HomeMy WebLinkAboutSurvey 21140/
-j, i-�e 0 P
rit/SIrmmmpft
Y
TY
NI'-
PROPERTY LINE ADJUSTMENT FOR CONSOLIDATION AMONG LOTS 1, 2, 3 AND 4 OF LINDSAY INDUSTRIAL PARK
LOCATED IN THE SOUTHEAST 1/4 OF THE NORTHEAST 1/4 OF SECTION 21, TOWNSHIP 15 SOUTH, RANGE 13 EAST,
WILLAMETTE MERIDIAN, CITY OF REDMOND, DESCHUTES COUNTY, OREGON.
CITY OF REDMOND PLANNING FILE NUMBER 711-23-000007-PLNG (LLC)
245.74' [& 11
LINDSAY INDUSTRIAL PARK
LOT 5
96
® ®, ff
� S10 01 06 W
.1
z 21.15' [& 11
w �
w
u
LOT 4 LOT 3
BEFORE: �' z BEFORE:
c� bi
44,541 SF 45,718 SF 2
W AFTER:, i AFTER �-
a_ 0 SF 0 SF C14
v
® w
Q a O U)
U V) ry
u a_
FOUND 5/8"
IRON ROD
SET IN [2]
i� z' / •1
N89°54'06"E 245.56' [& 1]
i— z PROPERTY LINE TO BE ELIMINATED N
Ld
L j , 20.00' [& 11 ® �
® — N89054'06"E 450.60' [& 1] Z
20.00' [& 11 i PROPERTY LINE TO BE ELIMINATED
C0 0 S89'54'06"W 245.53' [& 1 ]
u
w �
< n c"J
z
= w
� w c0 N
(.0 LOT 1 I® LOT 2 04 0
® BEFORE: 0 BEFORE:
N 50,957 SF I z 51,575 SF
AFTER n J AFTER:
192,791 SF 0 SF
® FOUND BENT 5/8" IRON
ROD WITH YELLOW PLASTIC
CAP INSCRIBED
"TERRASCOPE", SET IN [2]
I
3 ®' SALMON AVE l(ROW VACATED)
245.34' [& 1 ] 204.5' [& 1 ] —1•
S89®54'06" ' 450, 29' [& 1 ]
BASIS OF BEARINGS
F—
U
Q
Q
w m* I m al 11 limm UT I
THE PURPOSE OF THIS SURVEY WAS TO LOCATE THE CONSOLIDATED
BOUNDARY OF LOTS 1, 2, 3, AND 4 OF LINDSAY INDUSTRIAL PARK, LOCATED
IN THE SOUTHEAST 1/4 OF THE NORTHEAST 1/4 OF SECTION 21, TOWNSHIP
15 SOUTH, RANGE 13 EAST, WILLAMETTE MERIDIAN, CITY OF REDMOND,
DESCHUTES COUNTY, OREGON, PER CITY OF REDMOND PLANNING FILE
NUMBER711-23-000007—PLNG (LLC).
THE BOUNDARIES OF THE LOTS WERE DETERMINED BY HOLDING FOUND
MONUMENTS AS SHOWN.
THE DEED FOR THE CONSOLIDATION WAS RECORDED AS INSTRUMENT NUMBER
2023-18795 DESCHUTES COUNTY OFFICIAL RECORDS.
0 MONUMENT FOUND, 5/8" x 30" IRON ROD WITH ORANGE PLASTIC
CAP INSCRIBED "BECON", SET IN [1]
MONUMENT FOUND, AS DESCRIBED
MONUMENT FOUND 5/8" x 30" IRON ROD WITH 2" ALUMINUM CAP
INSCRIBED "BECON", SET IN [1 ]
[#] SURVEY RECORD INFORMATION
BOUNDARY LINE
ADJACENT BOUNDARIES
— ABANDONED PROPERTY LINE
a
BASIS Of BEARINGS
J
Q
THE BASIS OF BEARINGS FOR THIS SURVEY IS THE SOUTH LINE OF LOTS 1
AND 2, BEING S89"54'06"W PER [1 ] AND [2].
[1 ] CS 20670 LINDSAY INDUSTRIAL PARK BY ERIK J. HUFFMAN,
FILED NOVEMBER 29, 2021, DESCHUTES COUNTY SURVEY RECORDS
[2] CS 12738 MURPHY INDUSTRIAL TRACTS PHASE 1 BY JOEL G. SMITH,
FILED OCTOBER 22, 1996, DESCHUTES COUNTY SURVEY RECORDS
lDES"'-"`"JTES COUNTY GUAW!YO
zz Z33yewc'o
CIVIL ENGINEErZING
JOB NO.: 22013
CLIENT: SHAWN McCLOUD
DATE: 8/08/2022
DRAWN BY: GR
549 SW N1 ILL VIEW WAY
SUITE 100
BEND, OREGON 97702
(5 +1) 633-31 40
www.beconeng.com
REGISTERED
PROFESSIONAL
LAND SURVEYOR
`0RECkN
DEC. 16, 2009
ERIK J. HUFFMAN
70814
RENEWS: JUNE 30, 2025
SHEET 1 0f 1