Loading...
HomeMy WebLinkAboutSurvey 21186LOT 43 D I A M O N D Found 5/8" Iron Rod LOT 44 Found 5/8" Iron Rod w/"LS 2527" Cap N89'47'56"E w/No Cap per (R2) per (R2) 8.33' (R2) N89'46'50"E N89'47'56"E 60.00' (R2) 8.23' (M) N89'46'50"E 60.16' (M) � 85.99' (P), 86.00' (R1) Held 1/2" Iron Pipe w/"POVEY & ASSOC." Cap per (R1) B A R R A N C H P H A S E (R2) monument searched LOT 45 and not found N89'47'56"E N89'46'50"E 60.00' (R2) 17.61' (M) Existing Shed Encroachment CURVE TABLE CURVE RADIUS LENGTH CHORD BEARING DELTA C1 M 10.00' 10.83' 10.31' S60'45'20"W 62'04'40" C1 R1 10.00' 10.83' 10.31' S58'46'33"W 62'02'49" C2 M 38.00' 52.58' 48.48' S67' 16' 14"W 79' 16' 19" C2 R1 38.00' 52.55' 48.46' S67-22'06"W 79' 13'56" -- Z L� c6 � Q m LEGEND co LOT 52 LOT 53 L'' rn O = Found monument as noted 0 0 = Set 5/8" Iron rod with blue plastic cap � marked "COLS LS69432" r 0 - (R1) = Ni-Lah-Sha, Phases 2 and 3 by Robert R. Povey o Q filed 10/22/1999 (CS13822) z M (R2) = Diamond Bar Ranch, Phase 2 by Jerry D. Stichler filed 10/04/2004 (CS16098) (P) = Proportionate Measurement (M) = Measured G2 0 to N 0 0 N Held 1/2" Iron Pipe w/"POVEY & ASSOC." Cap per (R1) N89' 17'04"E 32.27' (M) N89'47'57"E 32.37' (R1) LOT 47 Held 3/4" Iron Pipe w/No Cap per (R1) A P A C H E G1 Held 3/4" Iron Pipe w/"POVEY & ASSOC." Cap per (R1) C 0 U R T LOT 48 2.4' Held 1/2" Iron Pipe ---/ w/"POVEY & ASSOC." Cap per (R1) .s� N89'46'50"E 198.58' (M) N89'47'56"E 198.60' (R1) Existing Shed �06 (D 0 Lnt') Ln 0 U-) N 0 0 0 0 zZ LOT 51 2 120.00' (R2) LOT 46 119.97' (M) 60.00' (R2) 112.59' (P), 112.60" (R1) SURVEYOR'S CERTIFICATE: Found 5/8" Iron Rod w/"LS 2527" Cap per (R2) I, Kevin James Blakley, a Registered Professional Land Surveyor No. 69432 in the State of Oregon, do hereby certify that I or those under my direct supervision have made a survey of the lands shown on this plat of survey and further certify that said lands were correctly surveyed according to State Statutes and the Rules of Common Law. SURVEYOR'S NARRATIVE: The purpose of this survey was to re-establish the Northeast corner of Lot 52, Ni-Lah-Sha, Phases 2 and 3, Deschutes County, Oregon. Control for this survey was based on the plat of Ni-Lah-Sha, Phases 2 and 3, recorded as CS13822, and existing monuments found during the course of this survey from said plat. Basis of bearings for this survey is the West line of Lot 52 per said plat of Ni-Lah-Sha, Phases 2 and 3. All monuments were held during the course of this survey. Proportionate measurement method was then used to re-establish the said Northeast corner of said Lot 52. Monuments found and set during the course of this survey are as shown on the subjoined survey map. Deed Reference: Vol. 2021, Pg. 361, Deschutes County Official Records LOT 47 N89'47'56"E 10.24' (R2) N89'46'50"E 10.23' (M) Held 3/4" Iron Pipe w/"POVEY & ASSOC." Cap per (R1) coin y SUFMEY02 ' p Z= '; C_,0jjo7S BOUNDARY SURVEY LOT 50 OCTOBER 25, 2023 LOT 52, NI-LAH-SAA, PHASES 2 AND 3, LOCATED IN THE NORTHEAST ONE -QUARTER OF THE SOUTHWEST ONE -QUARTER OF SECTION 3, TOWNSHIP 15 SOUTH, RANGE 13 EAST, WILLAMETTE MERIDIAN, CITY OF REDMOND, DESCHUTES COUNTY, OREGON REGISTERED PROFESSIONAL LAND SURVEYOR OREGON JANUARY 9, 200 LOT 49 KEVIN JAMES BLAKLEY 69432 RENEWABLE 12-31-2025 E4 0 a d♦ E4 0 1.4 PREPARED BY: CENTRAL OREGON LAND SURVEYING, LLC, 2809 NW 11 TH STREET, REDMOND, OREGON 97756 (541) 420-0082 Eva CLIENT: BRYNNA FERGUSON W.O. # 23-50 PLATE ONE OF ONE