Loading...
HomeMy WebLinkAbout2020-06-04 - BPAC Minutes 117 NW Lafayette Avenue, Bend, Oregon 97703 | P.O. Box 6005, Bend, OR 97708-6005 (541) 388-6575 bpac@deschutes .org www.deschutes.org/bpac MEETING MINUTES DESCHUTES COUNTY BICYCLE AND PEDESTRIAN ADVISORY COMMITTEE Thursday, June 4, 2020, 12:00 to 1:30 pm Virtual Zoom Meeting Members Present: Dave Thomson, Christopher Cassard, Ann Marland, Rick Root, Dave Roth, Mark Smith, Sam Handelman, and Wendy Holzman. Agency/Organization: Tanya Saltzman (Deschutes County – CDD), Ashley Hooper (Cascades East Transit/COIC), Chris Cheng (ODOT) Call to Order Meeting was called to order at 12:00 p.m. Introductions Tanya provided a brief introduction of virtual meeting procedures via the Zoom platform. Attendees of the meeting introduced themselves and, if applicable, identified the organization they represent. Approval of Prior Minutes The May 2020 minutes were approved with additions to the attendees (Rick Root and Dave Roth). Public Comment There were no public comments. General Updates - Dave  Membership openings: Tanya will coordinate with the County to put out a press release announcing recruitment for four members. A subcommittee will then conduct interviews— number and format to be determined depending on the number of applicants. Wendy, Chris, and Mark expressed interest in being on the subcommittee. Subcommittee Updates Trails subcommittee – Chris Community connections subcommittee – Sam  Both committees had no specific updates but expressed interest in moving forward, noting that the ball is somewhat in the County’s court rather than individual communities with respect to trails. Participation in the TSP is critical to this. Page 2 ODOT Updates - Chris Chris provided a rundown on numerous active ODOT projects and how they may relate to bike-ped issues:  U.S. 97 Terrebonne Lower Bridge Way: Construction to begin in 2022. Pedestrian concerns around the school; potential Sisters to Smith Rock bicycle route  OR 242 McKenzie Pass: Paving project will widen and add bicycle parking. Construction slated for 2022  OR 126 Redmond-Powell Butte: Primarily a paving project with some sidewalk infill  Bend North Corridor (between Cooley and OB Riley): interchange realignment, future roundabouts, and a future multi-use path. More details as this project continues.  US 97 Nels Anderson-Romaine Village: Primarily repaving and general cleanup. ODOT is looking into potentially using Nels Anderson as a bicycle route.  US 20 Tumalo-Cooley: New roundabout in Tumalo plus repaving; there is potential for a below-grade multi-use path but this part of the project lacks funding  US 20 Mervin Sampels-Greenwood: As previously discussed, buffered bike lanes, a 2-stage left turn at OB Riley intersection  US 20 3rd Street-Purcell: Paving, enhanced crossing at 4th Street, realigning the 12th Street RRFB  US 20 Ward-Hamby Roundabout: safety project, replacing the intersection with a roundabout; widening of shoulders with potential for sidewalk  Bend-Lava Butte multi-use path: In planning now; soon will narrow down potential alignments. More to come in future BPAC meetings  Lava Butte-La Pine multi-use path: Currently has planning funding only  US 97 S. Century to USFS boundary: primarily repaving Chris requested feedback on KPM (Key Performance Measure) metrics for bike lanes and sidewalks in jurisdictions. The current structure is not an effective measure for many reasons, such as jurisdictional transfers, and lacks nuance. He welcomes any idea on how to improve this to provide more detail, or examples from other locations. Committee Reports  COACT: County Commissioner Patti Adair is now the chair. Many communities weighed in on transportation in relation to COVID  Bend MPO TAC: The Bend TSP will have a draft online shortly; additional updates from the TAC will be provided via email in the interest of time. Regional Updates  South County: Observation: Paths have been extra busy during COVID, almost to the point of overcrowding Page 3  Sisters: New trailhead to Three Creeks Lake is almost complete  Deschutes County:  Board approved adding US 20/Cook-O.B. Riley and US 20/Old Bend-Redmond roundabouts to the County TSP  County is developing a Scope of Work for TSP consultant; the TSP will include an advisory committee on which a BPAC member will serve  Onsite construction work has begun on the Sisemore Rd Bridge Rehabilitation project. The project includes repair and strengthening of the historic Bull Creek Bridge on Sisemore Rd. The project is anticipated to be completed by September 18, 2020. Sisemore Rd will be closed at the bridge to all traffic (including bike and pedestrian traffic) for the duration of the project.  COIC/CET: As of June 1, CET is almost back to full force with regular weekday service (still no weekend service however). The La Pine-Sunriver route launched; since it is a pilot project, there is potential for the route to change with demand. Administrative note: Due to time constraints, the discussion of the Summit and of BPAC’s position on e-bikes will be pushed to next month’s meeting. Meeting Adjourned at 1:30 pm Next Meeting Thursday, July 2, 2020 – 12:00 to 1:30 pm Virtual Meeting