Loading...
HomeMy WebLinkAboutSurvey 20991RECORD OF SURVEY -RESTORATION OF MONUMENTATION CITY OF REDMOND NE HEMLOCK AVENUE IMPROVEMENT PROJECT - HWY 97 TO NE 9TH STREET LOCATED IN THE SOUTHWEST QUARTER AND THE NORTHWEST QUARTER OF SECTION 10, TOWNSHIP 15 SOUTH, RANGE 13 EAST, W.M., CITY OF REDMOND, DESCHUTES COUNTY, OREGON DETAI L NII053'440E 122.08' N58012'27"W 47.12' W Z NE HEMLOCK AVENUE V S71036'15"E 64.24' S52°59'45"W 49.99' I CENTER I/4 CORNER B A N O °Q N co N U N Z __j O F-- of � Qcl- NO RECORD REFERENCES WERE FOUND EXISTING MONUMENT FOUND AS PER MONUMENT TABLE TAX LOT 151310BO 600 DESCHUTES COUtMl SURVEYOR FILED! Z/ Z074-Z- Y; C n I If PROJECT OFFSET FOUND MONUMENT DESCHUTES FOUND MONUMENT REPLACED WITH STATION FROM LINE COUNTY B - Z - SURVEY A 1+98.20 29.96 1/2" ID IRON PIPE WITH YPC STAMPED "POVEY & ASSOC., 0.2' BELOW GROUND 18381 B 2+00.64 0 3/4" ID IRON PIPE WITH YPC ILLEGIBLE STAMP, FLUSH WITH ASPHALT CONCRETE 18381 C 2+39.45 30.07 1/2" ID IRON PIPE WITH YPC STAMPED "POVEY & ASSOC., 0.4' BELOW GROUND 18381 D 6+35.37 30.01 1/2" ID IRON PIPE WITH YPC STAMPED "POVEY & ASSOC., 0.4' BELOW GROUND 18381 SET 5/8" REBAR WITH YPC STAMPED "K&E EXC INC LS 2596" E 7+67.56 30.16 1/2" ID IRON PIPE WITH YPC STAMPED "POVEY & ASSOC., FLUSH WITH GROUND 18381 F 10+31.38 30.07 5/8" REBAR WITH YPC STAMPED "DEA INC", 0.2' BELOW GROUND 15706 G 10+31.48 -24.86 5/8" REBAR WITH YPC STAMPED "HWA", 0.2' BELOW GROUND 16967 SET BERNTSEN 15/32" BP COPPER MARKER STAMPED "K&E EXC LS 2596" H 10+61.37 -24.86 5/8" REBAR WITH YPC ILLEGIBLE STAMP, FLUSH WITH ASPHALT CONCRETE 16967 SET 5/8" REBAR WITH 2" ALU. CAP STAMPED "K&E EXC INC LS 2596" GROUTED IN ASPHALT 1 11+06.00 -29.93 5/8" REBAR WITH YPC STAMPED "HWA", 0.4' BELOW GROUND 16967 K 12+18.35 30.06 5/8" REBAR WITH OPC STAMPED "BECON", 0.5' BELOW GROUND 15034 SET 5/8" REBAR WITH YPC STAMPED "K&E EXC INC LS 2596" 1 12+18.50 40.13 5/8" REBAR WITH YPC STAMPED "DEA INC", FLUSH WITH GROUND 20842 L 16+76.70 -29.93 5/8" REBAR WITH YPC STAMPED "HWA", 0.3' BELOW GROUND 16967 M 17+21.38 -24.98 5/8" REBAR WITH YPC ILLEGIBLE STAMP, FLUSH WITH ASPHALT CONCRETE 16967 SET 5/8" REBAR WITH 2" ALU. CAP STAMPED "K&E EXC INC LS 2596" GROUTED IN ASPHALT 2 17+28.02 40.13 5/8" REBAR WITH OPC STAMPED "BECON", 0.5' BELOW GROUND 20842 P 17+51.37 -44.63 5/8" REBAR WITH YPC STAMPED "HWA", 0.4' BELOW GROUND 16967 Q 17+66.02 -29.96 5/8" REBAR WITH YPC STAMPED "HWA", 0.2' BELOW GROUND 16967 3 18+78.27 40.07 5/8" REBAR WITH OPC STAMPED "BECON", 0.1' ABOVE GROUND 20842 R 20+43.36 -29.98 5/8" REBAR WITH YPC STAMPED "HWA", 0.4' BELOW GROUND 16967 S 20+93.26 30.11 5/8" REBAR, 0.5' BELOW GROUND 15034 SET 5/8" REBAR WITH YPC STAMPED "K&E EXC INC LS 2596" T 22+91.25 -29.92 5/8" REBAR WITH YPC STAMPED "HWA", 0.2' BELOW GROUND 16967 V 23+13.44 29.99 5/8" REBAR WITH YPC STAMPED "DEA INC", 0.1' ABOVE GROUND 15034 SET BERNTSEN 15/32" BP COPPER MARKER STAMPED "K&E EXC LS 2596" W 23+13.43 -24.92 5/8" REBAR WITH YPC ILLEGIBLE STAMP, FLUSH WITH ASPHALT CONCRETE 16967 SET 5/8" REBAR WITH YPC STAMPED "K&E EXC INC LS 2596" GROUTED IN ASPHALT X 23+13.44 -52.05 5/8" REBAR WITH YPC STAMPED "HWA", 0.9' BELOW GROUND 16967 Z 23+53.43 0 3/4" ID IRON PIPE, 0.3' BELOW ASPHALT CONCRETE OCRR 1740 SET 5/8" REBAR WITH YPC STAMPED "K&E EXC INC LS 2596" INSIDE SET MONUMENT BOX o G • _NE HEMLOCK AVENUE _ _ _ _ _ _ _ _ _ 0 �C C D E F 0 O m O O U p p N N O O O 1+) p M p M N coN� cm O V U CO UO Q N Q c p O �-- pi M ___I U J U O �N cl- - t17 H F- O_ W O_ W X O OJ OJ F-- � I--- � J x x � o= n x Q a � `r. V � 1 Is V N00°00'00"E 00.00' MEASURED DATA (N00°00'00"E 00.00') RECORD DATA AS PER PARTITION PLAT 2012-7, BY WILLIAM G. BAHRKE, DESCHUTES COUNTY SURVEY 18381 O FOUND MONUMENT AS PER NOTED DESCHUTES COUNTY SURVEY • RESET FOUND MONUMENT AS NOTED IN TABLE 0 SET PK NAIL IN TOP OF CURB, WITH 1 112" ALUMINUM WASHER, STAMPED 'K&E EXC INC LS 2596' ALU ALUMINUM CS DESCHUTES COUNTY SURVEY OCRR OREGON CORNER RESTORATION RECORD OPC ORANGE PLASTIC CAP YPC YELLOW PLASTIC CAP w w ix I- cn w z 60' H 60' W W cn 2 F- W z SURVEYOR'S NARRATIVE f PIONEER BUSINESS PARK PHASE I LOT I CS 16967 1 i TAX LOT 15131OBDOOI 90000 I PIONEER BUSINESS PARK PHASE I LOT 7 CS 16967 BASIS OF BEARINGS PARTITION PLAT 2012-7 CS 18381 „ o N89052'028E 2152.79' (N89052'02'E 2152.82') W W I- cn PC W z 60' P M m N SCALE I'=100' OCTOBER II, 2022 0 100 200 NE HEMLOCK AVENUE _ o 0 S V 1 2 3 O 1 O O O a0 O cV .p to try .O L M O �TCnO N N i CMO NO-� No�j !2 p V Q O O O O Q I O O U O p U U N CL N (V N U N Nof QW N7 a J amp a! co!Q --� p Ih I a n- p a p i+� (if to 3 N V () I Z Q Z O tl7 tf� Z�!- ZaCn ZQcn OZQ(n� I OZZU O >cm OHO C> O�U F--O�V O 11-00 1-00 O i-OJ F_ ~ m� X I �t--� �Hm X ofa� �Q fa- I �Q� �QC �I Cl- ck- O ! THE PURPOSE OF THIS SURVEY IS TO REPLACE MONUMENTS THAT WERE DISTURBED BY THE CONSTRUCTION OF THE CITY OF REDMOND PROJECT ONE HEMLOCK AVENUE IMPROVEMENT PROJECT - HWY 97 TO 9TH STREET', IN ACCORDANCE WITH ORS 209.150. ORIGINAL OWNER SUPPLIED CONTROL WAS CHECKED AND USED TO SURVEY EXISTING MONUMENTATION, ALONG WITH SURVEYING ADDITIONAL CONTROL POINTS THAT WOULD NOT BE DISTURBED DURING CONSTRUCTION. AFTER CONSTRUCTION, NEW MONUMENTS WERE SET IN THE PRE -CONSTRUCTION SURVEYED MONUMENT POSITION. THE NEW MONUMENT REPLACING MONUMENT 71, THE CENTER 1/4 CORNER OF SECTION 10, WAS SET INSIDE A NEWLY INSTALLED MONUMENT CASE. THE MONUMENT WAS REFERENCED IN ACCORDANCE WITH ORS 209.130(2). THIS SURVEY DOES NOT AUTHENTICATE, NOR DISPUTE ANY RECORDED DESCHUTES COUNTY SURVEYS. THE PURPOSE OF THIS SURVEY IS TO PRESERVE PREVIOUSLY SET SURVEY MONUMENTS. OREGON JANUARY 19, 1993 JAMES E. SWENSON 2596 RENEWS JUNE 30, 2024 300 W Lu cn w z 80, X SEE W DETAIL Z CENTER 1/4 CORNER r 40' 130' W W cn 2 1- O. W z K&E EXCAVATING INCORPORATED 3871 LANGLEY ST. SE SALEM, OR 97317 503-399-4833 KEEX. NET c$ 20991 `r. V � 1 Is V N00°00'00"E 00.00' MEASURED DATA (N00°00'00"E 00.00') RECORD DATA AS PER PARTITION PLAT 2012-7, BY WILLIAM G. BAHRKE, DESCHUTES COUNTY SURVEY 18381 O FOUND MONUMENT AS PER NOTED DESCHUTES COUNTY SURVEY • RESET FOUND MONUMENT AS NOTED IN TABLE 0 SET PK NAIL IN TOP OF CURB, WITH 1 112" ALUMINUM WASHER, STAMPED 'K&E EXC INC LS 2596' ALU ALUMINUM CS DESCHUTES COUNTY SURVEY OCRR OREGON CORNER RESTORATION RECORD OPC ORANGE PLASTIC CAP YPC YELLOW PLASTIC CAP w w ix I- cn w z 60' H 60' W W cn 2 F- W z SURVEYOR'S NARRATIVE f PIONEER BUSINESS PARK PHASE I LOT I CS 16967 1 i TAX LOT 15131OBDOOI 90000 I PIONEER BUSINESS PARK PHASE I LOT 7 CS 16967 BASIS OF BEARINGS PARTITION PLAT 2012-7 CS 18381 „ o N89052'028E 2152.79' (N89052'02'E 2152.82') W W I- cn PC W z 60' P M m N SCALE I'=100' OCTOBER II, 2022 0 100 200 NE HEMLOCK AVENUE _ o 0 S V 1 2 3 O 1 O O O a0 O cV .p to try .O L M O �TCnO N N i CMO NO-� No�j !2 p V Q O O O O Q I O O U O p U U N CL N (V N U N Nof QW N7 a J amp a! co!Q --� p Ih I a n- p a p i+� (if to 3 N V () I Z Q Z O tl7 tf� Z�!- ZaCn ZQcn OZQ(n� I OZZU O >cm OHO C> O�U F--O�V O 11-00 1-00 O i-OJ F_ ~ m� X I �t--� �Hm X ofa� �Q fa- I �Q� �QC �I Cl- ck- O ! THE PURPOSE OF THIS SURVEY IS TO REPLACE MONUMENTS THAT WERE DISTURBED BY THE CONSTRUCTION OF THE CITY OF REDMOND PROJECT ONE HEMLOCK AVENUE IMPROVEMENT PROJECT - HWY 97 TO 9TH STREET', IN ACCORDANCE WITH ORS 209.150. ORIGINAL OWNER SUPPLIED CONTROL WAS CHECKED AND USED TO SURVEY EXISTING MONUMENTATION, ALONG WITH SURVEYING ADDITIONAL CONTROL POINTS THAT WOULD NOT BE DISTURBED DURING CONSTRUCTION. AFTER CONSTRUCTION, NEW MONUMENTS WERE SET IN THE PRE -CONSTRUCTION SURVEYED MONUMENT POSITION. THE NEW MONUMENT REPLACING MONUMENT 71, THE CENTER 1/4 CORNER OF SECTION 10, WAS SET INSIDE A NEWLY INSTALLED MONUMENT CASE. THE MONUMENT WAS REFERENCED IN ACCORDANCE WITH ORS 209.130(2). THIS SURVEY DOES NOT AUTHENTICATE, NOR DISPUTE ANY RECORDED DESCHUTES COUNTY SURVEYS. THE PURPOSE OF THIS SURVEY IS TO PRESERVE PREVIOUSLY SET SURVEY MONUMENTS. OREGON JANUARY 19, 1993 JAMES E. SWENSON 2596 RENEWS JUNE 30, 2024 300 W Lu cn w z 80, X SEE W DETAIL Z CENTER 1/4 CORNER r 40' 130' W W cn 2 1- O. W z K&E EXCAVATING INCORPORATED 3871 LANGLEY ST. SE SALEM, OR 97317 503-399-4833 KEEX. NET c$ 20991 w w ix I- cn w z 60' H 60' W W cn 2 F- W z SURVEYOR'S NARRATIVE f PIONEER BUSINESS PARK PHASE I LOT I CS 16967 1 i TAX LOT 15131OBDOOI 90000 I PIONEER BUSINESS PARK PHASE I LOT 7 CS 16967 BASIS OF BEARINGS PARTITION PLAT 2012-7 CS 18381 „ o N89052'028E 2152.79' (N89052'02'E 2152.82') W W I- cn PC W z 60' P M m N SCALE I'=100' OCTOBER II, 2022 0 100 200 NE HEMLOCK AVENUE _ o 0 S V 1 2 3 O 1 O O O a0 O cV .p to try .O L M O �TCnO N N i CMO NO-� No�j !2 p V Q O O O O Q I O O U O p U U N CL N (V N U N Nof QW N7 a J amp a! co!Q --� p Ih I a n- p a p i+� (if to 3 N V () I Z Q Z O tl7 tf� Z�!- ZaCn ZQcn OZQ(n� I OZZU O >cm OHO C> O�U F--O�V O 11-00 1-00 O i-OJ F_ ~ m� X I �t--� �Hm X ofa� �Q fa- I �Q� �QC �I Cl- ck- O ! THE PURPOSE OF THIS SURVEY IS TO REPLACE MONUMENTS THAT WERE DISTURBED BY THE CONSTRUCTION OF THE CITY OF REDMOND PROJECT ONE HEMLOCK AVENUE IMPROVEMENT PROJECT - HWY 97 TO 9TH STREET', IN ACCORDANCE WITH ORS 209.150. ORIGINAL OWNER SUPPLIED CONTROL WAS CHECKED AND USED TO SURVEY EXISTING MONUMENTATION, ALONG WITH SURVEYING ADDITIONAL CONTROL POINTS THAT WOULD NOT BE DISTURBED DURING CONSTRUCTION. AFTER CONSTRUCTION, NEW MONUMENTS WERE SET IN THE PRE -CONSTRUCTION SURVEYED MONUMENT POSITION. THE NEW MONUMENT REPLACING MONUMENT 71, THE CENTER 1/4 CORNER OF SECTION 10, WAS SET INSIDE A NEWLY INSTALLED MONUMENT CASE. THE MONUMENT WAS REFERENCED IN ACCORDANCE WITH ORS 209.130(2). THIS SURVEY DOES NOT AUTHENTICATE, NOR DISPUTE ANY RECORDED DESCHUTES COUNTY SURVEYS. THE PURPOSE OF THIS SURVEY IS TO PRESERVE PREVIOUSLY SET SURVEY MONUMENTS. OREGON JANUARY 19, 1993 JAMES E. SWENSON 2596 RENEWS JUNE 30, 2024 300 W Lu cn w z 80, X SEE W DETAIL Z CENTER 1/4 CORNER r 40' 130' W W cn 2 1- O. W z K&E EXCAVATING INCORPORATED 3871 LANGLEY ST. SE SALEM, OR 97317 503-399-4833 KEEX. NET c$ 20991 THE PURPOSE OF THIS SURVEY IS TO REPLACE MONUMENTS THAT WERE DISTURBED BY THE CONSTRUCTION OF THE CITY OF REDMOND PROJECT ONE HEMLOCK AVENUE IMPROVEMENT PROJECT - HWY 97 TO 9TH STREET', IN ACCORDANCE WITH ORS 209.150. ORIGINAL OWNER SUPPLIED CONTROL WAS CHECKED AND USED TO SURVEY EXISTING MONUMENTATION, ALONG WITH SURVEYING ADDITIONAL CONTROL POINTS THAT WOULD NOT BE DISTURBED DURING CONSTRUCTION. AFTER CONSTRUCTION, NEW MONUMENTS WERE SET IN THE PRE -CONSTRUCTION SURVEYED MONUMENT POSITION. THE NEW MONUMENT REPLACING MONUMENT 71, THE CENTER 1/4 CORNER OF SECTION 10, WAS SET INSIDE A NEWLY INSTALLED MONUMENT CASE. THE MONUMENT WAS REFERENCED IN ACCORDANCE WITH ORS 209.130(2). THIS SURVEY DOES NOT AUTHENTICATE, NOR DISPUTE ANY RECORDED DESCHUTES COUNTY SURVEYS. THE PURPOSE OF THIS SURVEY IS TO PRESERVE PREVIOUSLY SET SURVEY MONUMENTS. OREGON JANUARY 19, 1993 JAMES E. SWENSON 2596 RENEWS JUNE 30, 2024 300 W Lu cn w z 80, X SEE W DETAIL Z CENTER 1/4 CORNER r 40' 130' W W cn 2 1- O. W z K&E EXCAVATING INCORPORATED 3871 LANGLEY ST. SE SALEM, OR 97317 503-399-4833 KEEX. NET c$ 20991