AGENDA REQUEST & STAFF REPORT
For Board Business Meeting of April 28, 2014
Please see directions for completing this document on the next page.
DATE: Apri123,2014
FROM: George Kolb, County Engineer Road 541-322-7113
TITLE OF AGENDA ITEM:
Consideration of Board Signature of Order No. 2014-013, Setting a Temporary Speed Limit of25 miles
per hour on Skyliners Road within the Construction Zone for the Sky liners Waterline Installation
Project.
PUBLIC HEARING ON THIS DATE? NO.
BACKGROUND AND POLICY IMPLICATIONS:
The City of Bend is in the process of installing their waterline in Sky liners Road. As part of this
project, traffic on Skyliners Road will be limited to one lane through the construction area. Once the
contractor is past the subdivision, which has a speed limit of 25 mph, they will be working within a 45
mph speed limit. The contractor is requesting that a construction speed zone be installed to slow traffic
down and increase safety within the work area. After review of the plans, it was decided to have a
construction speed zone of 25 mph established by order of the BOCC during construction. Per ORS
810.180(8), A road authority may establish by ordinance or order a temporary designated speed for
highways that is lower than the statutory spreed. This 25 mph speed zone will apply only within the
work zone as shown on Exhibit nAn that is attached to the Order. This speed zone with also move in
conjunction with the pipe line installation. The necessary signs for this speed zone will be installed by
the contractor. This speed zone will be in effect for the duration of the pipe installation on Skyliners
Road.
FISCAL IMPLICATIONS:
NONE
RECOMMENDATION & ACTION REQUESTED:
Move approval of Board Signature of Order No. 2014-013, Setting a Temporary Speed Limit of25
miles per hour on Skyliners Road within the Construction Zone for the Sky liners Waterline Installation
Project.
ATTENDANCE: George Kolb, County Engineer
DISTRIBUTION OF DOCUMENTS:
Copy of this Order returned to Sheila OdIe (ext. 7148) at the Road Department
l
REVIEWED
LEGAL COUNSEL
For Recording Stamp Only
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON
An Order Setting a Temporary Speed Limit of
25 miles Per Hour on Skyliners Road within ORDER NO. 2014-013
the Construction Zone for the Skyliners
Waterline Installation Project.
WHEREAS, the Deschutes County Road Department, pursuant to the provisions of ORS
810.180(8), has determined that the construction of the City of Bend waterline on Skyliners Road has
altered the character of the roadway to the extent that a speed lower than the statutory speed is
necessary; and
WHEREAS, the design constraints for the work zone necessary for the installation of the
waterline on Skyliners Road requires a temporary speed of 25 mph to insure the safety of the workers
on the project and the traveling public; and
WHEREAS, this speed zone will be moved in conjunction with the pipe line installation; and
WHEREAS, based upon said engineering determination of danger to the public, the County
Engineer has found that when the speed designated in ORS 811.105 or ORS 811.111 or by
permanent written order is greater than the speeds designated below, a temporary speed reduction to
lessen the risk to the public and construction workers is desirable; now, therefore
THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON,
HEREBY ORDERS as follows:
Section 1. That the designated speed for the following section of roadway be as follows:
Name: Skyliners Road
Project Name: Surface Water Improvement Project, Raw Water Conduit
Designated Speed: 25 miles per hour
Location: Within the designated construction area as shown on attached Exhibit "An. This
speed zone will move in conjunction with the pipe line installation.
Section 2. That the Contractor shall install appropriate signs giving notice of the designated
speed per ORS 810.180, Subsection 8(d).
Section 3. That the signs installed pursuant to this order comply with the provisions of ORS
810.210 and 810.220.
PAGE 1 OF 2-ORDER No. 2014-013
l
t
Section 4 That this speed zone will be in effect for the duration of the waterline installation
project
Section 6. That this Order shall be recorded with the Deschutes County Clerk, and copies
shall be filed with the Deschutes County Surveyor and County Assessor.
DATED this __day of ________, 2014.
BOARD OF COUNTY COMMISSIONERS
OF DESCHUTES COUNTY, OREGON
TAMMY BANEY, CHAIR
ATTEST: ANTHONY DEBONE, VICE CHAIR
Recording Secretary ALAN UNGER, COMMISSIONER
PAGE 2 OF 2-ORDER No. 2014-013
Exhibit "A"
www.invarion.com
. RY& SONS
CONSTRUCTION
Slllm , Orogon
Date: 04/23/2014 Author: Emery & Sons Construction Project: CITY OF BEND SURFACE WATER IMPROVEMENT PROJECT
Label: S liner Rd. One Lane Closure TCP
Comments:
-To be used for construction work along Skyliner Rd . in accordance to specification section 01300 .
standard drawings.
-One travel lane with a minimum width of 10 feet to be maintained around construction work area . Maximum traffic wait time is
not to exceed 30 minutes.
-All signing are to be per MUTCD standards .
3 ~
Q> 3 ~'8:> ~
(C Q>"'-<
Legend
Barrier
a traffic light
~Work Area
1 Tubular