Loading...
HomeMy WebLinkAboutSite Plan Review DiscussionCommunity Development Department Planning Division Building Safety Division Environmental Health Division 117 NW Lafayette Avenue Bend Oregon 97701-1925 (541)388-6575 FAX (541)385-1764 http://www.co.deschutes.or.us/cdd/ MEMORANDUM DATE: July 30,2012 TO: Board of County Commissioners FROM Tom Anderson, Director SUBJECT: Discussion on Limited Site Plan Reviews Background: The Board recently reviewed an application for a fee waiver related to a site plan review, where the addition to the commercial building appeared to be of a comparatively small size. The Board requested that a future discussion be held, focusing on how often these types of site plan reviews are required, and how the cities of Bend, Redmond and Sisters address them. Discussion: Deschutes County Code (DCC) requires that a Site Plan Review be performed for all commercial uses that require parking facilities, including building footprint expansions per DCC 18.124.030(B)(2). Staff reviews the applicants building plans, conducts a site visit, references the original land use approval, and assesses the proposal with respect to parking, traffic circulation, landscaping, access, bicycle parking, service/delivery areas, retaining walls, signage, walkways, buffering/screening of surrounding uses, and other elements. If the size of the addition relative to the size of the original building is 25% or less, the fee is $805. The attached spreadsheet lists aI/ site plan reviews over the past 4 % years where the size of the addition relative to the original building was less than 50%. There have been eleven, including the recently discussed application. or an average of 2-3 per year. The attached also describes how each of the cities characterizes these types of reviews. Similar to Deschutes County. the City of Bend charges a reduced fee for a smaller (50% of original) addition. The City of Redmond exempts all additions of 25% or less from site plan review, while the City of Sisters provides for no exemption or Significantly reduced fee. Requested Board Action: Following discussion, direct staff to: 1. Maintain the existing site plan review criteria and fee structure. 2. Modify the fee structure for site plan reviews. 3. Modify* DCC 18.124 to: a. Exempt additions of 25% or less (with a maximum size) from site plan review b. Modify the review criteria for limited site plan reviews c. Other modification *Modification of county land use code requires review by and recommendation from the County Planning Commission, as well as formal adoption by the Board of County Commissioners. Deschutes County Limited Size* Site Plan Reviews 2008-2012 *- Less than 50% of original building size Size of File #Year Description Addition (sq ft)Original sq ft % change 1 SP085 2008 High Desert Mus. bldg addition 1,600 46,900 3.4% 2 SP0832 2008 Willamette Graystone addition 147 18,943 0.8% 3 SP0839 2008 Redmond fire station addition 600 4,937 12.2% 4 SP103 2010 Bend Research deck addition 696 15,560 4.5% 5 SP105 2010 Sunriver Ice rink remodel 1,414 5,826 24.3% 6 SP1011 2010 Sunriver Comm Church addition 343 9,717 3.5% 7 SP1015 2010 Bend Research addition #2 934 15,322 6.1% 8 SP1018 2010 Terrebonne gas station addition 198 1,000 19.8% 9 SP114 2011 Bi-Mart addition 7,524 34,240 22.0% 10 SP126 2012 Tollgate poolhouse addition 1,481 3,327 44.5% 11 SP1214 2012 Restaurant add (Lucky Fortune)216 1,734 12.5% Limited Size Site Plan Review Provisions - Local Jurisdictions Deschutes County Fee is less for site plan reviews where addition is less than 25% of the original structure. ($785 vs $1,885/$2,605) City of Bend Where addition is 50% or less of the original structure, a "Type I" review may be performed. The fee is $851, vs $2,196/$7,913. City of Redmond All additions less than 25% of the original structure, up to a maximum of 1,000 sq ft, are exempted from site plan review. City of Sisters Any addition requiring a building permit are required to apply for site plan review. Fees are on a sliding scale ranging from $2,000 to $4,000.