT WAS RECENTLY DESTROYED. WE HELD THE LOCATION 19 AS PER R7 USING COCS (SEE BASIS OF BEARING NOTE HEREON). WE CHECKED COORDINATES AT LOCATION 9 AGAINST R7 FOR ACCURACY AND CONSISTENCY AND WE HAD GOOD RESULTS. WE HELD LOCATION 21 FOR EAST -WEST FOR LOT 1 AND LOT 2 OF BLOCK 29 BUT DID NOT HOLD FOR THE NORTH LINE AS IT WAS 1.80 FEET NORTH OF THE RIGHT OF WAY LINE. FOR THE NW AND NE CORNER OF LOT 4, BLOCK 29 WE PROPORTIONED FROM THE CALCULATED NORTHERLY CORNER COMMON TO LOTS 1 AND TO LOCATION 12. FOR THE SOUTH LINE OF THE ALLEYWAY ON BLOCK 29 WE HELD LOCATION 6, 8, AND 9. WE WERE TOLD BY THE PROPERTY OWNER OF LOT 12 , BLOCK 29 THE MONUMENT AT LOCATION 7 HAD BEEN REMOVED AND THEN RE -SET BY THEM DURING A LANDSCAPING PROJECT. AS A RESULT THIS MONUMENT WAS NOT TRUSTED. WE OFFSET THE SOUTH LINE OF THE ALLEYWAY THE RECORD 15.00 FEET (R1) TO DETERMINE THE NORTH LINE OF THE ALLEYWAY OF BLOCK 29. IN (R2) LINDA MILLER FINDS A PIPE WITH A TIE OF 28.48 FEET WHICH WE SHOW AT LOCATION 10. WE FOUND THIS MONUMENT LOOSE AND DISTURBED AND A FENCE POST NOW OCCUPIES THIS LOCATION. WE HELD AT THE CALCULATED LOCATION AS PER (R2) AS THE BEST AVAILABLE EVIDENCE OF THIS CORNER'S LOCATION PRIOR TO THE FENCE CONSTRUCTION. WE PROPORTIONED THE SOUTH LINE FROM A CALCULATED POSITION OF LOCATION 10 TO LOCATION 23, OF SAID BLOCK 29. ASIS OF BEARINGS AN BASIS OF BEARINGS AND CONTROL FOR THIS SURVEY IS THE CENTRAL OREGON COORDINATE SYSTEM (COCS). CPS CALIBRATIONS WERE MADE FROM THE ORGN BASE STATIONS (INCLUDING BNDM, REDM, LAPN, P387 SISTERS, PNVL, AND MDRS) WITH SPECTRA PRECISION SP-80 CPS. THE CALIBRATION TIES MULTIPLE COCS POINTS USING PUBLISHED COORDINATES. THE COCS HORIZONTAL DATUM IS NAD83 (91) AND USES A MOLODENKSY TRANSFORMATION. THE COCS VERTICAL DATUM IS NGVD 29 tag RENEWS: 12/31 /21 9910631- 2724 - Jacksonville Boundary-6-18-2021.dwg