HomeMy WebLinkAbout83-039Y
9532009
VOL 47 PACE 521
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON
An Ordinance Amending Ordin-
ance No. 81-043, Deschutes
County Subdivision/Partition
Ordinance, To Provide Solar
Access Performance Standards * L
For New Development and * r
Protection of Solar Access JUN 81983
Through Solar Height * �7ARY
Restrictions. * SUEpENVOLLOW, Co. CLERK
ORDINANCE NO. 83-039
THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY,
OREGON, ORDAINS as follows:
Section 1. Section 1.010, INTRODUCTORY PROVISIONS/PURPOSE,
of Ordinance No. 81-043, is amended by the addition of the
following:
"6. To regulate the orientation of streets, lots, and
parcels; the placement, height and bulk of build-
ings; and the placement and growth of vegetation
within the County to insure access to solar
energy by reasonably regulating interests in pro-
perty within the County, as authorized under ORS
215.044, ORS 105.880 through 105.890, and ORS
92.044 to promote and maximize the conservation
of energy by preserving the option to utilize
solar energy and to implement the Comprehensive
Plan policies relating to solar energy.
7. To encourage the design of new buildings, struc-
tures and developments which use solar energy and
protect future options to use solar energy by
protecting solar access."
Section 2. Section 1.040, INTRODUCTORY PROVISIONS/
DEFINITIONS, of Ordinance No. 81-043, is amended by the addition
of the following:
"Solar Access. Protection from shade for a specific
area during specific hours and dates.
Solar Height Restriction. The allowable height of
buildings, structures and vegetation on a property
burdened by the solar access of another property."
1 - ORDINANCE NO. 83-039
VOL 47 PAGE 522
Section 3. Subsection 1(C) of Section 3.025, APPLICATION
PROCEDURE/INFORMATIONAL REQUIREMENTS, of Ordinance No. 81-043, is
amended as follows:
"C. Date of preparation, true and magnetic north and
south, scale and gross area of the proposed
subdivision."
Section 4. Subsection 2 of Section 3.025, APPLICATION
PROCEDURE/INFORMATIONAL REQUIREMENTS, of Ordinance No. 81-043, is
amended by the addition of the following:
"J. The structures, trees, rock outcroppings or other
shade producing objects, if the object will cast
shade from or onto the subdivision."
Section 5. Subsection 3 of Section 3.025, APPLICATION
PROCEDURE/INFORMATIONAL REQUIREMENTS, of Ordinance No. 81-043, is
amended by the addition of the following:
"N. Solar Access.
(1) Provide a statement relative to the solar
access to be provided by the subdivision
plan.
(2) Determine the location and type of street
trees, if proposed."
Section 6. Section 4.030, INFORMATION ON PLAT, of Ordinance
No. 81-043, is amended by the addition of the following:
"8(A). Southern Building Line. The southern building
line shall be shown on each lot which is bene-
fited by solar height restrictions on burdened
lots within the subdivision."
8(B). Solar Height Restriction. The solar height
restriction shall be shown on the plat for each
lot burdened by the solar access of another
lot."
Section 7. Subsection 5 of Section 6.030, LOTS, GENERAL
REQUIREMENTS, of Ordinance No. 81-043, is amended as follows:
"5. Solar Access Performance Standard. As much solar
access as feasible shall be provided each lot in
every new subdivision, considering topography,
development pattern, and existing vegetation.
The lot lines of lots, as far as feasible, shall
be oriented to provide solar access at ground
level at the southern building line two hours
2 - ORDINANCE NO. 83-039
VOL
before and after the solar zenith from September
22 to March 21. If it is not feasible to provide
solar access to the southern building line, then
solar access, if feasible, shall be provided at
10 feet above ground level at the southern
building line two hours before and after the
solar zenith from September 22 to March 21, and
three hours before and after the solar zenith
from March 22 to September 21.
This solar access shall be protected by solar
height restrictions on burdened properties for
the benefit of lots receiving the solar access
If the solar access for any lot, either at the
southern building line or at 10 feet above the
southern building line, required by this per-
formance standard is not feasible, supporting
information must be filed with the application.
DATED this IS+- day of _j j^eLf'_ , 1983.
ATTEST:
QQ%�USAN STONEMAN
Recording Secretary
3 - ORDINANCE NO. 83-039
BOARD OF COUNTY COMMISSIONERS
OF DESCHUTES COUNTY, OREGON
. YOLK, C
47 PAuE 523
PW TE, Commissioner
. TUTTL4, Commissioner