HomeMy WebLinkAboutSurvey 21182LOT 1 I LOT 2 I LOT 2 I LOT 3 I LOT 4
LOT 16
LOT 5
FOUND 5/8" IRON
ROD WITH BROKEN
YELLOW PLASTIC
CAP PER (R2)
LOT 15 LOT 6
2c� SET A BRASS NAIL AND WASHER
G� STAMPED "TYE ENG" IN
CONCRETE DRIVEWAY
1 EAST 120' (R1)
N 89'50' 14" E 120.09'
LOT 14
LOT 13
FOUND
1 /2"
OPEN IRON PIPE
„ .-. PER (R1)
0
LOT 7
�
� o
Lo
rn
0
EAST 120' (R1)
a N
N89'54'13"E 120.15'
_ o
ACTUAL PROPERTY CORNER
w 0
FALLS WITHIN AN UNSTABLE FILL
z o
.-. w ..
AREA, A 5/8" IRON ROD WITH
0
z
� M
ap�a�
YELLOW PLASTIC CAP STAMPED
pp CO
"TYE ENGINEERING" WAS SET AS
A WITNESS CORNER N00'03'02"E
o 0 of
2.00' FROM ACTUAL PROPERTY
`n z -t
CORNER
o
0
0 0
0
LOT 8
0
0
o LO
0
FOUND 1 /2"
LOT 12 OPEN IRON PIPE
PER (R1)
LOT 9 o0
LO
o
LO
LOT 12
LOT 11
LOT 10
FOUND 3/4" BOLT WITH
ROUND HEAD (R1)
GEORGI A AVENUE
30.00'
9
0
0
� o
L�
o�
0 z
0
I
I
I
30.00'
I
PARK PLACE
SCALE: 1 "=30'
RECORD OF SURVEY
EIRE INDUSTRIES, LLC
LOT 79 BLOCK 29, PARK ADDITION TO BEND,
LOCATED IN THEW 1 /2 SE 1 /4 OF SECTION 32,
TOWNSHIP 17 SOUTH, RANGE 12 EAST, W.M.,
CITY OF BEND, DESCHUTES COUNTY, OREGON
SURVEYORS NARRATIVE. -
THE PURPOSE OF THIS SURVEY IS TO ESTABLISH AND MONUMENT THE
PROPERTY CORNERS FOR LOT 7, BLOCK 29, PARK ADDTION TO BEND.
WE ESTABLISHED THE SOUTHWEST CORNER OF LOT 7 BY SINGLE PROPORATION
BETWEEN THE FOUND 1 /2" IRON PIPES AT THE NW CORNER OF LOT 7 AND
AT THE SW CORNER OF LOT 8.
WE ESTABLISHED THE NE AND SE CORNERS BY SINGLE PROPORTION FROM THE
FOUND 5/8" IRON ROD AT THE NE CORNER OF LOT 5 AND THE 3/4" BOLT
AT THE SE CORNER OF LOT 10.
BASIS OF BEARINGS AND CONTROL FOR THIS SURVEY IS THE CENTRAL
OREGON COORDINATE SYSTEM (COCS). GPS CALIBRATIONS WERE MADE FROM
THE ORGN BASE STATIONS (INCLUDING BNDM, REDM, LAPN, P387 SISTERS,
PNVL, AND MDRS) WITH SP80 SPECTRA PRECISION GPS. THE CALIBRATION TIES
MULTIPLE COCS POINTS USING PUBLISHED COORDINATES. THE DESCHUTES 13
TRANSFORMATION USES A MOLODENKSY TRANSFORMATION. THE COCS
VERTICAL DATUM IS NGVD 29.
RENEWS: 12/31 /23
LEGEND
• FOUND MONUMENT AS NOTED
0 SET 5/8" IRON ROD WITH YELLOW PLASTIC CAP
STAMPED "TYE ENGINEERING" UNLESS NOTED
OTHERWISE
(R1) PARK ADDITION TO BEND BY ROBERT GOULD PE632,
RECORDED 5-5-1910, CS08722
(R2) SURVEY BY GLENN EASTMAN, PLS 2575, FILED
12-19-2007, CS17596
(R3) SURVEY BY RICHARD BRYANT, PLS 920, DATED
9-1-1998, CS13384
(R4) SURVEY BY JOHN EATON, PLS 252, FILED
12-10-1966, CS08792