Loading...
HomeMy WebLinkAboutSurvey 21075r-- r i'tP���j ./ ` 't EXISTING COMMON �0� •0/ , 20' STORM " ' WATER EASEMENT TRACT ' ' i --- 1 10.00' N65'37'48"E 10.02'(M) 10.00'y N65 g') 06 ` 1 OLD LINE / S6 / NEW LINE 1 � 253 j ti 1 z o I, 254 20,183 SF BEFORE , ' C N 2 0 22,380 SF AFTER �DOCUMENT NO. 2023-09544 � \o N ' \ � 1 o 0 l\ 252 ` 20,183 SF BEFORE N� 17,986 SF AFTER DOCUMENT NO. 1 l 2023-09543 1 1 251 OLD LINE ' NEW LINE ' 10.00 \ L=10.00' • G2 RECORD OF SURVEY PROPERTY LINE ADJUSTMENT PLANNING FILE NUMBER 247-23-000075-LL LOTS 252 AND 253, TETHEROW PHASE 5 IN THE SOUTHEAST ONE -QUARTER OF SECTION 2, TOWNSHIP 18 SOUTH, RANGE 11 EAST, WILLAMETTE MERIDIAN, DESCHUTES COUNTY, OREGON APRIL 2023 DESC14UTES COUNTY SURVEY f3R 1 os o3 zoz3 BY: CooS SURVEYOR'S NARRATIVE: THE PURPOSE OF THIS SURVEY WAS TO DETERMINE AND MONUMENT A PROPERTY LINE ADJUSTMENT BETWEEN LOTS 252 AND 253, TETHEROW PHASE 5, PER DESCHUTES COUNTY PLANNING FILE NUMBER 247-23-000075-LL, AND PER MY CLIENT'S DIRECTION. THE BASIS OF BEARINGS FOR THIS SURVEY IS A LINE BETWEEN RECORD MONUMENTS ON THE EASTERLY LINE OF LOT 253, WITH THE BEARING TAKEN FROM THE PLAT OF TETHEROW PHASE 5. MONUMENTS FOUND AT LOT CORNERS FIT PLAT AND/OR POST-MONUMENTATION POSITIONS, AND WERE HELD FOR THE BOUNDARIES OF THE SUBJECT LOTS, WITH THE ADJUSTED LINE MONUMENTED AS SHOWN. MONUMENTS FOUND AND SET DURING THE COURSE OF THIS SURVEY ARE AS SHOWN ON THE SUBJOINED SURVEY MAP. EASEMENT NOTE: EXISTING EASEMENTS PER PLAT OF TETHEROW PHASE 5 SHOWN. A COMPLETE AND CURRENT TITLE SEARCH MAY DISCLOSE ADDITIONAL EASEMENTS NOT SHOWN HEREON. SURVEYOR'S CERTIFICATE: I, DANIEL T. BURTON, REGISTERED PROFESSIONAL LAND SURVEYOR NO. 2248 IN THE STATE OF OREGON, DO HEREBY CERTIFY THAT I OR THOSE UNDER MY DIRECT SUPERVISION HAVE MADE A SURVEY OF THE LANDS SHOWN ON THIS PLAT OF SURVEY AND FURTHER CERTIFY THAT SAID LANDS WERE CORRECTLY SURVEYED ACCORDING TO STATE STATUTES AND THE RULES OF COMMON LAW. \ EXISTING / 5' P U E Curve Table \ LEGEND �l Curve Radius Length Chord Bearing Delta .%6�•%PI�MI • = FOUND AND HELD 5/8" IRON ROD WITH C1(M)(P) 575.00 77.50 77.44 S65'3725"W 7'43'21" C /�-� jj25' YELLOW CAP MARKED SCE&S � � � � G � C2(M)(P) 575.00 77.50 77.44 S73• " PER TETHEROW PHASE 5 20 46 W 7 43 21 / POST—MONUMENTATION AFFIDAVIT C3(M) 575.00 67.50 67.44 S65.07 34 W 6'43 37 a O = SET 5%8 x 30 IRON ROD WITH \ C4(M) 575.00 87.50 87.42 S72'50'57"W 8'43'05" / / YELLOW CAP MARKED "SCE&S" / �}► (P) = PLAT OF TETHEROW PHASE 5 BY DANIEL E. WOBBE ON 6 03 2008 AS CS17739 / (M) = MEASURED G PREPARED BY: SUN COUNTRY ENGINEERING & SURVEYING, INC., 920 SE ARMOUR RD BEND, OR 97702 (541) 382-8882 CLIENT: ARROWOOD DEV. W.O. # 7908—PLA-252-253 REGISTERED PROFESSIONAL LAND SURVEYOR RENEWS 12/31 /23 SCALE:1 "=20' 20 0 20 PLATE ONE OF ONE R� 0 C" CS 21075-